Project Proposal for Development of
Chu River Basin Management Plan
SC meeting for the EUWI NPD on IWRM in Kyrgyzstan
Presentation by Leif Iversen, Consultant, October 2012
Copyrig
ht
© 2
012 G
rontm
ij A
/S
Copyrig
ht
© 2
012 G
rontm
ij A
/S
2
This document is a Project Proposal
• Presentation at the Steering
Committee Meeting
• Modification as necessary
• Presentation to potential
funding agencies
• Preparation of detailed Terms
of Reference
• Funding
• Implementation
Copyrig
ht
© 2
012 G
rontm
ij A
/S
3
Overall Objectives
• Improve livelihood of
population through
sustainable utilisation of
water resources
• Improve water quality of the
Chu River Basin
Copyrig
ht
© 2
012 G
rontm
ij A
/S
4
Reaching the Objectives
Improving livelihood, improving water quality
1. Development of River Basin Management Plan, including a
River Basin Action Plan.
2. Establishment of organisational framework.
3. Establish an on-going process with stakeholder involvement.
Copyrig
ht
© 2
012 G
rontm
ij A
/S
5
Project Strategy - 4 elements
1. Stakeholders are involved through a consultative process;
• National and local.
• Development, implementation and continuous operation.
• Participation ensures cooperation and ownership.
2. Implement through a three-phased approach;
• Several activities are implemented in parallel.
• Mobilisation of stakeholders at an early stage.
3. Launch a number of pilot projects;
• Provides guidance on implementation on large scale.
• Allows for flexible adjustments to the Action Plan.
4. Capacity building of local institutions
• All activities have in-built elements of knowledge transfer
Copyrig
ht
© 2
012 G
rontm
ij A
/S
6
3 Phase Project Implementation
1. Analysis of the Basin
2. Development of Scenarios and Basin Plans
3. Implementation Measures
Chu RBMP
Copyrig
ht
© 2
012 G
rontm
ij A
/S
7
3 Phase Project Implementation
1. Analysis of the Basin
2. Development of Scenarios and Basin Plans
3. Implementation Measures
Chu RBMP
Copyrig
ht
© 2
012 G
rontm
ij A
/S
Stakeholder involvement
• Government Bodies,
• Industries, Agriculture,
• Population,
• Downstream (Kazakh) users.
Dynamics:
• Conflicts and synergies.
Participation mechanisms:
• Meetings, hearings, boards.
8
PHASE 1. - Analysis of Basin (1) - Stakeholders
Copyrig
ht
© 2
012 G
rontm
ij A
/S
Will guide the wider
implementation
Examples:
• Small scale baseline
studies
• Sub-basin Modelling
• Capacity building at local
level
• Development scenarios
for sub-basin
• Involve CDWU’s in water
management
9
PHASE 1. - Analysis of Basin (2) – Pilot Projects
Copyrig
ht
© 2
012 G
rontm
ij A
/S
Description of natural resources:
• Basin boundaries, water quality and quantity, weather conditions,
soil, vegetation, wildlife, mineral resources, etc.
Description of trends and developments:
• Water ecology, pollution, deforestation, exploitation.
Monitoring system for natural resources:
• Monitoring condition of natural resources,
• Institutional structure for monitoring and reporting
10
PHASE 1. - Analysis of Basin (3) – Baseline Study
Copyrig
ht
© 2
012 G
rontm
ij A
/S
1. Inventory of Land Use
2. Assessment of vulnerability - present + future activities
3. Impact of climate changes
11 11
PHASE 1. - Analysis of Basin (4) –
Pressures on water resources
Copyrig
ht
© 2
012 G
rontm
ij A
/S
12
3 Phase Project Implementation
1. Analysis of the Basin
2. Development of Scenarios and Basin Plans
3. Implementation Measures
Chu RBMP
Copyrig
ht
© 2
012 G
rontm
ij A
/S
13
PHASE 2 - Scenarios and Basin Plans (1)
1. Priorities and objectives
2. Long-term goals
3. Short-term goals
4. Water allocation
5. Scenarios
Action Plans
From priorities and objectives to action plans:
Copyrig
ht
© 2
012 G
rontm
ij A
/S
14
PHASE 2 - Scenarios and Basin Plans (2)
Planning and
management
Resolving conflicts Communication
•Forecasting scenarios
•Models
•GIS
•Location of personnel
•Supervison
•Committees
•etc
•Intergroup communication
•Special committees
•Transboundary water
agreements
•Village meetings
•Etc
•Information procedures
•Databases
•Newsletters
•Meetings
•Website
•etc
Overall Basin Action Plan
• Strategy, measures to achieve goals, implementation guidelines, ”who does what”
Sub-Basin Action Plans
• Detailed description of action and responsibilities
Copyrig
ht
© 2
012 G
rontm
ij A
/S
15
3 Phase Project Implementation
1. Analysis of the Basin
2. Development of Scenarios and Basin Plans
3. Implementation Measures
Chu RBMP
Copyrig
ht
© 2
012 G
rontm
ij A
/S
16
PHASE 3- Implementation Measures (1)
Financing Measures for water use and management
• Economic instruments, cost recovery basis
• Financing of institutions for water management
Copyrig
ht
© 2
012 G
rontm
ij A
/S
17
PHASE 3- Implementation Measures (2)
Responsibilities and Schedules for Implementation
• Plan of implementation (5 years and 20-years)
• Basin Management Organisation
• Information Processes and Feedback Mechanisms
Copyrig
ht
© 2
012 G
rontm
ij A
/S
PHASE 3 - Implementation Measures (3)
Co-ordination tools for basin organisations
Planning and
management
Resolving conflicts Communication
•Forecasting scenarios
•Models
•GIS
•Location of personnel
•Supervision
•Committees
•etc
•Intergroup communication
•Special committees
•Transboundary water
agreements
•Village meetings
•etc
•Information procedures
•Databases
•Newsletters
•Meetings
•Website
•etc
18
Copyrig
ht
© 2
012 G
rontm
ij A
/S
PHASE 3 - Implementation Measures (4) - matrix
Chu River Basin Management Plan. Matrix for development of plan
Basin natural resources
Inventories Assessments of needs and vulnerability
Stakeholder analysis
Analyses of priorities
Basin and sub-basin goals
Objectives for water allocation and quality
Development scenarios
Action Plans Financing arrangements
Responsibilities and schedules for implementation
Monitoring programme
Description of natural resources (water, soil, vegetation, mineral resources, etc.
Inventories of land use (agriculture, pastures, urban, industries, mining, etc.)
Assessment of needs of aquatic ecosystems (water quality and quantity, reduced impact).
Analysis of stakeholders’ needs (communities, agriculture, industries, utilities, etc.)
Analysis of key priorities for communities and government (economic development, agriculture, protection of an ecosystem, etc.)
Define long term goals (10-20 years) with regard to aquatic environment, economic development and stakeholders’ management.
Set objectives for water allocations to users (ecosystems, agriculture, human consumption, industries, fisheries, energy, tourism, etc.).
Prepare scenarios for economic development, increased population and settlements. Forecast water demand
Describe Objectives and strategy for the Basin Action Plan including implementation measures (“who does what and when”) to achieve the goals.
Determine financing arrangements for water use and management (tariffs, penalties, incentives, etc.
Decide on plan of implementation, including activities, time line, milestones, monitoring events and reporting. Simplify in Gantt chart.
Establish a monitoring programme for all elements in the Basin Management Plan (ecosystem, economic development, population, pollution, management features, etc.).
Description of trends (depletion, climate changes, pollution. Deforestation, etc).
Inventory of water availability (amount of water, demand from sectors, etc.)
Assessment of vulnerability to climate changes, extreme events, droughts and flooding.
Analysis of mechanisms for stakeholders’ participation (committees, hearing, information, advisory boards, etc.)
Define short term goals (5 years) with regards to environment, economic development, management and monitoring mechanisms.
Set objectives for water quality and according to legislation (ecosystems, agriculture, human consumption, industries, fisheries, energy, tourism, etc.).
Prepare scenarios for development in agriculture, industry, energy, etc. Forecast water demand
Describe Objectives and management plans for sub-basins. Describe guidelines for implementation.
Determine mechanisms for financing management of basin action plan and details of cost sharing arrangements for projects and other actions.
Decide on key organisations and individuals responsible for implementation of plan of implementation.
Establish key criteria and milestones in the monitoring programme. Determine criteria for critical intervention.
Description of monitoring programme for state of natural resources.
Inventory of ecosystems (forests, pastures, aquatic systems, no of species, etc.)
Assessment of impact of changing land use and human activity
Prepare risks assessments related to different scenarios of development
Establish Basin Management organization and define tasks and responsibilities.
Inventory of pollution sources (industries, wastewater, agriculture)
(DRAFT Jan 2012, Leif Iversen)
19
Copyrig
ht
© 2
012 G
rontm
ij A
/S
20
3 Phase Project Implementation
1. Analysis of the Basin
2. Development of Scenarios and Basin Plans
3. Implementation Measures
Chu RBMP
Copyrig
ht
© 2
012 G
rontm
ij A
/S
21
Chu River Basin Management Plan
River Basin Management Plan, incl. River Basin Action Plan.
Organisational framework.
On-going process with stakeholder involvement.
Copyrig
ht
© 2
012 G
rontm
ij A
/S
22
Project Management
Steering Committee
PMU
Teams Teams
PMC
Teams Teams
Stakeholders
Copyrig
ht
© 2
012 G
rontm
ij A
/S
23
Timetable for development of RBMP Activity Stakeholders Time
Steering Committee Ministry of Agriculture
and Amelioration
1st quarter 2013
Establish PMU Ministry 1-2nd quarter 2013
Financing Steering Committee
UNECE, OECD, PMU
1-2nd quarter 2013
Revised Proposal Steering Committee
PMU, PMC
2nd quarter 2013
Project preparation with
IFI
Ministry Ministry of
Finance
IFI’s
3-4rd quarter 2013
Identify international
consultants
Steering Committee
Working Group
3-4rd quarter 2013
RBMP Phase 1
Analysis
PMU
River Basin Council
PMC
2014
Phase 2
Scenarios and Basin Plan
PMU
River Basin Council
PMC
2015
Phase 3
Implementation Measures
PMU
River Basin Council
PMC
2016
Copyrig
ht
© 2
012 G
rontm
ij A
/S
24
Resources needed
Government of Kyrgyzstan
• Staff resources
• Working Groups
• Provision of data
• PMU
River Basin Council and local Administrations
• Staff resources, involvement in activities
Budget: Euro 1,750,000
Project Management Consultant
• International Consultants
• National consultants
• Support staff
Resources for
• Data collection and modelling
• Stakeholder activities
• Training and capacity building
• Awareness and information dissemination
• Equipment for River Basin Council and administrations
Copyrig
ht
© 2
012 G
rontm
ij A
/S
25
Next steps:
Step 1: Comments from IWRM Steering Committtee
• Contents
• Further work
Step 2: Consultant discuss with International Financing Institutions
• Scope of proposal
• Budget
• Revise Proposal
Step 3: Ministry can send proposal to IFI’s
Budget: Euro 1,750,000
Copyrig
ht
© 2
012 G
rontm
ij A
/S
26
Thank you for your attention
Leif Iversen, Consultant, [email protected]