Upload
lee-griffin
View
27
Download
7
Embed Size (px)
DESCRIPTION
2010 2011 2011/12 2012. Key: Concept/Feasibility Planning Construction Completion. PROJECT NAME: INTERNATIONAL TRADE CENTRE. THEME: PORT CENTRIC DISTRIBUTION (SUPERPORT). REACH: NORTH WEST REGION. REF: XX. - PowerPoint PPT Presentation
Citation preview
PROJECT OVERVIEW LOCATION
KEY BENEFITS PLANS AND IMAGES
DELIVERY: TIMELINE FURTHER INFORMATION
PROJECT NAME: INTERNATIONAL TRADE CENTRE THEME: PORT CENTRIC DISTRIBUTION (SUPERPORT)
REACH: NORTH WEST REGION REF: XX
Peel are proposing two sites for the construction of an International
Trade Centre in the Northwest.
This would be a facility in excess of 1 million square feet to enable
Chinese, Indian or other emerging economies to exhibit, sell and even
distribute their goods into UK, Irish and European markets.
The facility may include showroom spaces, warehousing facilities,
assembly plant and would make use of multiple connectivity via road,
rail and water.
The synergy and connectivity of SuperPort, Ports and Airports, as
well as the Liverpool Waters and Wirral Waters developments, help to
bring this initiative together. Key Facts:•1 million + square feet.
•Chinese ‘Gateway’ to UK and European markets.
•Showroom space for > 1,000 Chinese / International companies.
•Motorway, rail, air and port connectivity.
•Peel seeking Chinese partners.
The two sites proposed are:
•Port Bridgewater adjacent to Ellesmere Port•West Float within Wirral Waters
Both sites would benefit from direct road, rail and water transport connections.
Peel would offer an economically beneficial package of Port-to-Door rates making the Port of Liverpool the best solution for incoming goods over and above all southern UK ports.
Companies wishing to take space to exhibit their goods would have immediate access to all UK, Irish and European markets at a 1-2 hour travel distance via direct flights to Liverpool John Lennon Airport.
Peel Contact: Naomi Peck
Telephone: 0161 629 8435
Website: www.peel.co.uk
Key: Concept/Feasibility Planning Construction Completion
2010 2011 2011/12 2012
WEST FLOAT
PORT BRIDGEWATER