23
AP PROJECTS PROJECT CLOSING REPORT 1 ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Project Closing Report Jalandhar

Embed Size (px)

DESCRIPTION

a funky design as per product n great cost reduction

Citation preview

Page 1: Project Closing Report Jalandhar

AP PROJECTS

PROJECT CLOSING REPORT

1ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 2: Project Closing Report Jalandhar

VIVA COLLAGE MALL-JALANDHAR

2ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 3: Project Closing Report Jalandhar

CONTENTS PAGE NO.

INTRODUCTION 4

PROJECT TEAM 5

PROJECT PYRAMID 6

PROJECT INTRODUCTION 7

DESIGN 8

IMPLEMENTAION 11

BEFORE AND AFTER 12

FINISHED STORE INTERNALLY AND EXTERNALLY 16

PROJECT PLANNING 19

BARCHART 20

GRAPHS 223

ROXTON-VIVA COLLAGE MALL(JALANDHAR)

INDEX

Page 4: Project Closing Report Jalandhar

INTRODUCTION

ADDRESS :ROXTON FIRST FLOORFF 22-A VIVA COLLAGE MALLGRANT TRUCK ROADPARAGPUR, NEAR LOVELYUNIVERSITYJALANDHAR-400101

4ROXTON-VIVA COLLAGE MALL(JALANDHAR)

ROXTON IS OFFERING CASUAL BRANDS INTO MENS WEAR.ROXTON IS SISTER CONCERN OF RAJHANS EXPORTS WHICH IS THIRD BEST TR IMPORTERS.ROXTON PROMISES HUNDRED PLUS RETAIL OUTLETS ACROSS THE COUNTRY BY 2011.ROXTON HAS ALREADY MADE ITS PRESENCE IN CITIES LIKE DELHI,MUMBAI.CHHATTISGARH,HARIYANA & PUNJABTHE STORE HAS CUSTOMER SERVICE DESK TO HELP CUSTOMER WITH ITS RELATED SERVICES

Page 5: Project Closing Report Jalandhar

PROJECT HEAD MR. ARVIND PUROHIT

ARCHITECT: MR. BV RAGHAV

(IIT)

PROJECT MANAGER-SURESH TIWARI

PROJECT ENGINEER-. MR.SURJEET DHIMAN

& SITE EXECUTION TEAM

PROJECT TEAM

5ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 6: Project Closing Report Jalandhar

PROJECT PYRAMID

6ROXTON-VIVA COLLAGE MALL(JALANDHAR)

PROJECT INTRODUCTION

DESIGN

IMPLEMENTATION

PRODUCT STUDY W.R.T. MARKETDESIGNING AS PER THE PRODUCT’S REQUIRMENTPROJECT BUDGETING

CUSTOMER SATISFACTIONAPPROVALS

REALISING THE APPROVED DRAWINGSSITE SURVEYPROJECT EXECUTION

SUGGESTION IN DESIGN AS PER SITE SURVEY

Page 7: Project Closing Report Jalandhar

PROJECT INTRODUCTION

7

ROXTON’S PRODUCT

MARKET STUDY TO DESIGN SHOW ROOM FOR ROXTON

VALUE ENGINEEERING FOR ROXTON

COMPETITORS ROXTON HAS VERY TOUGH COMPETIOTRS IN THE MARKET

ROXTON REQUIRES MORE FOOTFALL OF CUSTOMERS

CUSTOMER AGE GROUP IS 18 YEARS OLD TO 40 YEARS OLD

THE SHOWROOM REQUIRES A ROUGH AND ATTRACTIVE LOOK

THE COST CUTTING HAS TO BE LESS BY 30% WITH EXISTING ONE & MANY MORE….

ROXTON SPENDS ABOUT 20 LACS ON PER STORE

SHOWROOM HAS ONLY STATIC AND FORMAL LOOK

BREAK UP OF B.O.Q. WITH DETAIL COST ANALYSIS

POINTING TOWARDS HIDDEN COST DUE TO POOR DESIGN

Page 8: Project Closing Report Jalandhar

DESIGN

3D-MODELINGSOFTWARES

CATIA

COST ANALYSIS

COST CUTTING OF ALMOST 50%

STATIC + DYNAMIC 3D-MODELING AND DESIGN

PROPOSED AN AUTO-FOCUSED MODIFIED BIKE ON CEILING

A ROUND S.S. GANDOLA AT THE CENTRE

A SEMI ROUND CASH COUNTER AT THE BACK OF STORE

A ROUGH AND DARK LOOK TO OVER ALL STORE

M/S/ POWERDE COATED FIXTURES

LIGHTING WITH CALCULATED INTENSITY

IRONICALLY POSTIONING OF MIRRORS

SYMMETRICAL PLACING OF DUCTING AND FIREFIGHTING PIPIES

A VERY ATTRACTIVE BLUE ILLUMINATED TRANSPARENT LOGO

Page 9: Project Closing Report Jalandhar

COSTDIFFERENCE

02468

1012141618

PREVIOUS DESIGNAP PROJECTS DESIGN

COSTIN

LACS

ROXTON-VIVA COLLAGE MALL(JALANDHAR) 9

Page 10: Project Closing Report Jalandhar

0

20

40

60

80

100

ROXTON'S PREVIOUS

DESIGN

AP PROJECTS DESIGN

FOOT FALL IN THE MALL

FOOT FALL IN OTHER SHOPS

FOOT FALL IN ROXTON'S STORE

10

FOOT FALL IN SHOP

FOOT FALLIN %

THE ABOVE REPORT IS BASED ON A SURVEY CONDUCTED FOR A MONTH IN JALANDHAR VERIFIED AND APPROVED BY ROXTON

ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 11: Project Closing Report Jalandhar

STORE LAYOUT11

ROXTON-VIVA COLLAGE MALL(JALANDHAR)

IMPLEMENTATION

Page 12: Project Closing Report Jalandhar

BEFORE AND AFTER

12ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 13: Project Closing Report Jalandhar

BEFORE AND AFTER

13ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 14: Project Closing Report Jalandhar

BEFORE AND AFTER

14ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 15: Project Closing Report Jalandhar

BEFORE AND AFTER

15ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 16: Project Closing Report Jalandhar

FINISHED STORE

16ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 17: Project Closing Report Jalandhar

FINISHED STORE

17ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 18: Project Closing Report Jalandhar

FINISHED STORE

18ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 19: Project Closing Report Jalandhar

PROJECT PLANNING

CUSTOMER SATISFACTION

TIME MANAGMENT

PLANING

19ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 20: Project Closing Report Jalandhar

BAR CHART

20

18-4 19/4 20/1 21/4 22/4 23/4 24/4 25/4 26/4 27/4 28/4 29/4

Material N Tool

Manpower

AP.O.P & CIVIL WORK PLAN

PLASTERING

B.O.Q.

CIVIL1,CIVIL2

TILINGB.O.

CIVIL1,CI

1 ACTUAL

Marking as per dwg, PLAN

Line

P.O.P.(PE1,P

2 ACTUAL

Griding PLAN

B.O.Q.

PE1,PH1,PH2

3 ACTUAL

Fixing of Gypsum sheet as per dwgPLAN

Drill m

PE1,PH1,PH2

4 ACTUAL

Punning of Gypsum sheetPLAN

scrature

PE1,PH1,

PH2

5 ACTUAL

T

ADD.-THANE-RAM MARUTI ROAD

Resourc

Delay due to land lord

Delay due to architectDelay due to Roxton

Planned activiteis

On scheduleDelay due to contractor

COLOUR CODES

ROXTON-VIVA COLLAGE MALL(JALANDHAR)

Page 21: Project Closing Report Jalandhar

CARPENTARY

ELECTRICAL

POP

PAINTIN

G

FIXTURES

NAME BOARD

DUCTING

CIVIL0%

10%20%30%40%50%60%70%80%90%

100%

REWORKEXTRA WORKQTY IN BOQ

COST ANALYSIS

ROXTON-VIVA COLLAGE MALL(JALANDHAR) 21

Page 22: Project Closing Report Jalandhar

TIME MANAGMENT

5 LACS

10 LACS

15 LACS

20 LACS

25LACS

30LAC

35LACS

40 LACS

0

1

2

3

4

5

6

AP PROJECTSOTHER

COST

TIMEIN

MONTHS

ROXTON-VIVA COLLAGE MALL(JALANDHAR) 22

Page 23: Project Closing Report Jalandhar

www.approjects.orgwww.indiamart.com/ap-projects

NO MORE ARCHITECTSNO MORE INTERIOR DESIGNERS

THIS IS SIMPLE INTERIOR ENGINEERING

THANK YOU