ESTABLISHMENT OF NWRI AGENCY

• Report on Institutional options for managing national water resources infrastructure completed;

• Business case for the NWRI Agency completed;

• Cabinet approved proposal for Agency establishment by April 2008;

• Preparation of Agency Bill commenced; and• Advisory Committee on Agency

establishment appointed.

Page 3: PROGRAMME 2 CONT -

3

ESTABLISHMENT OF NWRI BRANCH

• Phase 1: Staff from former Chief Directorate:Development transferred to Branch

(with effect from April 2005);• Phase 2: High level organisational design

completed to establish 4 Chief Directorates, i.e. Construction, Engineering Services, Operations and Business Management.

– Vacant manager posts advertised

All functions related to development and operations of water resource infrastructure to be included in NWRI Branch.

Page 4: PROGRAMME 2 CONT -

4

BERG RIVER WATER PROJECT

• Franschhoek First Policy rolled out:Employment, procurement and training maximized for local communities.

• EMP implementation continued:• Socio-economic strategies;Design guidelines;Environmental specifications;River monitoring programme; andEnvironmental monitoring.

Page 5: PROGRAMME 2 CONT -

5

BERG RIVER WATER PROJECT

ACHIEVED (cont.):

•Socio-economic strategies:Public participation;Compensation & mitigation;Employment, training & procurement;Social monitoring; andSustainable utilisation Plan.

•Construction progress:Advanced works (access roads, village works, housing) substantially complete;Rockfill placement – 70% complete;Intake tower – 65% complete;Spillway – 30% complete; andSupplement - 52% complete.

Impounding of reservoir by June 2007.

Page 6: PROGRAMME 2 CONT -

6

Raising of Flag Boshielo dam– Construction - 94% complete.– Completion delayed by spillage after

heavy late summer rain.

ORWRDP 2A: De Hoop Dam• Planning of dam complete;• Land valuation – 80% complete;• Draft EMPs – 80% complete;• R555 design – 95% complete;• Dam tender design – 85% complete;• No construction yet, awaiting revised

RoD.

Artist’s impression: Proposed De Hoop Dam

Page 7: PROGRAMME 2 CONT -

7

VRESAP

• Projected expenditure (R million)– Actual cost to date : 607,626– Total Project Cost : 2 491,200 – The project fully funded from financial

markets.

Achieved:– Supply and install steel pipes - 60% complete;– Supply and install mechanical, electrical and

civil structures - 60% complete

Project to be completed by October 2007

Page 8: PROGRAMME 2 CONT -

8

VRESAP

Page 9: PROGRAMME 2 CONT -

PROGRAMME 3

WATER SERVICES

Page 10: PROGRAMME 2 CONT -

10

Focus areas

• Ensure provision of sustainable basic water supply and sanitation for improved quality of life and poverty alleviation

• Ensure effective and sustainable delivery of water services to underpin economic and social development

• Ensure effective water services institutions • Ensure effective local level operations and

management of water services schemes• To promote and support sound policy and

practice of water services to achieve water services and sanitation Millenium Development Goals and WSSD targets in Africa

Page 11: PROGRAMME 2 CONT -

11

Water

• Backlog reduced by approximately 1 million people (target: 1,5 million)

• R 1,6 billion allocated to sector through MIG program (target R2 billion)

• 299 schools provided with water

Sanitation

• Backlog reduced by 200 000 households (target 300 000 households)• R1.1 billion allocated through MIG program (target R1,6 billion)• 35 108 buckets replaced (target 476 000 households)• 2041 schools provided with sanitation (target 100% of schools)• National Sanitation Task Team is functioning and is well represented• Health and hygiene strategy developed in collaboration with sector

partners, submitted to Department of Health for approval• Curriculum aligned educational resource materials for grades R – 9

developed, and piloted to 90 schools countrywide. To be rolled out to more schools next year

• Deployed 21 engineers to needy municipalities

Page 12: PROGRAMME 2 CONT -

12

• 74 % of people served with free basic water (target 78%)

• Free Basic Sanitation Strategy developed and submitted to the Minister for approval

• 154 WSAs supported in the development and amendment of WSDPs

• Draft guideline developed to support provinces in development of provincial water sector plans

• 7 out of 9 provinces developed provincial water sector plans

• Gender strategy and training programme developed – to be rolled out in 2006/7

Page 13: PROGRAMME 2 CONT -

13

Water summits:• 9 provincial summits held• Recommendations from summits incorporated into

provincial sector plans to be implemented in 2006/7

Education programme in schools

• Education programme very successful• Five learners received bursaries from DWAF to study

careers in water sector. (Two are studying engineering)• Represented South Africa in international forums and won

international prize

Launched one stop shop and piloted in 7 regions that will enable the municipalities to call for support

Page 14: PROGRAMME 2 CONT -

14

• Developed framework for DWAF local government support plan to be incorporated into the DPLG 5 year plan

• Signed Memorandum of Collaboration with 7 Provincial Departments of Education

• Conducted municipal needs assessment to determine support requirements

Page 15: PROGRAMME 2 CONT -

15

Transfers of water schemes to WSAs

• 48 agreements signed, remaining 10 to be finalised in 2006/7

• 332 water schemes transferred

• Memorandum of Understanding still to be signed by Unions

• Plan to resolve challenges around staff transfers targeting Eastern Cape and Limpopo being developed

• Audits commenced in the year under review and reasonable progress made

• Refurbishment progress reports completed and submitted on quarterly basis to DWAF

Page 16: PROGRAMME 2 CONT -

16

Institutional performance

• 47 % of municipalities meet service quality performance indicators (target: 50% WSAs functioning effectively)

• 64 Water Services Authorities signed off the checklists and ready for publication

• 112 Water Service Authorities completed section 78 (1)

Drinking Water Quality Management

• Developed drinking water quality management system and fully operational in Free State

• 55 % of Water Service Authorities achieved acceptable standards and submitting monthly reports

• Deployed six interns to Water Services Authorities to strengthen capacity

Page 17: PROGRAMME 2 CONT -

17

Key Challenges

• Insufficient engagement with provincial political leadership and IGR structures

• Inadequate funding to meet targets• Capacity constraints at local government level• Existing collaboration structures are currently excluding

water resources• Infrastructure asset management • Reporting by municipalities on non financials ( actual

service delivery)• Behind in eradicating backlog in schools

Page 18: PROGRAMME 2 CONT -

18

Recommendations• Develop a strategy to speed up service

delivery in collaboration with sector departments

• Scale up capacity of DWAF to support local government through the restructuring process

• Strengthen intergovernmental relations• Prioritize and resource local government

support