Prof. Roger FRANK Prof. Roger FRANK
CERMES (ENPC-LCPC)CERMES (ENPC-LCPC)
Tokyo IWM August 2004Tokyo IWM August 2004
PRESENT ISSUES INPRESENT ISSUES INDESIGN AND CONSTRUTION OF DESIGN AND CONSTRUTION OF
MICROPILE SYSTEMSMICROPILE SYSTEMS
1) Present state of European Norms (design, 1) Present state of European Norms (design, construction and testing)construction and testing)
2) Need for well documented field tests and case 2) Need for well documented field tests and case historieshistories
3) Control of installation effects3) Control of installation effects
1) CEN European standards1) CEN European standards
CEN/TC 250CEN/TC 250Date: 2004-08Date: 2004-08
EN 1997-1EN 1997-1CEN/TC 250CEN/TC 250
Secretariat: NENSecretariat: NEN
Eurocode 7 Geotechnical design - Part 1: General rulesEurocode 7 Geotechnical design - Part 1: General rulesEurocode 7 Entwurf, Berechnung und Bemessung in der Geotechnik – Teil 1: Eurocode 7 Entwurf, Berechnung und Bemessung in der Geotechnik – Teil 1: Allgemeine RegelnAllgemeine RegelnEurocode 7 Calcul géotechnique - Partie 1: Règles généralesEurocode 7 Calcul géotechnique - Partie 1: Règles générales
ICS : 93.020; 91.080.01ICS : 93.020; 91.080.01
Under preparationUnder preparation : :
Euronorm on pile load tests (from ETC3 work)Euronorm on pile load tests (from ETC3 work)
2) Micropile design from well documented2) Micropile design from well documented
load tests and case historiesload tests and case histories
1,75 m
,50 m
,25 m
,40
m
,40
m
3,50
m
2,84 m 4,00 m
4,00
m
34,21 NGF
35,10 NGF
20 °
13,5 °
0,65 m0,60 m
LATERAL LOADING TEST
-2
0
2
4
6
8
10
12
14
16
0 100 200 300 400
effort (kN) pr
ofon
deur
sous
la se
mel
le (m
)
AXIAL LOAD ON VERTICAL PILEForce (kN)
Depth
z (m)
( compression )
-2
0
2
4
6
8
10
12
14
16
0 100 200 300 400
AXIAL LOAD ON INCLINED MICROPILE
Depth
z (m)
Force (kN) ( traction )
3) Installation effects3) Installation effects
_______
Movement of the water level
( sea tide, river flow)
_______
Wooden piles :
B = 0,30 m s/B = 4
Micropiles : B = 0,22 m s/B = 10
STABILIZATION OF THE SETTLEMENTS AFTER MICROPILES INSTALLATION
RAILWAY EMBANKMENT STABILIZED BY MICROPILES :
Additional settlement due to the installation of the micropiles
Thank you for your attention !