Salford City College Eccles Sixth Form Centre BTec Level 3 Extended Diploma in Creative Media Production Games Design Unit 66: 3D Modelling - HA3 - Sidekick Production Log Name Christopher Simpson Date Comments Thursday 7.03.13 Created my project schedule which I will keep up to date and review every Sunday I also was still creating my lightbot which was very overdue to be complete I feel I should have created this weeks previously. Friday 8.03.13 I started to put down ideas and get references for my mood board and ideas map which I will continue to add to over the weekend so I have a lot of ideas for my sketches of my sidekick. Saturday 9.03.13 I continued to add ideas and image references to my mood board and ideas map I feel that I have finished these tasks now. Sunday 10.03.13 I reviewed and updated my project schedule as planned. Wednesday 13.03.13 Finished my Lightbot and produced my Project charter I also started and finished my sketches for my Sidekick, Scanned in my images for my sidekick. This was a very late start for these tasks; I should have had these done at least 2 or 3 weeks previously. Thursday 14.03.13 Started my Production log and I started to create my sidekick, I started by putting the scanned images in illustrator and taking the difficult to create objects of the sidekick and drawing them out, I then imported them into Lightwave and modelled them into the shape I wanted. It took me a while to get the hang of using Lightwave without tutorial/guides but I got used to it pretty quickly.

Product log 140313

  • Upload
    xchiip

  • View
    31

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Product log 140313

Salford City CollegeEccles Sixth Form CentreBTec Level 3Extended Diploma in Creative Media ProductionGames Design

Unit 66: 3D Modelling - HA3 - Sidekick Production Log

Name Christopher Simpson

Date CommentsThursday7.03.13

Created my project schedule which I will keep up to date and review every Sunday I also was still creating my lightbot which was very overdue to be complete I feel I should have created this weeks previously.

Friday8.03.13

I started to put down ideas and get references for my mood board and ideas map which I will continue to add to over the weekend so I have a lot of ideas for my sketches of my sidekick.

Saturday9.03.13

I continued to add ideas and image references to my mood board and ideas map I feel that I have finished these tasks now.

Sunday10.03.13

I reviewed and updated my project schedule as planned.

Wednesday13.03.13

Finished my Lightbot and produced my Project charter I also started and finished my sketches for my Sidekick, Scanned in my images for my sidekick. This was a very late start for these tasks; I should have had these done at least 2 or 3 weeks previously.

Thursday14.03.13

Started my Production log and I started to create my sidekick, I started by putting the scanned images in illustrator and taking the difficult to create objects of the sidekick and drawing them out, I then imported them into Lightwave and modelled them into the shape I wanted. It took me a while to get the hang of using Lightwave without tutorial/guides but I got used to it pretty quickly.