Process Control in Weaving

Shri R. P. Tewari

International Polytechnic for Women, New Delhi

Page 2: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Steps Involved During Weaving Operation Selection of yarn for warp and weft purposes

Sizing

Winding

- Spool winding (for warp)

-Pirn winding (for weft)

Preparatory Processes for Sectional Warping

-Creeling

-Hecking

-Denting in section guide reed

-Leasing

Warping on horizontal drum warping machine

Beaming

Drafting arrangement

Denting

Gait-up the loom

Tie up the loom

Weaving

Page 3: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Selection of Yarn for Warp and Weft Purposes

• Proper selection of yarn by the technical supervisor at the

institution for warp and weft.

• Clear instructions to the weaver (Material handling, faults etc)

• Job instruction sheet for a particular design should be

provided.

Page 4: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Sizing

Objectives

-To reduce the end breakage rate by improving the abrasion

resistance and also the tensile strength of the yarn.

-To enhance the weavability.

Precautions

• Use of digital balance.

• Add cold water to the sizing agent.

Sequence of size preparation

-Mixing the adhesive component of size with cold water.

-Addition of wetting agent to the adhesive component.

-Mixing the lubricating agent with boiling water and then adding

it to the mixture of sizing and adhesive component.

-Addition of antiseptic agent to the above.

Page 5: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

-Boiling all the mixed ingredients on slow fire with continuous

stirring.

-Continuation of boiling till the sizing paste becomes

transparent and of constant viscosity. It is checked by lifting the

liquor with the help of a stick.

-The paste is then cooled with continuous stir.

-It is then filtered through fine muslin fabric.

-The boiled and filtered paste is diluted with cold water to the

required volume as per the liquor to material ratio of 10:1.

Page 6: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Confirmation of the readiness of the size paste

Lift the size paste between the thumb and the forefinger and

smudge it for some time. Separate out the two fingers.

Tackiness should be felt while separating the fingers.

Take small amount of size paste and spread it on a clean

glass. Allow it to dry. A formation of thin film on drying

indicates the good preparation of the size paste.

The absence of tackiness and film formation indicates that

the size paste is not properly prepared.

Page 7: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Hank preparation for Sizing

Wetting (use of wetting agent-TRO), Washing and Cleaning.

Conformation of proper wetting

Over and under-squeezing of hanks should be avoided.

Use of hank shaker for squeezing.

Page 8: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Sizing operation

�Use of rectangular sizing tank in stead of round pot.

�Use of cross bars to hang the hanks for sizing.

�Squeeze the sized hank by using hank shaker.

�Over and under-squeezing should be avoided.

Drying of sized hank

�Drying under direct sunlight should be avoided.

�Avoid spreading the hank on the floor.

�Change the position of hanks time to time.

�Avoid over and under drying of the hanks.

�Give jerks by both the hands to prevent entanglement.

�Do not store the sized hanks one over another.

�Hang in a wooden sticks.

Page 9: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

WINDING

Spool Winding (For warp)

� Locate the first and the last end of the hank.

� Proper use of swift stand.

� During winding the thread should come out from the

top side of the swift.

� Location of swift and spool should be parallel and

right direction with respect to each other .

� The threads should be uniformly distributed in the

spool and the bobbin should be tightly wound.

� The filled bobbin should be stocked one over the

other in a rectangular container in vertical position.

Page 10: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Clockwise unwinding of hank from swift

Swift

Warp

Bobbin

(Spool)

Page 11: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Cross-wound end of filled bobbin

Page 12: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Pirn Winding (For Weft)

Proper selection of pirn.

Pirns should be clean and empty.

The metallic portion of the pirn (head & nose) should be rust free.

Knotting of the thread to the pirn should be avoided.

Pirns should be uniformly and tightly filled up.

The broken ends should be joined by piecing. Knotting should be avoided.

Over filling of pirn should be avoided.

Last weft end of the pirn should be crossed around the filled pirn (Fig)

Page 13: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Shape of the filled pirn

Page 14: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Sectional drum warping

Preparatory processes

a) Creeling

-The end of the thread from each bobbin should

be released from the top.

-In order to prevent the entanglement of the

broken ends of the thread tie a strong cord

in tight condition on the center of each section

vertically.

-Use of over filled warp bobbin should be

avoided.

-All the filled bobbins should be of equal weight

and size.

Page 15: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

b) Hecking -The threads of the creel should be divided in odd and even series (all the odd numbered threads should be drawn in to the eye of the heck heald and all the even numbered threads should be drawn in to the dent of the heck).

c) Denting in section guide reed

-Denting in reed (threading) should be according to the weave pattern so that the total width of the warp in the warp beam should tally to the width of warp in the actual weaving reed. d) Selection of appropriate counting device e) Leasing -Use of leasing reed for cross formation. -Insertion of the two lease cord in to the section should be formed after half metre distance.

Page 16: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Warping

-Tension of all the ends in each section must be

uniform and constant at the time of withdrawal

from the supply package. Use tension device.

-Spools should be properly aligned in the creel.

-Maintain the proper sequence of ends by

aligning the spool in the creel.

- Routine checking of any interruption in the path

of warp ends between creel to section guide.

Page 17: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

-Cleaning of complete warping set at regular intervals.

-Tension of all sections should be moderate. -Too soft or too tight warping should be avoided.

-Warp beam along with its flanges should be carefully

handled. -The yarn should not be subjected to sharp abrasive action to avoid the size removal.

-Spreading of the yarn throughout the whole width of warping must be as uniform as possible.

-Predetermined length of warping should be strictly observed for every section, beam, ball or journey of mill warping, as the case may be.

Page 18: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Beaming

-The width of the warp ends in the warp beam

should be equal to the width of the reed. The

flanges should be fitted at right angles to the

beam surface and it should be fitted at the center

in equal distance from both side end of the beam.

-Use of warp beam apron is essential.

Page 19: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Drafting

If a new type of fabric is to be woven, calculate the total number of heald shafts required.

The total number of heald eyes required in each heald frame should be calculated according to design patern.

All the frames should be parallel to each other.

Filled warp beam should be fitted just over the heald shafts.

Proper selection of heald hook required as per the need of the heald gauge. A heald hook is shown below.

Page 20: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Denting

-Appropriate reed count should be selected according

to the yarn count and the total number of ends per

centimeter.

-The denting order should be according to the design

pattern.

-The surplus portion of the reed should be equally

divided in both the sides.

-Use of reed hook as shown below is required instead

of heald hook.

Page 21: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Gait-Up the Loom

-Warp beam should be accurately fitted in to the

brackets.

-All the heald shafts should be joined with the

shedding device (rollers/pulleys/jacks etc) so that their

tops are in a straight line horizontally.

-Reed should be properly fitted to the grooves (sley

groove and reed cap groove)

-The bottom and the top of the reed should completely

sink in to the grooves in horizontal position.

-The reed grooves and reed cap grooves should not be

too wide or too narrow. Otherwise it will bend to either

side.

-Discard the use of too old, damaged or rusted reed.

Page 22: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Tie-Up the Loom

-Each section of the warp should be parallel and with

equal tension.

-Each section should tie-up just parallel to the reed to

the cloth beam.

-In lieu of the section-tying rod, apron should be used.

-According to the design pattern, required number of

paddles should be accurately fitted at the middle of the

loom width.

-Required number of lamb rods should be accurately

fitted below parallel to the heald frames.

-All connections (with the paddles, lamb rod and

shedding device) should be accurately tied up.

-Everywhere, only slipknots should be used.

Page 23: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Weaving

Steps involved

Shedding;

Picking;

Beating-up;

Let-off motion; and

Take-up motion.

Page 24: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Shedding

Appropriate shedding device should be selected.

-Connecting cords for the shed formation should be even and

strong.

-The cords should not be directly linked with the heald shafts. In

lieu of this the use of loop cord is suggested through which the

connecting cord should pass and should be tied by slip knot to

either side of the heald shaft.

-Connecting cord from the central bottom of the heald shaft to

the paddle should also be tied by slip knot to the loop cord.

-Before weaving it is important to check the formation of

uniform shed.

Instead of using two heald shafts use four heald shafts.

Page 25: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

The defective shed formation may be due to:

Incorrect selection of heald wires such as length and gauge;

Imbalance connection\on of connecting cords;

Wrong drafting of the warp threads;

Damaged healds;

Broken ends of warp;

Use of undesirable high count of reed;

Uneven tension of the warp threads;

Improper fitting of back rest;

Improper fitting of the reed in to the grooves of the sley;

Imbalance level of the shuttle rest board;

Undesirable distance of lease rods;

Uneven pressure through the paddle; and

Improper selection of the shuttle

Page 26: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

PICKING •Picking should be uniform.

•Too early and too late picking should be avoided.

•All connections of the picking cord should be well balanced

•The picking cord should be even and strong

•The picking handle should be comfortable.

•Direct connection of picking cord to the picker should be

avoided. In lieu of this the use of loop cord with picker is

suggested.

•For proper picking the loom width should be according to the

width of the fabric to be woven.

•The length of the reed should be equal to the distance between

sley arms and the reed should be fitted parallel to the sley arms.

•For even picking proper selection of shuttle is necessary.

•The weft thread pirn should not be too tight or too loose.

Page 27: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

• The pirn dimensions (length and circumference) should be

such that the pirn is properly fitted in to the shuttle.

• Shuttle board (Shuttle race) should be smooth and even.

• Shuttle holder should be properly fitted to the picker. It

should not too narrow, too high or too thin.

• The use of proper shuttle eyelets is necessary for getting

desired pick supply.

• The use of fur in the inner wall of shuttle is necessary for

every fine and smooth weft thread.

• The knots in weft thread should be as minimum as possible.

Page 28: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Beating-up

•Uniform beating force should be applied.

•The beating should be in right angle to the fabric. In

this regard it is necessary that the distance of both side-

hanging noses of the sley should be in equal distance

from the cloth guide roller.

•Trembling force should be avoided.

•The beater should be held centrally during beating.

•Far shed beating should be avoided.

•Open shed beating should be avoided. In lieu of this

cross pick beating is suggested.

•The weaver should hold the sley cap from the center

while giving beating force to the fabric.

Page 29: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Let-off Motion

•Too much or too little release of the warp threads

should be avoided.

•The release of warp threads should be uniform.

•The tension on warp threads should be uniform.

•The let off motion device should be in both sides of the

warp beam.

•The arrangement should be such that the let off motion

operates automatically.

•The let off and take up motions should match with

each other.

•Leasing rods should function smoothly.

Page 30: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Take-up motion

•Winding of the woven fabric should not be too tight or

too loose.

•After weaving the winding of the fabric should be

carried out at regular intervals.

•Take up motion device should be easily approachable

to the weaver.

•If too tight fabric is to be woven, the use of tooth

wheels for both take up motions and let off mechanisms

necessary. Otherwise, for normal weaving the use of

weight system is most appropriate.

Page 31: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Use and Function of Temple

To maintain a constant width of the fabric parallel

to the warp threads.

Page 32: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Checking the Loom for Errors

The mistakes are:

-A missed heald eye

-A missed warp yarn.

-Crossed drafted and dented threads

-Too many yarns either in a heald eye or

in a dent reed.

-Missing dents of the reed.

Page 33: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Selection of Shuttle

Select shuttles taking in to account the weave pattern,

count of warp and weft, loom make and reed width.

Avoid the use too old shuttle.

Avoid the use of shuttle made of fibrous wood.

Avoid the use of blurred and bended nose shuttles.

The tongue of the shuttle should tightly grip the pirn.

Shuttle eye should not project outside. It should be

within the grip of the wood.

The center of gravity of the shuttle should be towards

the shuttle eye. It can be checked by holding the shuttle

nose across the grip of the two forefingers. So that it

tilts towards the shuttle eye let.

Page 34: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread

Maintenance and care of each part of

machine etc.

Page 35: Process Control in Weavinglibvolume8.xyz/textile/btech/semester6/textilemechanicsandcalculati… · Sectional drum warping Preparatory processes a) Creeling -The end of the thread