30
Probability Forecasts and Verification

Probability Forecasts and Verification

Embed Size (px)

DESCRIPTION

Probability Forecasts and Verification. Uncertainty. Forecasts have uncertainty that should be taken into account: Observational Uncertainty (initial conditions) - PowerPoint PPT Presentation

Citation preview

Page 1: Probability Forecasts and Verification

Probability Forecasts and Verification

Page 2: Probability Forecasts and Verification

Uncertainty

• Forecasts have uncertainty that should be taken into account:– Observational Uncertainty (initial conditions)

• Instrument errors, bias in frequency of measurements, representativeness, reporting errors, random errors, precision errors, conversion errors …

– Model Uncertainty• Insufficient spatial resolution, truncation errors,

parameterization errors, coding errors, initialization errors …

Page 3: Probability Forecasts and Verification

Deterministic and Probabilistic Forecasts

• Deterministic Forecast: Specific Outcome is Predicted

• Probabilistic Forecast: Range of Possible Outcomes Accompanied by Confidence Estimate

Page 4: Probability Forecasts and Verification

Ex: Tercile Probabilities

Page 5: Probability Forecasts and Verification

Probability Forecast

Page 6: Probability Forecasts and Verification
Page 7: Probability Forecasts and Verification
Page 8: Probability Forecasts and Verification
Page 9: Probability Forecasts and Verification
Page 10: Probability Forecasts and Verification

Probabilistic Verification

• Requires Several Forecast Cases – Cannot Verify a Single Probabilistic Forecast

• Compare Forecast Distribution to a Distribution of Observations

• Rank Probability Score (RPS)– Rank Probability Skill Score (RPSS)

• Relative Operating Characteristics (ROC)• Reliability (Not Really Verification)

Page 11: Probability Forecasts and Verification

Rank Probability Score

Page 12: Probability Forecasts and Verification
Page 13: Probability Forecasts and Verification

Rank Probability Skill Score

Page 14: Probability Forecasts and Verification

July 1 startDJF prec forecastRPSS

NMME

CFSv2

Page 15: Probability Forecasts and Verification

Relative Operating Characteristics

Page 16: Probability Forecasts and Verification

Relative Operating Characteristics

Hit Rate = hits/(hits+misses)

False Alarm Rate = false alarms/(hits+false alarms)

Page 17: Probability Forecasts and Verification

Relative Operating Characteristics

For Each Threshold Build aContingency Table SummingOver All Forecasts

Page 18: Probability Forecasts and Verification

Relative Operating Characteristics

Page 19: Probability Forecasts and Verification
Page 20: Probability Forecasts and Verification

Reliability

• Prediction System is Reliable if Predicted Probabilities Agree with Observed Frequencies– Ex: Climatological Probability has Perfect

Reliability (33%, 33%, 33%)

• Reliability Diagram Measure whether the Prediction System is Reliable, Overconfident or Underconfident

• Reliability Diagram also Shows Resolution and Sharpness

Page 21: Probability Forecasts and Verification

Reliability Diagram

Page 22: Probability Forecasts and Verification

Reliability Diagram

Page 23: Probability Forecasts and Verification
Page 24: Probability Forecasts and Verification
Page 25: Probability Forecasts and Verification
Page 26: Probability Forecasts and Verification
Page 27: Probability Forecasts and Verification
Page 28: Probability Forecasts and Verification

T2m October Starts JFM Verification

Page 29: Probability Forecasts and Verification

T2m October Starts JFM Verification

Page 30: Probability Forecasts and Verification

Probabilistic Verification

• Requires Several Forecast Cases – Cannot Verify a Single Probabilistic Forecast

• Compare Forecast Distribution to a Distribution of Observations

• Rank Probability Score (RPS)– Rank Probability Skill Score (RPSS)

• Relative Operating Characteristics (ROC)• Reliability (Not Really Verification)