Primary Settlement Tanks
Why buy when you can modify?
Presented by Dan Course
IChemE Technical Seminar – 17th October 2018
Dan Course
AMIChemE
MEng Environmental Engineering - Swansea
MMB Process Engineer
5 years Industrial and Municipal Wastewater Treatment
Project background
Dortmund Type Primary Settlement Tanks
Existing Works Performance
Proposed Solutions
Chosen Solution
Results
Conclusions
Contents
Works Description
• Built 1970s
• Conventional Trickling Filter Works
• Not permanently manned
• Average Flow = 320 m3/day
• Quality Scheme
• BOD Consent = 22 mg/l (no change)
• TSS Consent = 39 mg/l (no change)
• Ammonia Consent = 7 mg/l (new)
Collection
Chamber
Primary
Settlement
Tanks
Trickling Filters
Humus Tanks
Reed Beds
DischargeH
um
us D
eslu
dg
e Sludge
Tank
Primary
Sludge
Project Background
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
Concentr
ation (
mg/l)
Final Effluent Quality
BOD
TSS
AmmN
BOD Consent
TSS Consent
AmmN Consent
Project Background
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
Concentr
ation (
mg/l)
Final Effluent Quality (Spot Samples)
BOD
TSS
Ammonia
BOD Consent
TSS Consent
AmmN Consent
Project Background
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Tricklin
g F
ilter
Rem
oval P
erf
orm
ance
Trickling Filter Removal Performance (Composites)
BOD Removal
TSS Removal
AmmN Removal
Project Background
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Rem
oval P
erf
orm
ance (
%)
Trickling Filter Removal Performance (Spot Samples)
BOD Removal
TSS Removal
AmmN Removal
Dortmund Type Primary Settlement Tanks
• Separate Solids from Liquids
• Reduces BOD and TSS Load
• Thick sludge concentration
• Beginning of a poorly operating plant
Dortmund Type Primary Settlement Tanks
Existing Performance
Parameter Specification Actual
Hydraulic Loading Rate (all PSTs in Service) at
PFF (m3/m2.hr)1.20 1.08
Hydraulic Loading Rate (One PST Out of
Service) at PFF (m3/m2.hr)3.00 2.15
Hydraulic Retention Time at DWF (hrs) 2.00 9.63
Existing Performance
-20%
-10%
0%
10%
20%
30%
40%
50%
60%
70%
80%
Perc
enta
ge R
em
oval
Primary Settlement Tank Removal Performance (Daily Composites)
BOD Removal
TSS Removal
BOD Target Removal
TSS Target Removal
Existing Performance
-200%
-150%
-100%
-50%
0%
50%
100%
150%
Perc
enta
ge R
em
oval
Primary Settlement Tank Removal Performance (Spot Samples)
BOD Removal
TSS Removal
BOD Target Removal
TSS Removal Target
Existing Primary Settlement Performance
Bad Χ
Rising Sludge
Good ✓
Existing Primary Settlement Performance
What is rising sludge?
• Occurs under anaerobic conditions
• NO3- + 6H+ + 5e-
½N2 + 3H2O + Energy
• NO2- + 4H+ + 3e-
½N2 + 2H2O + Energy
• Nitrogen becomes trapped in sludge mass
• Sludge rises to surface
Existing Primary Settlement Performance
Why does it occur?
• Long sludge detention time
• Rat holing
• High incoming solids concentration
• Sludge removal too short
• Sludge not collecting at bottom of tank
Consequence
Conventional Solution – New PSTs
Item Cost
Divert Incoming Rising Mains £4,200
Primary Tanks £172,800
Desludge pumps + Pipework £26,400
Pipework to Trickling Filters £4,200
Modified Humus Desludge £44,900
Decommission Existing £2,400
New footpaths and road £10,900
TOTAL £265,800
Innovative Solution Reline PST
Reline PSTs Cost
Empty & Clean Tank £1,300
Reline Tank £21,000
TOTAL £22,300
92%
Cost
Saving
Innovative Solution Reline PST
Epoxy Resin HDPE Liner Silicate Coating
Advs Disadvs Advs Disadvs Advs Disadvs
Widely used
product
Confined
Space
requirement
SimpleMaybe susceptible
to cold weatherReputable
Unknown suitability
for application
ReputableNot used for
this applicationWell known
Risk of intrusion
behind sheet
Silicate material
technically soundGrit blast required
Smooth Prefab offsite
Difficult to install
one sheet over
pipework
Spray CoatingConfined space
requirement
Trained
applicatorsTough
Does not include
installation cost
Used in sewer
networks
Easy
installation
Easily secured
with batons
Does not include
cleaning
Resistant to water
after 24 hrs
£21,000 £29,500 £25,000
Material Information – Sikagard 63N
• Solvent Free Two Part Epoxy Resin Coating
• Rendering, protective lining, anti-corrosion coating
• Very good chemical resistance, easy application, solvent free
• No influence by sun radiation
• Concrete to be primed before application
• Application between 10˚C and 30˚C
• Mixture of chemicals, to be applied within 30 mins
• Laminated with special profiled roller
• Waiting time/ Overcoating = Minimum 5 hours, Maximum 3 days
• Curing time minimum = 24 hours
Installation Method
Isolate PST
Empty CleanApply
CoatingCure
Bring Back
Online
Total Time – 1 Week
Not desludged as regularly as it should
Sludge rose to the surface
Results
Rest of works working well
Operational demands on other sites
Before
After
0
10
20
30
40
50
60
70
80
90
100
09/06/18 11/06/18 13/06/18 15/06/18 17/06/18 19/06/18 21/06/18 23/06/18
TS
S %
age R
em
ovals
Comparison of TSS Removals
Unlined PST Removals
Lined PST Removals
TSS Removal Target
Results
Avg.
15%
Conclusions
✓ Improvement in TSS Removal
✓ Less sludge sticking to side of the tank
✓ Cost saving of 92%
✓ Installed within 1 week
Χ Infrequent sludge removal still caused rising sludge
Recommendations
Include Scum Removal
Increase sludge removal frequency
➢ Increase manual operation (increased labour requirements)
➢ Automatic desludge pumps (Extra £18,500, 85% cost saving vs building new)
➢ Use on site operated daily
Thank you