41
Prima Deshecha Odor Study Summary Presentation (10-15-2013) Thomas J. Rappolt Vice President and Project Director SCS Tracer Environmental

Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Prima Deshecha Odor Study Summary Presentation

(10-15-2013)

Thomas J. Rappolt Vice President and Project Director

SCS Tracer Environmental

Page 2: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Proposed Tasks

• Source Characterization • Wind Analysis (Local and Regional) • Odor Complaints • Odor Impact Modeling – VaLinda Community • Air Transport and Dispersion Analysis • Upgrade/Repair of Met Station • Mitigation Strategies and Recommendations • Community Meetings

Page 3: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Source Characterization Areas of Potential Odor

Page 4: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Source Characterization Other Point Sources of Odors

Page 5: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Odor Sampling of Sources

Page 6: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Surface Media Dispersion Tests INITIAL CONDITIONS

GAS CHROMATOGRAPH

ZER

O

AIR

PLASTIC BUCKET CONTAINING PGM

Page 7: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

GAS CHROMATOGRAPH

ZER

O

AIR

Surface Media Dispersion Tests INTRODUCTION OF SMALL AMOUNT OF TRACER

PLASTIC BUCKET CONTAINING PGM

Page 8: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

GAS CHROMATOGRAPH

ZER

O

AIR

Surface Media Dispersion Tests DISPERSION OF TRACER THROUGH MEDIA

PLASTIC BUCKET CONTAINING PGM

Page 9: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

GAS CHROMATOGRAPH

ZER

O

AIR

Surface Media Dispersion Tests DISPERSION OF TRACER THROUGH MEDIA

PLASTIC BUCKET CONTAINING PGM

Page 10: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

GAS CHROMATOGRAPH

ZER

O

AIR

Surface Media Dispersion Tests DISPERSION OF TRACER THROUGH MEDIA

PLASTIC BUCKET CONTAINING PGM

Page 11: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

GAS CHROMATOGRAPH

ZER

O

AIR

Surface Media Dispersion Tests BREAKTHROUGH INTO HEADSPACE AND FIRST DETECTION

PLASTIC BUCKET CONTAINING PGM

Page 12: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

GAS CHROMATOGRAPH

ZER

O

AIR

Surface Media Dispersion Tests FULL BREAKTHROUGH AND MAXIMUM

CONCENTRATION IN HEADSPACE

PLASTIC BUCKET CONTAINING PGM

Page 13: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

GAS CHROMATOGRAPH

ZER

O

AIR

Surface Media Dispersion Tests DECREASE IN CONCENTRATION AFTER PEAK

PLASTIC BUCKET CONTAINING PGM

Page 14: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

GAS CHROMATOGRAPH

ZER

O

AIR

Surface Media Dispersion Tests DECREASE IN CONCENTRATION AFTER PEAK

PLASTIC BUCKET CONTAINING PGM

Page 15: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

CONCENTRATION vs TIME PLOT OF VERTICAL DIFFUSION

THROUGH WET AND DRY PGM

0

10

20

30

40

50

60

0 50 100 150 200 250 300

Con

cent

ratio

n

Minutes

Vertical Diffusion of Tracer Trough 9" of PGM

Dry

Wet

Page 16: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

CONCENTRATION vs TIME PLOT OF VERTICAL DIFFUSION

THROUGH TWO DEPTHS OF CLAY CAP SOIL

0

5

10

15

20

25

30

35

40

45

0 10 20 30 40 50 60 70 80

Con

cent

ratio

n

Minutes

Vertical Diffusion of Tracer Through Clay Soil

3" soil column

6" soil column

Page 17: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

SUMMARY OF ESTIMATED VERTICAL DIFFUSION THROUGH THREE LANDFILL CAP MATERIALS

Material Velocity (m/sec)

Dry PGM 0.005

Wet PGM 0.015

Cap Soil 0.006

Solid Waste 0.500

Page 18: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Odor Source Strength Profile

40,085

537,941

1,123,274

16,892 64,968

247,408

7,565 15,525 8,600

SludgeDeposit Area

Working Face Wetted PGM -Covered

Working Face

Dried PGM -Covered

Working Face

Wetted Soil -Flat Area

AsphaultDeposit Area

Service Road CompostOperations(Corrected)

SewerManholeCovers

(Corrected)

Source Strength (D/T*m3/sec) Source Strength (D/T*m3/sec)

Page 19: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Odor Source Strength Profile (Omit Wet PGM)

40,085

537,941

16,882 16,892 64,968

247,408

7,565 15,525 8,600

SludgeDeposit Area

Working FaceWetted PGM -Covered

Working Face

Dried PGM -Covered

Working Face

Wetted Soil -Flat Area

AsphaultDeposit Area

Service Road CompostOperations(Corrected)

SewerManholeCovers

(Corrected)

Source Strength (D/T*m3/sec) Source Strength (D/T*m3/sec)

Page 20: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Annual Wind Rose Plots El Toro Mission Viejo

Page 21: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

1st Quarter Wind Rose Plots El Toro Mission Viejo

Page 22: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

2nd Quarter Wind Rose Plots El Toro Mission Viejo

Page 23: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

3rd Quarter Wind Rose Plots El Toro Mission Viejo

Page 24: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

4th Quarter Wind Rose Plots El Toro Mission Viejo

Page 25: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Meteorological Monitoring Summary Existing Weather Station: • Installed New WS And WD Sensors And Sensor Cables At Existing Weather Station. • Reprogrammed Data Logger To Operate With New Sensors. • Reprogrammed Data Logger To Record 5-min Averages. • Calibrated Sensors And Verified Proper Operation Of Data Logger.

Temporary Weather Station: • Installed Temporary Weather Station In “The Saddle” For The Purpose Of Comparing The Existing Locations Weather Parameters To That In The Saddle As Well As To Better Understand Transport Characteristics From The Landfill To The Community. • SCS Tracer and OCWR Determined That The Existing Weather Station Is Not Adequate For Describing Transport From The Facility To The Community.

Page 26: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Weather Station Relocation

• The Sensors/Data Loggers/Solar Power Assembly/Cables From The Current Fixed Weather Station Have Been Removed From The Existing Tower Following An “As Is” Calibration. • SCS Tracer Will Re-install And Calibrate The System Following Re-installation Of The Tower In “The Saddle” by OCWR. At That Point, The Temporary Weather Station Will Be Removed.

Page 27: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Data Comparisons: 9/4/13

0

50

100

150

200

250

300

350

0:00 2:24 4:48 7:12 9:36 12:00 14:24 16:48 19:12 21:36 0:00

Site #1: Wind Direction

Site #2: Wind Direction

0

2

4

6

8

10

12

14

0:00 2:24 4:48 7:12 9:36 12:00 14:24 16:48 19:12 21:36 0:00

Site #1: Wind Speed

Site #2: Wind Speed

Page 28: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Data Comparisons: 9/5/13

0

2

4

6

8

10

12

14

0:00 2:24 4:48 7:12 9:36 12:00 14:24 16:48 19:12 21:36 0:00

Site #1: Wind Speed

Site #2: Wind Speed

0

50

100

150

200

250

300

350

0:00 2:24 4:48 7:12 9:36 12:00 14:24 16:48 19:12 21:36 0:00

Site #1: Wind Direction

Site #2: Wind Direction

Page 29: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Estimated Trajectories Sea Breeze Regime

Page 30: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Estimated Trajectories Sea Breeze Regime

Page 31: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Terrain Influences on Turbulence

Page 32: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Tracer Gas Release Locations

Page 33: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Sampling Locations

Page 34: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Tracer Study Results

0.00E+00

1.00E-05

2.00E-05

3.00E-05

4.00E-05

5.00E-05

6.00E-05

7.00E-05

8.00E-05

9.00E-05

Site Impacts Working Face Emissions

Sept 5, 2013

Site 2

Site 3

Site 4

Site 5

Site 6

Site 7

Site 8

Site 9

(sec

/m^3

)

Page 35: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Tracer Study Results

0.00E+00

1.00E-05

2.00E-05

3.00E-05

4.00E-05

5.00E-05

6.00E-05

7.00E-05

8.00E-05

9.00E-05

Site Impacts Cell C -1 Emissions

Sept 5, 2013

Site 2

Site 3

Site 4

Site 5

Site 6

Site 7

Site 8

Site 9

Site 10

(sec

/m^3

)

Page 36: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Tracer Study Results

-2.00E-06

0.00E+00

2.00E-06

4.00E-06

6.00E-06

8.00E-06

1.00E-05

1.20E-05

1.40E-05

(sec

/m^3

)

Chi/Q (sec/m^3) Averages of All Sites Except #2

Sept 4, 2013

Cell C - 3

Working Face

2 per. Mov. Avg. (Cell C - 3)

2 per. Mov. Avg. (WorkingFace)

Page 37: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Tracer Study Results

• Dispersion increases as a function of distance – as expected.

• Impacts at the Saddle are at Maximum • Once Airflow Breaches Saddle then Mixing is

Enhanced – helps lower impacts. • Odors from Gate Area do not Impact Community • Odors from the Compost Facility do not Impact the

Community. • Modeled Dispersion Rates are Slightly Lower than

the Tracer Data Indicate – Models Over-predict.

Page 38: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Odor Modeling Summary • AERMOD Model

– Developed by the U.S. EPA – Approved by the SCAQMD

• Source Information – Locations and Dimensions – Odor Emission Rates (Odor Concentration * Flow Rate) – Total of 17 Sources Modeled

• 5 Years of Meteorological Data (SCAQMD Mission Viejo Station 2005-2009)

• Shuttle Radar Topography Mission (SRTM) Terrain Data • Modeling Predicted the Worst Case Odor Impacts at the Key

Residential Area North of the Facility

Page 39: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Modeled Scenarios

• Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM

on the working area 3. Same as #2 except reduced the area of the working face

by 50% 4. Same as #2 except relocated the working area &

working face to the east 5. Same as #3 except reduced the dry PGM odor

concentration by about 50% 6. Same as #2 except completely eliminated the working

face odors

Page 40: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Modeled Results Summary Maximum Potential Impacts – 5 years

Scenario Scenario Notch Residential

Ave Max.

No. Description (%) (%)

1 All sources (Wet PGM) – Present Status 100 100

2 All sources (Dry PGM) 74 52

3 All sources (50% Working Face Area, Dry PGM) 69 28

4 All sources (Relocated Full Working Face/Areas, Dry PGM) 81 45

5 All sources (50% Working Face Area, 50 D/T Dry PGM) 69 28

6 All sources (Dry PGM, No Working Face) 69 5

Note: Highest Measured Odor Concentration at Notch is 10 D/T

Page 41: Prima Deshecha Odor Study...•Scenarios Examined: 1. Entire facility with wet PGM on the working area 2. Same as #1 except switched from wet PGM to dry PGM on the working area 3

Recommendations • Dry vs Wet PGM • Lay-down Area for New PGM in Eastern areas of the Landfill. • Reduce the Exposed Size of the Working Face – Garbage

Placement Area. • Increase Thickness of the Cover Material – Dried PGM or

multiple layers. • Some Timing Considerations to Waste Handling, but may not

provide net benefits. • Use Some Type of Air Stripping Systems to Slow Venting of

Working Face. • Reduce the Amount of Bio-Solid Sludges Deposited into the

landfill (minimal effect).