31
APPLICATION - DRIVEN CLIENT SOLUTIONS For Domestic Hot Water and Space Heating Presented by: Ervin Cash, CEO

Presented by: Ervin Cash, CEO APPLICATION - DRIVEN CLIENT SOLUTIONS · 2013-09-25 · APPLICATION - DRIVEN CLIENT SOLUTIONS . For Domestic Hot Water and Space Heating . ... AERCO

  • Upload
    vankiet

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

APPLICATION - DRIVEN CLIENT SOLUTIONS For Domestic Hot Water and Space Heating

Presented by: Ervin Cash, CEO

Client Solution Example 3: University of North Texas

About AERCO

Client Solution Example 1: San Diego Marriott Marquis

Client Solution Example 2: Las Vegas Hotel / Casino

Discussion Overview

• Goal: deliver on-demand, + 2 F temp controlled water heating without storage

Sixty years of innovation it all started with a vision…

• Angelery’s Solution: self-descaling, helical-coil heat exchanger

• Design remains unique to AERCO, and is still sold today!

Founder Henry Angelery

…and today innovation is a core competency

Air-Fuel Delivery

439 SS HX

Reverse Fiber Mesh Ultra Low Nox

O2 Monitoring/Trim

20 to 1 Turndown

Highest Btu to Footprint

Ratio Firetube SS/ASME

Remote Monitoring

Internet

Seasonal Efficiencies

Proud to say:

Commitment to Investment that enables process capability and performance

Moved into new, green-field 165,000 sqft mfg facility May 2010

Prototype and Life Cycle Testing

With 30,000,000 btu’s of R&D Testing

Quality is a core part of our

Manufacturing Discipline and Process Capability

Robotic Welder Benchmark Series Heat Exchanger

Automated Braze Cell Innovation Series Heat Exchanger

Flow Manufacturing

CMM (Coordinate Measurement Machine) Dimensional Tolerances

Market Needs Drive Our Product and Application Solutions

Key Markets

Education: K-12 Education:

University/ Colleges

Government Healthcare

Lodging/ Entertainment Multi-Family Office/ Industrial Buildings

Boiler and Water Heater Product Platforms

Boilers Water Heaters Btu/h (input): 6,000,000 3,000,000 2,000,000 1,000,000 500,000 399,000 220,000

Stainless Steel Fire Tube

(Benchmark Series)

Models:

3000 2500 2000 1500 1000 750

6000 Aluminum Cast

Models:

3060 2677 2295 1912 1530 1123 962 802 641 481 321

Outdoor Enclosure Redundancy

Size/Footprint O2 Trim/On AER

Stainless Steel Fire Tube

(Innovation Series)

1350 1060

800/600

Space for BTU Tankless

Stainless Steel Water Tube

Models:

1000 750 500 399 220

Break-Fix

Stainless Steel Water Tube

Models:

1000 750 500 399 220

Break-Fix

Largest installed multi-boiler system: 99,000,000 Btu/h

Solutions Designed to Support Challenging Applications

LAN

Campus Data Center or IDF

Building A

Router Firewall Switch

Switch

AERCO Data Center

Internet

Remote Monitoring - OnAER

• Products • Application Knowledge • Engineered Packages • Services (Pre- and Post- Sale)

60 Offices North America

Singapore Malaysia

Thailand Philippines

Taiwan

China (Singapore)

S. Korea (JV)

Saudi Arabia

Egypt

Jordan

Bulgaria

Poland

UK

Uruguay Argentina

Chile

Bolivia Peru

El Salvador

Mexico

Ecuador

60 North America Offices, 22 Outside North America

Worldwide Sales Offices

Application Expertise Technology Services

Hydronic Heating System Optimization Parts, Services

Domestic Water Heating Remote Monitoring

Equal 2 New Refurbishment

Program: Retrofit and Upgrades

Controls/ Communication

Trending and Diagnostics Extended Warranty

System Accessories Factory-Trained Service Technicians

Energy, water and operational cost reductions

Operational sustainability

Occupant health and welfare

System reliability and equipment uptime

Peace of Mind

The AERCO Advantage

CLIENT SOLUTION EXAMPLES Case Studies

Client Solution Example 1

Overview Client : San Diego Marriott Marquis

Location: San Diego, CA

Vertical : Full-service resort-style property that includes meeting space, multiple restaurants, marina

Year(s) built: 1984 - North Tower

1987 - South Tower

Size: 1.4 million sq. ft

Rooms: 1,362

Client Solution Example 1

Challenge • Two leaking tanks

on the 26th floor mechanical room of the North Tower

• 30 years old with a rated efficiency less than 80%

• Hot Water for 681 hotel rooms, 25 floors

Client Solution Example 1

AERCO Solution - (6) Innovation Water Heaters

- Water Management System

- OnAER Remote Monitoring

AERCO Advantage Reduced Operating Costs - 96% Efficient

Space Savings, Easy Retrofit - On Demand/ Tankless- Small Footprint

Increased Efficiency - Water Heater Mgmt

Peace of Mind - OnAER Remote Monitoring

Client Solution Example 1

AERCO Advantage Easy upgrade:

- Small and light enough to be rigged through a standard doorway

No cranes or costly rigging required - Innovations rode the elevator up to 26th floor mechanical room

NO downtime: - Small enough to be installed before removal of the 1500 gal tank

Reduced installation costs: - Sidewall vented with readily available PVC

Full-time peak efficiency - Around-the-clock onboard WH Management system

Maximum longevity: - All stainless-steel heat exchanger design ensures long life

Tank

Innovation

Installation before Tank Removal

Client Solution Example 1

Result In July, the San Diego

Marriott was host hotel of the 2013 Comic-Con Convention

– Hotel was at peak occupancy with 2-4 per room

– OnAER logged that no more than 3 units were required to handle the sustained peak load during the entire 4 days of the convention!

OnAER Remote Monitoring

Client Solution Example 2

Overview Client : MGM Resorts International - Mirage - MGM Grand Location: Las Vegas, NV Vertical Experience : 15 + Hotel/ Casino Resorts

Client Solution Example 2

Challenge Las Vegas Hotel/ Casino properties need to upgrade inefficient HVAC systems as part of their

“Green Advantage Sustainability Program”

Incorporate environmentally responsible practices that effectively lowers their carbon footprint throughout all of operations

Client Solution Example 2

Client Property: Mirage Products: (10) Benchmark 3.0, (3) SmartPlate Double

Application- Hydronic heating loop which includes pool heating, domestic water heating (through SmartPlates) and space heating.

AERCO Advantage Reduced Operating Costs - 95% Efficient

Space Savings, Easy Retrofit - Small Footprint

Serviceability

Increased Efficiency - AERCO Control System

Space Saving Design- TEN BMK3.0 boilers fit in

the same footprint of TWO mid efficiency boilers

No downtime - during the full installation

SmartPlate

Benchmark

Client Solution Example 2

Result • AERCO system solution met their needs of:

Efficiency

Space

Serviceability

• The systems proved highly reliable with the added benefit of low-cost maintenance.

• Operating cost saving / year: $500,000+

Before

After

Client Solution Example 2

Client Property: MGM Grand Products: Benchmark 6000, OnAER Remote Monitoring

Application: Domestic Showers/ Pool Heating

AERCO Advantage Reduced Operating Costs - 94.5% efficient

Reduced "greenhouse" gasses - low emissions

Space savings / Compact Footprint - 66% the size of the original installation

Vent material savings – Replaced existing 36” venting with 12” SS venting; 100% savings

Pro-active maintenance - Remote Monitoring with Oxygen (O2 ) Monitoring

Client Solution Example 2

Result The property will be installing

the other (3) BMK6000’s by the end of 2013

The full system (4) BMK6000’s will fit into the same footprint as one the mid efficiency boiler

Installation will take place with no downtime

MGM is also working on plans to replace the rest of the mechanical system

Client Solution Example 3

Overview Client :

University of North Texas (UNT); Denton, Texas

Vertical :

UNT: 3rd largest university in Texas USA: 26th largest public university

Students: 36,000

Year founded: 1890

Client Solution Example 3

Challenge • Central steam plant supplied heating for

most of the classroom/ admin buildings

• As the campus grew, each new building had a separate steam boiler or 80% efficient hydronic heating boiler

• Each dorm building used steam boilers for space heating and a mix of either indirect steam storage tank heaters or direct-fired 82% storage heaters

• 2002- Facilities Department began to upgrade with high-efficiency boilers as funds became available

• 2011- The Housing Department began a

similar process to upgrade its aging boilers and domestic water heaters that were beginning to fail

Client Solution Example 3

AERCO Advantage Benchmark Boiler, Innovation Water Heaters:

Small footprint for easy installation

All-SS HEX design for longevity

Identical air/fuel delivery, combustion and control systems for consistent, high performance

The Innovation On-Demand/ Tankless designs- Space Savings, Easy Retrofit

Controls: Increased Efficiency Water Heater Management AERCO Control System

Client Solution Example 3

Result By 2014, UNT will have in place:

(16) INNVOVATIONs

(50) BENCHMARKs

Natural gas savings:

The upgraded central steam plant alone consumed 57% less gas (6,465 mcf vs. 11,389 mcf) than it did with the previous heating system

In addition to our technology, applications know-how, and solution-orientation, we add:

• A responsive staff with an entrepreneurial “can-do” spirit

• A company commitment

to stand with you until you’re satisfied

…and these are just three examples.

Thank you!