We, UET & HKR, are the leading equipment manufacturers in plant & construction industries with more than 45 years of experience.
To achieve higher customer satisfaction, UET & HKR started a single integrated organization from 2011.
Unison eTech Co., Ltd. (UET) & HKR Co., Ltd.
CUSTOMER SATISFACTION
UET HKR
Page 2
Page 3Page 3
Page 4Page 4
History
HKR Co., Ltd.
2018 Open HKR R&D Center
2016.12 Awarded for Top 10-Million USD Export Achievement
2016.01 Selected as Regular Member of Korea Dongsuh Power Generation SMB Council
2014.06 Registered as one of the 5 qualified power generation equipment & material suppliers in Korea
2013.05 Joined in EJMA member
2013.02 Acquired ASME “U2” stamp
2011.12 “2011 Excellence Award” from GE AERO ENERGY
2010.07 Acquired ISO18001 Certificate
2009.08 Started operation of HKR Vietnam Co., Ltd.
2007.06 Acquired ISO14001 Certificate
2006.05 “2005 year” Best Supplier award from TOSHIBA CORP.
2002.07 Acquired ASME “U” & “PP” stamp
2000.08 Acquired ISO 9001 Certificate
1974.07 Started to produce E/J for the 1st time in Korea
1972.10 HKR Co., Ltd. Establishment
UNISON eTech Co., Ltd.2018 Opening Global offices in India & Spain
2017
Signed an Global Partnership Agreement with Samsung C&T CorporationQualified to supply parts for power plants to Russian nuclear power plants ROSATOM
2016.07 Obtained OHSAS 18001:2007 Certificate
2015.02 Selected as an Outstanding Subcontractor for Doosan Heavy Industries & Construction
2012.05 Acquired certification for new environmental technology in biogas plant industry (first in Korea)
2011.09 Acquired 100% of shares of HKR Co., Ltd.,
2011.05 HCP acquired UNISON Hi-Tech and renamed to UNISONeTech Co., Ltd.
2009.10 UNISON Hi-Tech was spun off from UNISON as a wholly owned subsidiary
2006.11 Acquired ISO14001 Certificate
1997.09 Acquired KEPIC Certificate
1997.03 Acquired ASME “NS” & “NPT” Certificate
1994.12 Acquired ISO9001 Certificate
1987.12 Technical License with Grinnel (ANVIL, USA) for Pipe Hanger & Support
1984.09 UNISON Co., Ltd. Establishment
Page 5Page 5
Organization & Employee Status
UNISON eTech(CEO Mr. B.K Koo)
Vietnam Factory & Branch Office
HKR(CEO Mr. B.K Koo)
▣ Organization
▣ Employee Status
Description UET HKR
Administration 26 7
Sales 25 9
Design 32 9
Production 17 9
Procurement 4 3
QA 9 9
R&D 5 2
Worker 104 44
Total 222 92
Ove
rsea
s Bus
ines
s D
ivis
ion
Plan
tBu
sine
ss D
ivis
ion
Cons
truc
tion
Busi
ness
Div
isio
nR&D Center
Adm
inis
trat
ion
Div
isio
n
Purc
hasi
ngM
anag
emen
t D
ivis
ion
Prod
uctio
n D
ivis
ion
Qua
lity
Man
agem
ent
Div
isio
nBusiness Divisions Support Divisions
100% Shareholder
Spain, India Branch Office
Page 6Page 6
Location
Head Office & Factory (CheonAn)- Spring Hanger & Pipe Support- Damper- Sound Proof Wall- LRB, Pot Bearing- Expansion Joint- Large Bore Piping
- Gross Area: 98,511㎡ / Indoor: 24,512㎡
Vietnam Factory (Binh Duong)- Non-Metallic Expansion Joint- Metallic Expansion Joint- Large Bore Piping- Gross Area: 7,798㎡ / Indoor: 3,900㎡
Overseas Sales Office (Seoul)- Sales & Engineering Team
1 hour 40 min.
Spain Branch India Branch
Page 7Page 7
Business Status in 2018
▣ HKR Co., Ltd.2018 Sales Total : 21.1 Million USD
61%
5%4%
30%
<Industrial>
ThermalPetroNuclearLNG
72%
28%
<Market>
DomesticOverseas
57%43%
<Market>
DomesticOverseas
2018 Sales Total : 58.4 Million USD (Plant : 33.4 Million USD – 57% / Construction : 24.9 Million USD – 42%)
▣ UNISON eTech Co., Ltd.
18%
34%
3%2%43%
<Industrial>ThermalPetroNuclearLNGConstruction
Page 8Page 8
Exp.Date : Jul.24, 2020 Exp.Date : Jul.24, 2020 Exp.Date : Jul.24, 2020
Exp.Date : Mar.02, 2021
Exp.Date : Jul.24, 2020
Exp.Date : Apr.30, 2019 Exp.Date : Jul.26, 2019 Exp.Date : Feb.21, 2019 Exp.Date : Aug.04, 2019
Exp.Date : Jan.23, 2019
Exp.Date : Jul.14, 2021 Exp.Date : Jul.14, 2021 Exp.Date : Aug.19, 2019
Exp.Date : Sep.28, 2019
ASME “NS”
KEPIC MN-152
ISO 9001 ISO 14001
Certificates
ISO 9001 ISO 14001 OHSAS 18001 KEPIC MN-148
ASME “U” ASME “PP” ASME “S” ASME “U2”
Exp.Date :May.07, 2021 Exp.Date : Sep.28, 2020 Exp.Date : N/A Exp.Date : Sep.28, 2019
EJMA MEMBERSHIP(Expansion Joint Manufacturers
Association)
PED(Pressure Equipment Device)
ABS BV GTT LR
Exp.Date : Jun.30, 2022
DNV
Exp.Date : N/A
CE Certificate
▣ UET – SPRING HANGER & PIPE SUPPORT, BRIDGE BEARING
▣ HKR – EXPANSION JOINT
Exp.Date : Jul.14, 2019
OHSAS 18001
Exp.Date : Aug.19, 2019
ASME “NPT”
Page 9Page 9
EQUIPMENT NAME CAPACITY Q’TY
Mixing Mill22” x 60”18” x 48”
2
CNC Machining Center AJV-3580 10
CNC plane Miller RB-2N 1
Multi Axis Drill Machine 7 Axis 2
Milling Machine # 7 3
Tapping Machine HTM-18M 1
CNC Laser Cutting 5’ x 10’ 2
Overhead Crane 10, 20 Ton 10
EQUIPMENT NAME CAPACITY Q’TY
PMI Tester Master Pro 1
Fatigue Tester 2MN 1
Universal Tester 10 kN 1
Compression Tester 500 kN 1
Infrared Temp’ Indicator 0 ~ 400 ℃ 1
Surface Temp’ Indicator 720 ℃ 1
Ultrasonic Thickness Test 1 ~ 200 mm 1
Electrical Scale 500 Kg 1
▣ Inspection & Test▣ Manufacturing
Major Equipment - UET
Page 10Page 10
Major Equipment - HKR
EQUIPMENT NAME CAPACITY Q’TY
Hydro Press M/C 50 ton ~ 1500 ton 8
Roll Forming M/C Max 4M Dia. 3.5Kw 1
Urethane Bend M/C 4M Dia. / 1M Dia. 2
Overhead Crane 2 Ton ~ 25 Ton 18
Ganty Crane 5 Ton / 7.5 Ton 3
Auto Tube Weld M/C Max. 3.2T x 1250L 2
Turning Roller 3 ton ~ 10 ton 7
EQUIPMENT NAME CAPACITY Q’TY
Welding Gauge 0~60mm, 0~50mm 1
Universal Testing Machine 50ton, 0.02KN 1
High Press Pump 250bar 2
Vacuum Test Pump 0~-760mmHg 2
Helium Leak Detector HELIOT 701W1 1
Surface Measuring Instrument -200~150㎛ 1
Cycle Test Machine Φ1400 X 3M 1
Fatigue Test Machine Φ1400 X 1M 1
Bore Scope Φ4.0MM X 3.5M 1
PMI Tester XL2-800 1
▣ Inspection & Test▣ Manufacturing
Page 11Page 11
Business Area
UNISON eTech Co., Ltd. HKR Co., Ltd.
• Variable Spring Hanger• Constant Spring Hanger
• Cold Support• Sway Strut
• Hydraulic Snubber• Damper
PLANT
CONSTRUCTION
• Seismic-Resistance Isolation • Vibration Isolation
• Expansion Joint• Sound proof Wall
• Metallic Expansion Joint• Flexible Joint• Non-Metallic E/J• Rubber Expansion Joint• Large Bore Piping• Piping Spool
PLANT
Page 12Page 12
- Major Products (Spring Hanger & Pipe Support / Damper)
- Production Capacity
Application : 1. Power Plant2. Petrochemical3. LNG / LPG4. Shipbuilding
Page 13
Prevents thermal expansion of the pipe from the general operating load & pipe movement
Maximum Available Load : 40 tons
Support Type (Type F)Hanger Type (Type B, C)
1) Variable Spring Hanger
Major Products
Page 14
Prevents thermal expansion of the pipe from the severe operating load & pipe movement (For critical pipe line)
Maximum Available Load : 40 tons
Hanger Type (Type G, B, C) Support Type (Type F)
2) Constant Spring Hanger
Major Products
Page 15
A sway strut is a device used to restrain movement of piping in one direction while providing for movement due to thermal expansion or contraction in another direction.
3) Sway Strut
Major Products
Page 16
Applicable area : LPG, LNG Terminal Used in the low temperature of the pipe line (up to -196 ℃) Main Material : Polyurethane / Compressed & shaped wood
4) Cold Support
Major Products
<SAMCHEOK LNG TERMINAL, KOREA>
Page 17
Threaded Rod
Hydraulic Snubber Pipe Clamp Turnbuckle
U-BoltSway Strut
5) Accessories
Major Products
Page 18
Major Products
6) Damper
Louver Damper (Low & Zero Leakage, Control)
Tandem Damper(Zero Leakage)
Guillotine Damper (Slide) (Low & Zero Leakage)
Stack Damper(Rain Protection)
Wafer Damper(Butterfly) Poppet Damper Diverter Damper
(HRSG Bypass System)
Function : block Gas / switch Gas flow. Type : Selected and supplied according to customer's requirement Material : Carbon / Alloy (6~14% moly) / Stainless Size : Maximum 20m Leakage : Low & Zero Leakage
Page 19
Service
Engineering
Field Inspection Service
Repair & Installation
Provide differentiated service in CAE analysis of machinery, piping and design manufacturing for many years
Offer a wide range of service relate to plant facilities as
routine maintenance, technical support through technical
standard and regular plan
Support reverse engineering, product fabrication and field repair
Page 20
Production Capacity
Variable Spring Hanger 750 EA / Month
Constant Spring Hanger 500 EA / Month
Cold Support500 EA / Month
Sway Strut 1,200 EA / Month
Pipe Clamp 200 Ton / Month
Threaded Rod150 Ton / Month
Steel Structure300 Ton / Month
Page 21Page 21
- Major Products (Expansion Joint / Piping Spool)- Production Capacity
Application : 1. Power Generation2. Oil & Gas Industry3. Steel Mills & Cement Works4. Marine (On-shore/Off-shore)5. Environment Plant
Page 22Page 22
FCC REFINERY TYPE
JACKET TYPE GIMBAL TYPE
T-VOLUME BALANCE TYPE T-PRESSURE BALANCE TYPE
RFCC UNIVERSAL TYPE RECTANGULAR TYPE
Major Products
BOILER DUCT (ALSTOM MANJUNG TPP PROJECT)
Page 23Page 23
DOG BONE TYPE (CONDENSER) CASING SEAL TIGHTENESS TYPE (HRSG) CASING MULTI TYPE (HRSG)
GE/ 7FA DIFFUSER GE/ 9H DIFFUSER GE/ 9H DIFFUSER
TOYO / CHILE FCC PJT THERMAL POWER BOILER DUCT SITE REPLACE SERVICE
Major Products
Page 24Page 24
BORE SCOPE 3D INSPECTION GAS TURBINE FUEL LINE NUCLEAR PIPING
TAIWAN WATER LINE OSAKA GAS STATION KOREA WATER LINE SITE INSTALLATION
Major Products
Page 25Page 25
HYDRAULIC TEST PRESSURE CYCLE TEST FIELD CRYOGENIC TEST
ASSEMBLY FIELD(SHIP) INSTALLATION
Major Products
Page 26Page 26
Major Products
2-NOZ’L TYPE 3-NOZ’L TYPE
BFPT SHOP ASS’YNUCLEAR FWPT
4-NOZ’L TYPE
BFPT SITE INSTALLATION
Page 27Page 27
Major Products
INSTALLATION AT SITE
HORIZONTAL TYPE STEAM VENT SILENCERS
DELTAK LLC
TOSHIBA COCO / THAILAND
DELTAK LLC
DARWIN LNG / AUSTRALIADELTAK LLC
CAOJING HRSG / CHINA
DELTAK LLC
PT ARUN / MALAYSIA
Page 28Page 28
Production Capacity
Metallic Expansion Joint
Metallic Expansion Joint
Bellows for LNG Carrier
1
Flexible Joint3
Non-Metallic Expansion Joint
Non-Metallic Expansion Joint
Rubber Expansion Joint
2
Piping Spool & Duct
Large Bore Piping & Duct
Piping Spool (3D)
4
Temperature Range
Pressure Range
-196℃ ~ 1,500℃
Full Vacuum ~ 250 Bar
15 D ~ 7,000 D
q15 D ~ Owner
Required
25 D ~ 1,750 D
25 D ~ 4,000 D
25 D ~ 3,000 D
1,000 D ~ 6,000 D
q10 D ~ Owner
Required
850 EA
650 EA
150 EA
450 EA
450 EA
200 Ton
100 Ton
Capability Capacity/Month
Page 29Page 29
- Overview- Major Products
(Bearing, Expansion Joint, Sound poof Wall)
Application : 1. Bridge
2. Building (Vibration Isolation)
3. Plant
Page 30
- Best for seismic isolation design service and know-how
- Secure best performance with strict quality control system
- Maximize field satisfaction with various construction know-how for field condition
- Optimal delivery service according to project management
Overview
Application Example
Bearing Expansion Joint Sound Proof Wall
Special Features
Page 31
Major Products I
Rubber Bearing Pot Bearing SEB (Spherical Elastomeric Bearing)
Disc Bearing
Energy Dissipation System Lead Rubber Damper
Safe Damper Smart Wall
Seismic Resistant Bearing
Base-Isolation Bearing Vibration Control
Lead Rubber Bearing
(For Bridge)
Page 32
Major Products II
Waterproof Finger JointSegment Mold
Mold Expansion Joint
Rail Type Expansion Joint
Sound Proof Wall
Sound Reflection Type Sound Absorption Type Sound Proof Tunnel
Finger Type Expansion Joint
Page 33
Production Capacity
ITEMCAPACITY
UNITMonth(Normal) Year(Normal) Month(Max.) Year(Max.)
Rubber Bearing 550 6,600 1,100 13,200 SET
Lead Rubber Bearing 130 1,560 260 3,120 SET
POT Bearing 300 3,600 800 9,600 SET
FINGER JOINT 200 2,400 480 5,760 M
Page 34Page 34
- Major Customers- Major Experience List (UET-Plant)- Major Experience List (HKR)- Major Experience List (UET-Construction)
Page 35Page 35
Major Customers
Domestic
Overseas
End-User
Page 36Page 36
Major Experience List (UET Plant – Power Plant)
PROJECT CUSTOMER END USER PLANT AREA ITEM* SITE YEAR
UAE BARAKAH NUCLEAR POWER PLANT #1~#4 KOREA ELECTRIC POWER CORP. KOREA ELECTRIC POWER
CORPNUCLEAR POWER
PLANT VS,CS,RG,ETC UAE 2013~8
MALAYSIA FAST TRACK 3A DAELIM INDUSTRIAL TNB THERMAL POWER PLANT VS,CS,SN,ST,ETC MALAYSIA 2014~7
TAEAN TPP #9~#10 DAELIM INDUSTRIAL KOREA WESTEN POWER CORP.
THERMAL POWER PLANT
VS,CS,SN,RG,ETC KOREA 2012~7
ALGERIA MEGA DEALHRSG BHI SPE CCPP VS,CS,ETC ALGERIA 2017
NORESTE ESCOBEDO AMEC FOSTER WHEELER ENERGIA
IBERDROLAGENERATION MEXICO CCPP VS, RG MEXICO 2016
HAIL PROJECT HRSG AMEC FOSTER WHEELER ENERGIA
SEC(SAUDI ELECTRICITY
COMPANY)
THERMAL POWER PLANT RG, ETC SAUDI 2015
PP10/ PP12 CCPP PROJECT ARABIAN BEMCO CONTRACTING
SEC(SAUDI ELECTRICITY
COMPANY)CCPP VS,CS,RG,ETC SAUDI 2013~4
SAMCHEOK TPP #1~#2 HYUDNDAI E&C KOREA SOUTH POWER CORP. THERMAL POWER PLANT
VS,CS,SN,RG,ETC KOREA 2014
MONG DUONG II DOOSAN HEAVY INDUSTRIES AES-TKV THERMAL POWER PLANT VS,CS,RG,ST,ETC VIETNAM 2013
RAIPUR II DOOSAN HEAVY INDUSTRIES GMR ENERGY POWER PLANT VS,CS,SN,RG,ETC INDIA 2013
QURAYYAH BLOCK 1~5 DOOSAN HEAVY INDUSTRIESSEC
(SAUDI ELECTRICITY COMPANY)
CCPP VS,CS,RG,ETC SAUDI 2013
* VS : Variable Spring Hanger / CS : Constant Spring Hanger / SN : Hydraulic Snubber / ST : Sway Strut / RG : Rigid Hanger / CD : Cold Support / HD : Hold Down Support
Page 37Page 37
Major Experience List (UET Plant - Petrochemical)
PROJECT CUSTOMER END USER PLANT AREA ITEM* SITE YEAR
LPIC EPC1 SCU Project CCJV (CB&I-CTCI JOINT VENTURE) ORPIC PETROCHEMICAL CD, BULK OMAN 2017~8
S-OIL RUC PROJECT DAELIM INDUSTRIAL S-OIL PETROCHEMICAL VS, CS, ETC KOREA 2017
RAPID PACKAGE 3 TECNICAS REUNIDAS PETRONAS OIL&GAS CS MALAYSIA 2017
KNPC CLEAN FUELS(MAB#1)
PSCJ(Petrofac, Samsung, CB&I JV) KNPC OIL&GAS CL, HD KUWAIT 2017
RGT-2 SAMSUNG C&T PETRONAS REFINERY CD, ETC KOREA 2016
STC A2 SAMSUNG ENGINEERING SAMSUNG TOTAL REFINERY VS,CS,CD,ETC KOREA 2014
JAC SK E&C JURONG AROMATICS CORP. REFINERY VS,CS,RG,ST,ETC SINGAPORE 2013
SHAYBAH PKG. #1, #2, #4 SAMSUNG ENGINEERING ARAMCO REFINERY VS,ST,HD,ETC SAUDI 2013
RUWAIS REFINERY EXTENSIONPKG. #1 SK E&C TAKREER REFINERY VS,CS,SN.ST UAE 2012
RUWAIS REFINERY EXTENSIONPKG. #3 SAMSUNG ENGINEERING TAKREER REFINERY VS,CS,SN.ST UAE 2012
OPAL DFCU & AU SAMSUNG ENGINEERING ONGC-PETRO OIL&GAS CD INDIA 2010~2
HABSHAN 5 U&O HYUNDAI E&C GASCO REFINERY VS,CS,ETC UAE 2011
* VS : Variable Spring Hanger / CS : Constant Spring Hanger / SN : Hydraulic Snubber / ST : Sway Strut / RG : Rigid Hanger / CD : Cold Support / HD : Hold Down Support
Page 38Page 38
Major Experience List (HKR – Power Plant)
PROJECT CUSTOMER END USER PLANT AREA ITEM SITE YEAR
ANYANG CHP PROJECT GE INTERNATIONAL GS POWER THERMALPOWER PLANT
CROSSUNDERPIPE KOREA 2017
MAE MOH POWER PLANT GE POWER(ALSTOM)ELECTRICITY GENERATING
AUTHORITY OF THAILAND(EGAT)
THERMALPOWER PLANT
CROSSOVER DUCT THAILAND 2016
JEDDAH SOUTH POWER PLANT (#1~4)
MITSUBISHI HITACHIPOWER SYSTEMS (MHPS)
SAUDI ELECTRICITY COMPANY (SEC)
THERMALPOWER PLANT
CROSSOVER PIPE
SAUDIARABIA 2015
SULAYMANIAH GAS POWER STATION GE INTERNATIONAL MASS GLOBAL ENERGY THERMAL
POWER PLANT CROSS SAUDIARABIA 2014
KUDGI STPP (3 x 800MW) DOOSAN POWER SYSTEMS INDIA NTPC THERMAL
POWER PLANT
NON-METALEXPANSION
JOINTINDIA 2014
IMMINGHAM POWER PLANT TOSHIBA CORPORATION VPI IMMINGHAM LLP THERMALPOWER PLANT
LARGE BORE PIPE UK 2014
MONG DUONG 1 2x560MW COAL FIRED POWER PROJECT
DOOSAN HEAVY INDUSTRIES & CONS.
AES-VCM MONG DUONG POWER COMPANY
THERMALPOWER PLANT
LARGE BORE PIPE VIETNAM 2013
TRIPOIL WEST POWER PLANT HITACHI GENERAL ELECTRICITY COMPANY OF LIBYA POWER PLANT LARGE BORE
PIPE LIBIYA 2013
XUFG1 PJT TOSHIBA TOSHIBA POWER PLANT LARGE BOREPIPE USA 2013
LIN KOU POWER PLANT PJT MHI NAGASAKI MHI NAGASAKI POWER PLANT LARGE BOREPIPE TAIWAN 2013
Page 39Page 39
Major Experience List (HKR - Petrochemical)
PROJECT CUSTOMER END USER PLANT AREA ITEM SITE YEAR
LINDE/EXXONMOBILE/ BAYTOWN 1.55Mio
MITSUBISHI HEAVY INDUSTRIES, LTD. EXXON MOBILE ETHYLENE PLANT METALLIC USA 2015
400KT/A POLYMIDE INTEGRATION PROJECT KOBELCO FUJIAN SHEN YUAN NEW
MATERIALS CO. PETROCHEMICAL METALLIC CHINA 2015
LUBEREF YANBU REFINERY EXPANSION DKME ARAMCO REFINERY METALLIC SAUDI 2014
ERC REFINERY PJT DKT EGYPTIAN REFININGCOMPANY REFINERY METALLIC EGYPT 2014
RABIGH 2 REFINING & PETROCHEMICAL PJT DOOSAN MECATEC ARAMCO REFINERY H/EX
BELLOWS SAUDI 2014
USGC PETROCHEMICALS PJT WOOYANG HC GULF COAST PARTNERS PETROCHEMICAL METALLIC USA 2014
PETRON BATAAN RMP-2 PJT PUNGSUNG PRECISION - PETROCHEMICAL RUBBER PHILIPPINES 2013
REHABILITATION & ADAPTATION PJT ALRIERS
REFINERYDOOSAN MECATEC TECHNIP FRANCE REFINERY METALLIC FRANCE 2013
ALGIERS REFINERY PJT DOOSAN MECATEC TECHNIP FRANCE REFIENRY METALLIC FRANCE 2012
DAELIM/TONGSHU PETRO PJT. MITSUBISHI HEAVY INDUSTRIES – HIROSHIMA DAELIM INDUSTRIAL PETROCHEMICAL METALLIC KOREA 2011
Page 40
PROJECT COUNTRY CONTRACTOR CONSTRUCTION SCALE ITEM YEAR
Incheon Bridge PKG Korea Daelim Industrial Co. L=18.38km, B=800m E-Shape 2005-2009
Ulsan Bridge Korea Hyundai E&C L=8.38km, B=1,150m LRB 2010-2015
UijeongbuLightweight Train Korea GS E&C L=10.6km, B=4.16m RB, POT, Finger Joint 2007-2012
Daegu Monorail Korea POSCO E&C etc. L=23.95km, B=5m Beam Manufacture/Construct, Finger Joint 2009-2014
Lee Soon-Shin Bridge Korea Daelim Industrial Co. L=2,260m, B=25.7m LRB, POT 2007-2013
Gwang-Ahn Bridge Korea Daelim Industrial Co. L=7.42km, B=24m LRB 1994-2003
Bitgaram Bridge Korea Hyundai E&C L=720m, B=31m LRB, RB, FPB 2010-2013
Mooyeong Bridge Korea Hyundai E&C L=860m, B=26.6m Finger/Rail Joint 2011-2012
Yeoju-YangpyeongExpressway 4 Korea GS E&C L=915m, B=12.3m RB, LRB,
Finger/Rail Joint 2006-2013
Baekseok Bridge Korea GS E&C L=749m, B=36m LRB, POT, Finger/Rail Joint 2010-2012
Kuemgang 2 Bridge Korea Daelim Industrial Co. L=1,000m, B=41m LRB, RB, Finger Joint 2011-2012
Kuem-ga Bridge Korea SK E&C L=795.6m, B=23m LRB, FPB, Finger Joint 2005-2013
An-dong Bridge Vietnam Hyundai Amco, RCC L=3,526m, B=27m LRB, POT 2009
Major ExperienceMajor Experience List (UET - Construction, Domestic in Bridges)
Page 41Page 41
PROJECT COUNTRY CONTRACTORITEM
YEARSIZE(W*L*H) Q’TY STANDARD
IZMIR LNG Tank(Seismic isolator) Turkey Egegaz LRB
D900 353EA AASHTO 2000
Van may 2 and Mat trat Bridge Vietnam
Cong Ty ThnhMot Thanh
Vien Xay Dung99
Elastomeric Bearing, E/J
300*400*7835EA AASHTO 2012
Rabigh Power Plant No. 6 Saudi Arabia Doosan H&C Elastomeric Bearing
300*400*132 26EA BS 2012
Connecting road to Saigon university Vietnam THANG LONG
CONSTRUCTION350*300*50300*150*50
97EA401EA AASHTO 2013
Southern Coastal Corridor Project Vietnam Ssang Yong
Construction450*250*50400*200*50450*350*78
123EA115EA91EA AASHTO 2014
Bolivia Banegas Bridge Bolivia Hyundai Development Company
LRB600,1100 1300TON 2015
Sheikh Jaber Al-Ahmad Al Sabah Causeway
(Main & Doha Link)
Kuwait Hyundai E&CGS E&C
650*650*225700*700*175
900*900*270 etc2076EA AASHTO 2015-2018
15000 Ton Goliath Crane Project Singapore EK Heavy Industries POT Bearing 15000 TON 2018
Major Experience List (UET - Construction, Overseas)