Page 1Page 1

We, UET & HKR, are the leading equipment manufacturers in plant & construction industries with more than 45 years of experience.

To achieve higher customer satisfaction, UET & HKR started a single integrated organization from 2011.

Unison eTech Co., Ltd. (UET) & HKR Co., Ltd.

CUSTOMER SATISFACTION

UET HKR

Page 3: Presentation UET&HKR (1903) Eng - PTP

Page 2

Page 4: Presentation UET&HKR (1903) Eng - PTP

Page 3Page 3

Page 5: Presentation UET&HKR (1903) Eng - PTP

Page 4Page 4

History

HKR Co., Ltd.

2018 Open HKR R&D Center

2016.12 Awarded for Top 10-Million USD Export Achievement

2016.01 Selected as Regular Member of Korea Dongsuh Power Generation SMB Council

2014.06 Registered as one of the 5 qualified power generation equipment & material suppliers in Korea

2013.05 Joined in EJMA member

2013.02 Acquired ASME “U2” stamp

2011.12 “2011 Excellence Award” from GE AERO ENERGY

2010.07 Acquired ISO18001 Certificate

2009.08 Started operation of HKR Vietnam Co., Ltd.

2007.06 Acquired ISO14001 Certificate

2006.05 “2005 year” Best Supplier award from TOSHIBA CORP.

2002.07 Acquired ASME “U” & “PP” stamp

2000.08 Acquired ISO 9001 Certificate

1974.07 Started to produce E/J for the 1st time in Korea

1972.10 HKR Co., Ltd. Establishment

UNISON eTech Co., Ltd.2018 Opening Global offices in India & Spain

2017

Signed an Global Partnership Agreement with Samsung C&T CorporationQualified to supply parts for power plants to Russian nuclear power plants ROSATOM

2016.07 Obtained OHSAS 18001:2007 Certificate

2015.02 Selected as an Outstanding Subcontractor for Doosan Heavy Industries & Construction

2012.05 Acquired certification for new environmental technology in biogas plant industry (first in Korea)

2011.09 Acquired 100% of shares of HKR Co., Ltd.,

2011.05 HCP acquired UNISON Hi-Tech and renamed to UNISONeTech Co., Ltd.

2009.10 UNISON Hi-Tech was spun off from UNISON as a wholly owned subsidiary

2006.11 Acquired ISO14001 Certificate

1997.09 Acquired KEPIC Certificate

1997.03 Acquired ASME “NS” & “NPT” Certificate

1994.12 Acquired ISO9001 Certificate

1987.12 Technical License with Grinnel (ANVIL, USA) for Pipe Hanger & Support

1984.09 UNISON Co., Ltd. Establishment

Page 6: Presentation UET&HKR (1903) Eng - PTP

Page 5Page 5

Organization & Employee Status

UNISON eTech(CEO Mr. B.K Koo)

Vietnam Factory & Branch Office

HKR(CEO Mr. B.K Koo)

▣ Organization

▣ Employee Status

Description UET HKR

Administration 26 7

Sales 25 9

Design 32 9

Production 17 9

Procurement 4 3

QA 9 9

R&D 5 2

Worker 104 44

Total 222 92

Ove

rsea

s Bus

ines

s D

ivis

ion

Plan

tBu

sine

ss D

ivis

ion

Cons

truc

tion

Busi

ness

Div

isio

nR&D Center

Adm

inis

trat

ion

Div

isio

n

Purc

hasi

ngM

anag

emen

t D

ivis

ion

Prod

uctio

n D

ivis

ion

Qua

lity

Man

agem

ent

Div

isio

nBusiness Divisions Support Divisions

100% Shareholder

Spain, India Branch Office

Page 7: Presentation UET&HKR (1903) Eng - PTP

Page 6Page 6

Location

Head Office & Factory (CheonAn)- Spring Hanger & Pipe Support- Damper- Sound Proof Wall- LRB, Pot Bearing- Expansion Joint- Large Bore Piping

- Gross Area: 98,511㎡ / Indoor: 24,512㎡

Vietnam Factory (Binh Duong)- Non-Metallic Expansion Joint- Metallic Expansion Joint- Large Bore Piping- Gross Area: 7,798㎡ / Indoor: 3,900㎡

Overseas Sales Office (Seoul)- Sales & Engineering Team

1 hour 40 min.

Spain Branch India Branch

Page 8: Presentation UET&HKR (1903) Eng - PTP

Page 7Page 7

Business Status in 2018

▣ HKR Co., Ltd.2018 Sales Total : 21.1 Million USD

61%

5%4%

30%

<Industrial>

ThermalPetroNuclearLNG

72%

28%

<Market>

DomesticOverseas

57%43%

<Market>

DomesticOverseas

2018 Sales Total : 58.4 Million USD (Plant : 33.4 Million USD – 57% / Construction : 24.9 Million USD – 42%)

▣ UNISON eTech Co., Ltd.

18%

34%

3%2%43%

<Industrial>ThermalPetroNuclearLNGConstruction

Page 9: Presentation UET&HKR (1903) Eng - PTP

Page 8Page 8

Exp.Date : Jul.24, 2020 Exp.Date : Jul.24, 2020 Exp.Date : Jul.24, 2020

Exp.Date : Mar.02, 2021

Exp.Date : Jul.24, 2020

Exp.Date : Apr.30, 2019 Exp.Date : Jul.26, 2019 Exp.Date : Feb.21, 2019 Exp.Date : Aug.04, 2019

Exp.Date : Jan.23, 2019

Exp.Date : Jul.14, 2021 Exp.Date : Jul.14, 2021 Exp.Date : Aug.19, 2019

Exp.Date : Sep.28, 2019

ASME “NS”

KEPIC MN-152

ISO 9001 ISO 14001

Certificates

ISO 9001 ISO 14001 OHSAS 18001 KEPIC MN-148

ASME “U” ASME “PP” ASME “S” ASME “U2”

Exp.Date :May.07, 2021 Exp.Date : Sep.28, 2020 Exp.Date : N/A Exp.Date : Sep.28, 2019

EJMA MEMBERSHIP(Expansion Joint Manufacturers

Association)

PED(Pressure Equipment Device)

ABS BV GTT LR

Exp.Date : Jun.30, 2022

DNV

Exp.Date : N/A

CE Certificate

▣ UET – SPRING HANGER & PIPE SUPPORT, BRIDGE BEARING

▣ HKR – EXPANSION JOINT

Exp.Date : Jul.14, 2019

OHSAS 18001

Exp.Date : Aug.19, 2019

ASME “NPT”

Page 10: Presentation UET&HKR (1903) Eng - PTP

Page 9Page 9

EQUIPMENT NAME CAPACITY Q’TY

Mixing Mill22” x 60”18” x 48”

2

CNC Machining Center AJV-3580 10

CNC plane Miller RB-2N 1

Multi Axis Drill Machine 7 Axis 2

Milling Machine # 7 3

Tapping Machine HTM-18M 1

CNC Laser Cutting 5’ x 10’ 2

Overhead Crane 10, 20 Ton 10

EQUIPMENT NAME CAPACITY Q’TY

PMI Tester Master Pro 1

Fatigue Tester 2MN 1

Universal Tester 10 kN 1

Compression Tester 500 kN 1

Infrared Temp’ Indicator 0 ~ 400 ℃ 1

Surface Temp’ Indicator 720 ℃ 1

Ultrasonic Thickness Test 1 ~ 200 mm 1

Electrical Scale 500 Kg 1

▣ Inspection & Test▣ Manufacturing

Major Equipment - UET

Page 11: Presentation UET&HKR (1903) Eng - PTP

Page 10Page 10

Major Equipment - HKR

EQUIPMENT NAME CAPACITY Q’TY

Hydro Press M/C 50 ton ~ 1500 ton 8

Roll Forming M/C Max 4M Dia. 3.5Kw 1

Urethane Bend M/C 4M Dia. / 1M Dia. 2

Overhead Crane 2 Ton ~ 25 Ton 18

Ganty Crane 5 Ton / 7.5 Ton 3

Auto Tube Weld M/C Max. 3.2T x 1250L 2

Turning Roller 3 ton ~ 10 ton 7

EQUIPMENT NAME CAPACITY Q’TY

Welding Gauge 0~60mm, 0~50mm 1

Universal Testing Machine 50ton, 0.02KN 1

High Press Pump 250bar 2

Vacuum Test Pump 0~-760mmHg 2

Helium Leak Detector HELIOT 701W1 1

Surface Measuring Instrument -200~150㎛ 1

Cycle Test Machine Φ1400 X 3M 1

Fatigue Test Machine Φ1400 X 1M 1

Bore Scope Φ4.0MM X 3.5M 1

PMI Tester XL2-800 1

▣ Inspection & Test▣ Manufacturing

Page 12: Presentation UET&HKR (1903) Eng - PTP

Page 11Page 11

Business Area

UNISON eTech Co., Ltd. HKR Co., Ltd.

• Variable Spring Hanger• Constant Spring Hanger

• Cold Support• Sway Strut

• Hydraulic Snubber• Damper

PLANT

CONSTRUCTION

• Seismic-Resistance Isolation • Vibration Isolation

• Expansion Joint• Sound proof Wall

• Metallic Expansion Joint• Flexible Joint• Non-Metallic E/J• Rubber Expansion Joint• Large Bore Piping• Piping Spool

PLANT

Page 13: Presentation UET&HKR (1903) Eng - PTP

Page 12Page 12

- Major Products (Spring Hanger & Pipe Support / Damper)

- Production Capacity

Application : 1. Power Plant2. Petrochemical3. LNG / LPG4. Shipbuilding

Page 14: Presentation UET&HKR (1903) Eng - PTP

Page 13

Prevents thermal expansion of the pipe from the general operating load & pipe movement

Maximum Available Load : 40 tons

Support Type (Type F)Hanger Type (Type B, C)

1) Variable Spring Hanger

Major Products

Page 15: Presentation UET&HKR (1903) Eng - PTP

Page 14

Prevents thermal expansion of the pipe from the severe operating load & pipe movement (For critical pipe line)

Maximum Available Load : 40 tons

Hanger Type (Type G, B, C) Support Type (Type F)

2) Constant Spring Hanger

Major Products

Page 16: Presentation UET&HKR (1903) Eng - PTP

Page 15

A sway strut is a device used to restrain movement of piping in one direction while providing for movement due to thermal expansion or contraction in another direction.

3) Sway Strut

Major Products

Page 17: Presentation UET&HKR (1903) Eng - PTP

Page 16

Applicable area : LPG, LNG Terminal Used in the low temperature of the pipe line (up to -196 ℃) Main Material : Polyurethane / Compressed & shaped wood

4) Cold Support

Major Products

<SAMCHEOK LNG TERMINAL, KOREA>

Page 18: Presentation UET&HKR (1903) Eng - PTP

Page 17

Threaded Rod

Hydraulic Snubber Pipe Clamp Turnbuckle

U-BoltSway Strut

5) Accessories

Major Products

Page 19: Presentation UET&HKR (1903) Eng - PTP

Page 18

Major Products

6) Damper

Louver Damper (Low & Zero Leakage, Control)

Tandem Damper(Zero Leakage)

Guillotine Damper (Slide) (Low & Zero Leakage)

Stack Damper(Rain Protection)

Wafer Damper(Butterfly) Poppet Damper Diverter Damper

(HRSG Bypass System)

Function : block Gas / switch Gas flow. Type : Selected and supplied according to customer's requirement Material : Carbon / Alloy (6~14% moly) / Stainless Size : Maximum 20m Leakage : Low & Zero Leakage

Page 20: Presentation UET&HKR (1903) Eng - PTP

Page 19

Service

Engineering

Field Inspection Service

Repair & Installation

Provide differentiated service in CAE analysis of machinery, piping and design manufacturing for many years

Offer a wide range of service relate to plant facilities as

routine maintenance, technical support through technical

standard and regular plan

Support reverse engineering, product fabrication and field repair

Page 21: Presentation UET&HKR (1903) Eng - PTP

Page 20

Production Capacity

Variable Spring Hanger 750 EA / Month

Constant Spring Hanger 500 EA / Month

Cold Support500 EA / Month

Sway Strut 1,200 EA / Month

Pipe Clamp 200 Ton / Month

Threaded Rod150 Ton / Month

Steel Structure300 Ton / Month

Page 22: Presentation UET&HKR (1903) Eng - PTP

Page 21Page 21

- Major Products (Expansion Joint / Piping Spool)- Production Capacity

Application : 1. Power Generation2. Oil & Gas Industry3. Steel Mills & Cement Works4. Marine (On-shore/Off-shore)5. Environment Plant

Page 23: Presentation UET&HKR (1903) Eng - PTP

Page 22Page 22

FCC REFINERY TYPE

JACKET TYPE GIMBAL TYPE

T-VOLUME BALANCE TYPE T-PRESSURE BALANCE TYPE

RFCC UNIVERSAL TYPE RECTANGULAR TYPE

Major Products

BOILER DUCT (ALSTOM MANJUNG TPP PROJECT)

Page 24: Presentation UET&HKR (1903) Eng - PTP

Page 23Page 23

DOG BONE TYPE (CONDENSER) CASING SEAL TIGHTENESS TYPE (HRSG) CASING MULTI TYPE (HRSG)

GE/ 7FA DIFFUSER GE/ 9H DIFFUSER GE/ 9H DIFFUSER

TOYO / CHILE FCC PJT THERMAL POWER BOILER DUCT SITE REPLACE SERVICE

Major Products

Page 25: Presentation UET&HKR (1903) Eng - PTP

Page 24Page 24

BORE SCOPE 3D INSPECTION GAS TURBINE FUEL LINE NUCLEAR PIPING

TAIWAN WATER LINE OSAKA GAS STATION KOREA WATER LINE SITE INSTALLATION

Major Products

Page 26: Presentation UET&HKR (1903) Eng - PTP

Page 25Page 25

HYDRAULIC TEST PRESSURE CYCLE TEST FIELD CRYOGENIC TEST

ASSEMBLY FIELD(SHIP) INSTALLATION

Major Products

Page 27: Presentation UET&HKR (1903) Eng - PTP

Page 26Page 26

Major Products

2-NOZ’L TYPE 3-NOZ’L TYPE

BFPT SHOP ASS’YNUCLEAR FWPT

4-NOZ’L TYPE

BFPT SITE INSTALLATION

Page 28: Presentation UET&HKR (1903) Eng - PTP

Page 27Page 27

Major Products

INSTALLATION AT SITE

HORIZONTAL TYPE STEAM VENT SILENCERS

DELTAK LLC

TOSHIBA COCO / THAILAND

DELTAK LLC

DARWIN LNG / AUSTRALIADELTAK LLC

CAOJING HRSG / CHINA

DELTAK LLC

PT ARUN / MALAYSIA

Page 29: Presentation UET&HKR (1903) Eng - PTP

Page 28Page 28

Production Capacity

Metallic Expansion Joint

Metallic Expansion Joint

Bellows for LNG Carrier

1

Flexible Joint3

Non-Metallic Expansion Joint

Non-Metallic Expansion Joint

Rubber Expansion Joint

2

Piping Spool & Duct

Large Bore Piping & Duct

Piping Spool (3D)

4

Temperature Range

Pressure Range

-196℃ ~ 1,500℃

Full Vacuum ~ 250 Bar

15 D ~ 7,000 D

q15 D ~ Owner

Required

25 D ~ 1,750 D

25 D ~ 4,000 D

25 D ~ 3,000 D

1,000 D ~ 6,000 D

q10 D ~ Owner

Required

850 EA

650 EA

150 EA

450 EA

450 EA

200 Ton

100 Ton

Capability Capacity/Month

Page 30: Presentation UET&HKR (1903) Eng - PTP

Page 29Page 29

- Overview- Major Products

(Bearing, Expansion Joint, Sound poof Wall)

Application : 1. Bridge

2. Building (Vibration Isolation)

3. Plant

Page 31: Presentation UET&HKR (1903) Eng - PTP

Page 30

- Best for seismic isolation design service and know-how

- Secure best performance with strict quality control system

- Maximize field satisfaction with various construction know-how for field condition

- Optimal delivery service according to project management

Overview

Application Example

Bearing Expansion Joint Sound Proof Wall

Special Features

Page 32: Presentation UET&HKR (1903) Eng - PTP

Page 31

Major Products I

Rubber Bearing Pot Bearing SEB (Spherical Elastomeric Bearing)

Disc Bearing

Energy Dissipation System Lead Rubber Damper

Safe Damper Smart Wall

Seismic Resistant Bearing

Base-Isolation Bearing Vibration Control

Lead Rubber Bearing

(For Bridge)

Page 33: Presentation UET&HKR (1903) Eng - PTP

Page 32

Major Products II

Waterproof Finger JointSegment Mold

Mold Expansion Joint

Rail Type Expansion Joint

Sound Proof Wall

Sound Reflection Type Sound Absorption Type Sound Proof Tunnel

Finger Type Expansion Joint

Page 34: Presentation UET&HKR (1903) Eng - PTP

Page 33

Production Capacity

ITEMCAPACITY

UNITMonth(Normal) Year(Normal) Month(Max.) Year(Max.)

Rubber Bearing 550 6,600 1,100 13,200 SET

Lead Rubber Bearing 130 1,560 260 3,120 SET

POT Bearing 300 3,600 800 9,600 SET

FINGER JOINT 200 2,400 480 5,760 M

Page 35: Presentation UET&HKR (1903) Eng - PTP

Page 34Page 34

- Major Customers- Major Experience List (UET-Plant)- Major Experience List (HKR)- Major Experience List (UET-Construction)

Page 36: Presentation UET&HKR (1903) Eng - PTP

Page 35Page 35

Major Customers

Domestic

Overseas

End-User

Page 37: Presentation UET&HKR (1903) Eng - PTP

Page 36Page 36

Major Experience List (UET Plant – Power Plant)

PROJECT CUSTOMER END USER PLANT AREA ITEM* SITE YEAR

UAE BARAKAH NUCLEAR POWER PLANT #1~#4 KOREA ELECTRIC POWER CORP. KOREA ELECTRIC POWER

CORPNUCLEAR POWER

PLANT VS,CS,RG,ETC UAE 2013~8

MALAYSIA FAST TRACK 3A DAELIM INDUSTRIAL TNB THERMAL POWER PLANT VS,CS,SN,ST,ETC MALAYSIA 2014~7

TAEAN TPP #9~#10 DAELIM INDUSTRIAL KOREA WESTEN POWER CORP.

THERMAL POWER PLANT

VS,CS,SN,RG,ETC KOREA 2012~7

ALGERIA MEGA DEALHRSG BHI SPE CCPP VS,CS,ETC ALGERIA 2017

NORESTE ESCOBEDO AMEC FOSTER WHEELER ENERGIA

IBERDROLAGENERATION MEXICO CCPP VS, RG MEXICO 2016

HAIL PROJECT HRSG AMEC FOSTER WHEELER ENERGIA

SEC(SAUDI ELECTRICITY

COMPANY)

THERMAL POWER PLANT RG, ETC SAUDI 2015

PP10/ PP12 CCPP PROJECT ARABIAN BEMCO CONTRACTING

SEC(SAUDI ELECTRICITY

COMPANY)CCPP VS,CS,RG,ETC SAUDI 2013~4

SAMCHEOK TPP #1~#2 HYUDNDAI E&C KOREA SOUTH POWER CORP. THERMAL POWER PLANT

VS,CS,SN,RG,ETC KOREA 2014

MONG DUONG II DOOSAN HEAVY INDUSTRIES AES-TKV THERMAL POWER PLANT VS,CS,RG,ST,ETC VIETNAM 2013

RAIPUR II DOOSAN HEAVY INDUSTRIES GMR ENERGY POWER PLANT VS,CS,SN,RG,ETC INDIA 2013

QURAYYAH BLOCK 1~5 DOOSAN HEAVY INDUSTRIESSEC

(SAUDI ELECTRICITY COMPANY)

CCPP VS,CS,RG,ETC SAUDI 2013

* VS : Variable Spring Hanger / CS : Constant Spring Hanger / SN : Hydraulic Snubber / ST : Sway Strut / RG : Rigid Hanger / CD : Cold Support / HD : Hold Down Support

Page 38: Presentation UET&HKR (1903) Eng - PTP

Page 37Page 37

Major Experience List (UET Plant - Petrochemical)

PROJECT CUSTOMER END USER PLANT AREA ITEM* SITE YEAR

LPIC EPC1 SCU Project CCJV (CB&I-CTCI JOINT VENTURE) ORPIC PETROCHEMICAL CD, BULK OMAN 2017~8

S-OIL RUC PROJECT DAELIM INDUSTRIAL S-OIL PETROCHEMICAL VS, CS, ETC KOREA 2017

RAPID PACKAGE 3 TECNICAS REUNIDAS PETRONAS OIL&GAS CS MALAYSIA 2017

KNPC CLEAN FUELS(MAB#1)

PSCJ(Petrofac, Samsung, CB&I JV) KNPC OIL&GAS CL, HD KUWAIT 2017

RGT-2 SAMSUNG C&T PETRONAS REFINERY CD, ETC KOREA 2016

STC A2 SAMSUNG ENGINEERING SAMSUNG TOTAL REFINERY VS,CS,CD,ETC KOREA 2014

JAC SK E&C JURONG AROMATICS CORP. REFINERY VS,CS,RG,ST,ETC SINGAPORE 2013

SHAYBAH PKG. #1, #2, #4 SAMSUNG ENGINEERING ARAMCO REFINERY VS,ST,HD,ETC SAUDI 2013

RUWAIS REFINERY EXTENSIONPKG. #1 SK E&C TAKREER REFINERY VS,CS,SN.ST UAE 2012

RUWAIS REFINERY EXTENSIONPKG. #3 SAMSUNG ENGINEERING TAKREER REFINERY VS,CS,SN.ST UAE 2012

OPAL DFCU & AU SAMSUNG ENGINEERING ONGC-PETRO OIL&GAS CD INDIA 2010~2

HABSHAN 5 U&O HYUNDAI E&C GASCO REFINERY VS,CS,ETC UAE 2011

* VS : Variable Spring Hanger / CS : Constant Spring Hanger / SN : Hydraulic Snubber / ST : Sway Strut / RG : Rigid Hanger / CD : Cold Support / HD : Hold Down Support

Page 39: Presentation UET&HKR (1903) Eng - PTP

Page 38Page 38

Major Experience List (HKR – Power Plant)

PROJECT CUSTOMER END USER PLANT AREA ITEM SITE YEAR

ANYANG CHP PROJECT GE INTERNATIONAL GS POWER THERMALPOWER PLANT

CROSSUNDERPIPE KOREA 2017

MAE MOH POWER PLANT GE POWER(ALSTOM)ELECTRICITY GENERATING

AUTHORITY OF THAILAND(EGAT)

THERMALPOWER PLANT

CROSSOVER DUCT THAILAND 2016

JEDDAH SOUTH POWER PLANT (#1~4)

MITSUBISHI HITACHIPOWER SYSTEMS (MHPS)

SAUDI ELECTRICITY COMPANY (SEC)

THERMALPOWER PLANT

CROSSOVER PIPE

SAUDIARABIA 2015

SULAYMANIAH GAS POWER STATION GE INTERNATIONAL MASS GLOBAL ENERGY THERMAL

POWER PLANT CROSS SAUDIARABIA 2014

KUDGI STPP (3 x 800MW) DOOSAN POWER SYSTEMS INDIA NTPC THERMAL

POWER PLANT

NON-METALEXPANSION

JOINTINDIA 2014

IMMINGHAM POWER PLANT TOSHIBA CORPORATION VPI IMMINGHAM LLP THERMALPOWER PLANT

LARGE BORE PIPE UK 2014

MONG DUONG 1 2x560MW COAL FIRED POWER PROJECT

DOOSAN HEAVY INDUSTRIES & CONS.

AES-VCM MONG DUONG POWER COMPANY

THERMALPOWER PLANT

LARGE BORE PIPE VIETNAM 2013

TRIPOIL WEST POWER PLANT HITACHI GENERAL ELECTRICITY COMPANY OF LIBYA POWER PLANT LARGE BORE

PIPE LIBIYA 2013

XUFG1 PJT TOSHIBA TOSHIBA POWER PLANT LARGE BOREPIPE USA 2013

LIN KOU POWER PLANT PJT MHI NAGASAKI MHI NAGASAKI POWER PLANT LARGE BOREPIPE TAIWAN 2013

Page 40: Presentation UET&HKR (1903) Eng - PTP

Page 39Page 39

Major Experience List (HKR - Petrochemical)

PROJECT CUSTOMER END USER PLANT AREA ITEM SITE YEAR

LINDE/EXXONMOBILE/ BAYTOWN 1.55Mio

MITSUBISHI HEAVY INDUSTRIES, LTD. EXXON MOBILE ETHYLENE PLANT METALLIC USA 2015

400KT/A POLYMIDE INTEGRATION PROJECT KOBELCO FUJIAN SHEN YUAN NEW

MATERIALS CO. PETROCHEMICAL METALLIC CHINA 2015

LUBEREF YANBU REFINERY EXPANSION DKME ARAMCO REFINERY METALLIC SAUDI 2014

ERC REFINERY PJT DKT EGYPTIAN REFININGCOMPANY REFINERY METALLIC EGYPT 2014

RABIGH 2 REFINING & PETROCHEMICAL PJT DOOSAN MECATEC ARAMCO REFINERY H/EX

BELLOWS SAUDI 2014

USGC PETROCHEMICALS PJT WOOYANG HC GULF COAST PARTNERS PETROCHEMICAL METALLIC USA 2014

PETRON BATAAN RMP-2 PJT PUNGSUNG PRECISION - PETROCHEMICAL RUBBER PHILIPPINES 2013

REHABILITATION & ADAPTATION PJT ALRIERS

REFINERYDOOSAN MECATEC TECHNIP FRANCE REFINERY METALLIC FRANCE 2013

ALGIERS REFINERY PJT DOOSAN MECATEC TECHNIP FRANCE REFIENRY METALLIC FRANCE 2012

DAELIM/TONGSHU PETRO PJT. MITSUBISHI HEAVY INDUSTRIES – HIROSHIMA DAELIM INDUSTRIAL PETROCHEMICAL METALLIC KOREA 2011

Page 41: Presentation UET&HKR (1903) Eng - PTP

Page 40

PROJECT COUNTRY CONTRACTOR CONSTRUCTION SCALE ITEM YEAR

Incheon Bridge PKG Korea Daelim Industrial Co. L=18.38km, B=800m E-Shape 2005-2009

Ulsan Bridge Korea Hyundai E&C L=8.38km, B=1,150m LRB 2010-2015

UijeongbuLightweight Train Korea GS E&C L=10.6km, B=4.16m RB, POT, Finger Joint 2007-2012

Daegu Monorail Korea POSCO E&C etc. L=23.95km, B=5m Beam Manufacture/Construct, Finger Joint 2009-2014

Lee Soon-Shin Bridge Korea Daelim Industrial Co. L=2,260m, B=25.7m LRB, POT 2007-2013

Gwang-Ahn Bridge Korea Daelim Industrial Co. L=7.42km, B=24m LRB 1994-2003

Bitgaram Bridge Korea Hyundai E&C L=720m, B=31m LRB, RB, FPB 2010-2013

Mooyeong Bridge Korea Hyundai E&C L=860m, B=26.6m Finger/Rail Joint 2011-2012

Yeoju-YangpyeongExpressway 4 Korea GS E&C L=915m, B=12.3m RB, LRB,

Finger/Rail Joint 2006-2013

Baekseok Bridge Korea GS E&C L=749m, B=36m LRB, POT, Finger/Rail Joint 2010-2012

Kuemgang 2 Bridge Korea Daelim Industrial Co. L=1,000m, B=41m LRB, RB, Finger Joint 2011-2012

Kuem-ga Bridge Korea SK E&C L=795.6m, B=23m LRB, FPB, Finger Joint 2005-2013

An-dong Bridge Vietnam Hyundai Amco, RCC L=3,526m, B=27m LRB, POT 2009

Major ExperienceMajor Experience List (UET - Construction, Domestic in Bridges)

Page 42: Presentation UET&HKR (1903) Eng - PTP

Page 41Page 41

PROJECT COUNTRY CONTRACTORITEM

YEARSIZE(W*L*H) Q’TY STANDARD

IZMIR LNG Tank(Seismic isolator) Turkey Egegaz LRB

D900 353EA AASHTO 2000

Van may 2 and Mat trat Bridge Vietnam

Cong Ty ThnhMot Thanh

Vien Xay Dung99

Elastomeric Bearing, E/J

300*400*7835EA AASHTO 2012

Rabigh Power Plant No. 6 Saudi Arabia Doosan H&C Elastomeric Bearing

300*400*132 26EA BS 2012

Connecting road to Saigon university Vietnam THANG LONG

CONSTRUCTION350*300*50300*150*50

97EA401EA AASHTO 2013

Southern Coastal Corridor Project Vietnam Ssang Yong

Construction450*250*50400*200*50450*350*78

123EA115EA91EA AASHTO 2014

Bolivia Banegas Bridge Bolivia Hyundai Development Company

LRB600,1100 1300TON 2015

Sheikh Jaber Al-Ahmad Al Sabah Causeway

(Main & Doha Link)

Kuwait Hyundai E&CGS E&C

650*650*225700*700*175

900*900*270 etc2076EA AASHTO 2015-2018

15000 Ton Goliath Crane Project Singapore EK Heavy Industries POT Bearing 15000 TON 2018

Major Experience List (UET - Construction, Overseas)

Page 43: Presentation UET&HKR (1903) Eng - PTP

Page 42

THANK YOU

Co., Ltd.