Presentation to: Technical Advisory Committee Onondaga Lake

Embed Size (px)

Citation preview

  • Slide 1

Presentation to: Technical Advisory Committee Onondaga Lake Slide 2 2HONEYWELL - CONFIDENTIAL File Number Initial Onondaga Lake Projects Ninemile Creek - Started in 2012 Geddes Brook Wetlands - Completed in 2012 Groundwater Collection - Completion in 2012 LCP Wetlands - Completed in 2007 Onondaga Lake Current Shrub Willow Farm NYS Fairgrounds SB 1-8 - Started in 2012 Slide 3 3HONEYWELL - CONFIDENTIAL File Number Community & Worker Health and Safety Safety Culture Imbedded in ALL Operations Quality Assurance Community H&S Plan HON Emergency Response Team Project H&S Plans Community H&S Plan HON Emergency Response Team Project H&S Plans Specialty Contractors Quality ControlHealth & Safety Officers Quality ControlHealth & Safety Officers Oversight Team Expertise Slide 4 4HONEYWELL - CONFIDENTIAL File Number Green Practices Sustainable Remediation Solar Panels Provide Camillus, NY Pump Station Electricity Green Concrete at Onondaga Lake SCA WTP Organic Biosolids Reuse in Camillus, NY Reclaimed Lumber for Honeywell Onondaga Lake Visitors Center Using more than 2 million gallons of Biodiesel GHG Emission Reduction +100,000 MT CO 2 E (~20,000 cars for 1 year) Slide 5 5HONEYWELL - CONFIDENTIAL File Number Geddes Brook and Ninemile Creek-Fall 2012 Slide 6 6HONEYWELL - CONFIDENTIAL File Number Geddes Brook Habitat Enhancement 50,000 Trees and Plants Slide 7 7HONEYWELL - CONFIDENTIAL File Number I-690 Onondaga Lake Groundwater Collection System Phase 1 (06) Phase 2 (08) Phase 3 (10-11) Willis Avenue Groundwater Treatment Plant Onondaga Lake Access Road I-690 Clay Marl Collection Trench Groundwater Restored Shoreline Groundwater to Treatment Facility Soil Barrier Wall Intercepts Contaminated Groundwater from Lake Barrier Wall - 1.5 miles long Average depth 30 to 70 feet Collection system completion early 2012 Barrier Wall Installation Groundwater Collection Trench Floodplain Liner Installation Floodplain Lightweight Fill Shoreline Landscaping Slide 8 8HONEYWELL - CONFIDENTIAL File Number Barrier Wall and Tie-Back System Installation of the Tie-Rod Crane Pad Poured over Tie-Rod Tie-Rod Area Backfilled with Lightweight Fill Slide 9 9HONEYWELL - CONFIDENTIAL File Number SMU 5 Dredging & Capping Areas Dredging 2+ million cy over 200 acres Targeted removal Allow for cap placement 2012 2013 2014 2015* Capping 420+ acres 27-39 Total thickness 12-24 Habitat layer on top + 280 acres with GAC + 180 acres with pH amendment *Estimated schedule Slide 10 10HONEYWELL - CONFIDENTIAL File Number Hydraulic Dredging Hydraulic Dredge and Transport Reduced truck traffic, odor, noise, and visual impacts Enclosed system from lake to consolidation area Surrounding work areas with silt curtains Three dredges 16, 14 and 8 ~ 10% solids Dredging plans 2 million cy (~2 Carrier Domes) 200 acres 4 years Slide 11 11HONEYWELL - CONFIDENTIAL File Number 4 Miles of Double Walled Pipeline 16 / 22 HDPE Four booster pump stations 600 Hp electric pumps Lake water for pump seals Sensors between pipes Automated valves shutdown if loss in pressure Pipeline Purchased from Vari-Tech in Liverpool, NY Slide 12 12HONEYWELL - CONFIDENTIAL File Number Pipeline Route Onondaga Lake Pipeline Booster Pumps Consolidation Area Processing Area Water Treatment Plant Current Shrub Willow Farm NYS Fairgrounds Began Dredging in July 2012 Pipeline next to I-690 looking east Booster Pump Double Walled Pipe Slide 13 13HONEYWELL - CONFIDENTIAL File Number Consolidation Area and Treatment Plant Airport Road Railroad Tracks N SCA Basin (Double Lined Storm Water Basins) Processing Area (Paved) Containment Area Site Perimeter Consolidation Area Current Shrub Willow Farm Pipeline Monitoring Locations Work Zone Perimeter Water Treatment Plant June 2011 Continuous Real Time Air Monitoring Slide 14 14HONEYWELL - CONFIDENTIAL File Number Consolidation Area and Treatment Plant N SCA Basin (Double Lined Storm Water Basins) Processing Area (Paved) Monitoring Locations Work Zone Perimeter Containment Area Site Perimeter Consolidation Area Current Shrub Willow Farm Water Treatment Plant Pipeline October 2011 SCA Phase 1 Liner Complete Slide 15 15HONEYWELL - CONFIDENTIAL File Number Consolidation Area and Treatment Plant N Ninemile Creek N Processing Area (Paved) Consolidation Area (with covered Geotubes) Current Shrub Willow Farm Water Treatment Plant Pipeline Airport Road SCA Basin (Double Lined Storm Basins) Slide 16 16HONEYWELL - CONFIDENTIAL File Number Water Treatment Plant Removal of metals & organics Precipitation, clarification, filtration, and granular activated carbon 1.2 acre building 6.5 million gallons per day capacity Treated water sent to Metro for ammonia removal Carbon Vessels Thickeners & Screening Slide 17 17HONEYWELL - CONFIDENTIAL File Number Additional Odor Mitigation Approaches Slide 18 18HONEYWELL - CONFIDENTIAL File Number Sediment Erosion Protection Habitat Layer Chemical Isolation Layer Sand Carbon (bulk) pH Amendment pH Amendment / Mixing 2012 Capping & Habitat Re-establishment October 2011 Catch Pan Slide 19 19HONEYWELL - CONFIDENTIAL File Number Thank You www.lakecleanup.com After 2016 - Based on Community Input