Monitoring and quality control in restoration ecology projects Rafael Mª Navarro Cerrillo Forestry Departament-University of Córdoba Presentation outline Restoration ecology and Quality control concepts. Quality control methodology: restoration ecology as a process. Restoration ecology sucesses: from ideas to reality. Conclusions. Quality control concepts and its aplication to restoration ecology WHY QUALITY CONTROL IN RESTORATION ECOLOGY? 1 CONCEPTS

Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Monitoring and quality control in restorationecology projects

Rafael Mª Navarro CerrilloForestry Departament-University of Córdoba

Presentation outline

Restoration ecology and Quality control concepts.

Quality control methodology: restoration ecology as a process.

Restoration ecology sucesses: from ideas to reality.

Conclusions.

Quality control concepts and its aplication to restoration ecology

WHY QUALITY CONTROL IN RESTORATION ECOLOGY?

1

CONCEPTS

Page 2: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Restoration ecology

Ecological restoration is the process of assisting the recovery of an ecosystem that has been degraded, damaged, or destroyed (other Re-concepts)

Key words: process activitiesrecovery timeecosystem complexity

www.ser.org.

Restoration ecology projects are dynamic; the uncertainty

needs to be managed.

The product is not a plan (or project), it’s a process.

0

20

40

60

80

510

1520

25

0

1000

2000

3000

4000

Qua

drat

ic M

ean

Dia

met

er (c

m)

Basal Area (m2/ha)

Density (

trees/ha)

188719972000

.

1887: low density, large trees

Burn

Control Full

Minimal

Fulé et al., 2002

Page 3: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Are Restorations Successful?

Numerous successes have been described in the literature, but it is recognized that ecosystems are extremely complex and their response to physical and biological manipulations are not easy to predict. (i.e., there have been a lot of failures!)

Current restoration projects are not being done in a very organized, coherent method with little development of general theories.

SER, 2005; Hobbs and Norton, 1996

Quality control

A systematic and independent examination to A systematic and independent examination to determine if activities and related results have determine if activities and related results have caused changes and are suitable to achieve caused changes and are suitable to achieve objectivesobjectives (reliable feedback for adaptive management)

Key words: examination activities

arrangements commitments

suitability objectives

Prepare Change Request

Change Request

Review/Revise Change Request

Identify Need for Change

Update Change Log

Update Project Work Plan

Implement Change

Updated Change Request

Updated Work Plan

Ana

lyst

Team

Lea

dP

MO

Ste

erin

g C

omm

ittee Review

Change Request

Approved

Prepare Change Request

Change Request

Review/Revise Change Request

Identify Need for Change

Update Change Log

Update Project Work Plan

Implement Change

Updated Change Request

Updated Work Plan

Ana

lyst

Team

Lea

dP

MO

Ste

erin

g C

omm

ittee Review

Change Request

Approved

Page 4: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Basic Steps in Restoration

Getting organized

Identifying the problems and opportunities

Developing goals and objectives

Selecting and designing restoration alternatives

implementing, monitoring, evaluating, and adapting the project.

Restoration and quality

Get Real ¡¡

Design a process for converting ideas into management response, and test the process with

real data

Project managers must be informed by a program of systematic observation and monitoring

Some considerationsSome considerations

Forests ecosystemsrestoration

Initial quality control assesment

Page 5: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Quality control methodology

How do we proceed?

2

METHODOLOGY

Measure progress toward the goals

Control objetive Control process

Planning and project

Technical review of project

Project implementation

Field reports and integration on GIS

Initial assessment

Survey

Adjust Programming Group discussion

Technical review of projects

Begin technical review of projects at their conceptual design stage focus on project performance.

Conceptual planning GIS

Planning and project

Technical review of project

Page 6: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Identify the kind of ecosystem to be restored

Type of restoration project

Identify physical site conditions in need of repair

Identify biotic (structural) interventions that are needed

Identify landscape restrictions, present and future

Technical review of projects

Begin technical review of projects at their conceptual design stage focus on project performance.

Conceptual planning GIS

Activities Programming

Planning and project

Technical review of project

11) Site Preparation –

2) Species and Seedlings Selection -

3) Planting Methods -

4) Post plantation management -

Technical review of projects

Page 7: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Technical review of projects

Ecosystems functionality Descriptive

New technical approach Lack of technical description

Complexity Unrealistic

Systematic stratified sampling of 5-10% of total surface in Guadiamarproject.

Project implementation

Field reports and integration on GIS

Project implementation

Page 8: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Kind of ecosystem Projectdensity

Estimateddensity

Real density Plants alive

Mediterranean ecosystem725 673 92% 505 75% 465 64%

Strem ecosystem 830 771 92% 703 91% 611 73%

Transition ecosystem 980 910 92% 792 87% 681 69%

Guadiamar project

Project implementation

Make maps of implemented activities to compare with the guidelines and existing management options.

Project implementation

GIS support Change of decisions

Basic knowledge Lack of field guidelines

Quality standard Not included in project

implementation

Page 9: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Semi-permanent samples.-

In Madroñalejo andGuadiamar project , 6 control plots wereestablished

Initial assessment Survey

Initial assessment

Evolución supervivencia

0102030405060708090

100

ACEBUCHE

ADELFA

ALCORNOQUE

ALGARROBO

ALMEZ

CHOPO

COSCOJA

DURILLO

ENCINA

FRESNO

LAVANDA

LENTISCO

MADROÑO

MAJUELO

MIRTO

OLIVILL

A

PALMITO

PINO

PIRUETANO

RETAMA

ROMEROROSA

SAUCE

TARAJE

ZARZA

(%)

Suppre Suppost

Guadiamar project

Page 10: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Initial assessment

GIS and GPS control Field survey

Flexibility Time schedule

Variable control Uncertainly

Adjust programming

Group discussion

Repoblaciónde vaguadas

6 21 díaslu 02/04/01 lu 30/04/01

Desbroce o rozas

8 22 díasma 01/01/02 mi 30/01/02

Eliminaciónarboladomuerto1 64 díaslu 03/01/00 ju 30/03/00

Aplicación de fitocida

2 22 díasvi 31/03/00 lu 01/05/00

Repoblaciónen monte

3 43 díasvi 31/03/00 ma 30/05/00

Repoblaciónen monte

5 86 díaslu 01/01/01 lu 30/04/01

Desbroce o rozas

4 21 díasvi 01/12/00 vi 29/12/00

Repoblaciónen monte

9 41 díasvi 01/02/02 vi 29/03/02

Tratamientosculturales

7 65 díasvi 01/06/01 ju 30/08/01

Decapado

1 74 díaslu 06/11/00 ju 15/02/01

Guíay resalveo

2 39 díasvi 24/11/00 mi 17/01/01

Casillas y plantación

3 43 díasju 18/01/01 lu 19/03/01

Guíay resalveo

4 16 díasvi 23/02/01 vi 16/03/01

Adjusts projects as tools to achieve the goals

Adjust programming

Adjust programming

Better programming Improvisation

Adaptability Burocrathy

Complexity Unrealistic

Page 11: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Restoration ecology sucesses: from ideas to reality

WHERE ARE WE & WHAT HAVE WE LEARNED?

3

CONSECUENCIES

where are we & what have we learned?

“monitoring is scary”sounds like evaluation (judgement)

“monitoring is hard and a waste of time”sounds like research (complex, time consuming, irrelevant)

shifting to:“we can use this”

The cost of monitoring

Total cost: 3.300 €/month.Software and GPs equipment, cartography.

Technician and field team.

10 restoration projects

Page 12: Presentation outlineportales.gva.es/ceam/reaction/workfiles/Navarro-pp1.pdf · Presentation outline Restoration ecology and Quality control concepts. Quality control methodology:

Conclusions

NEW PROGRESS IN RESTORASTION?

4

THE FUTURE

Conclusions

There is a lack of monitoring in restoration projects

Develop shared understanding of restoration ecology projects from project monitoring and reporting

Work towards a common conceptual model of monitoring development as basis tool for common approach to restoration

Identify next steps for technical development in restoration ecology plans

Support networking among projects to facilitate sharing of monitoring approaches, measures, tools.