26
Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY INDUSTRY) 20.11.2006

Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

Embed Size (px)

Citation preview

Page 1: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

Presentation

By

Balraj Bhanot

Chairman TEDC(BIS) & Adviser IDTR

Former Chairman CMVR – Technical Standing Committee (MoRT&H)

& Director ARAI & DDG (HEAVY INDUSTRY)

20.11.2006

Page 2: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

•Inspection and Certification

Page 3: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

Proposal for Effective Inspection and Certification Regime

• Dovetail the present PUC system with I/C centres

• Develop loaded mode emission test methods in the long run

• Use technologies like Remote Sensing Device (RSD) as a supplement tool to identify gross polluting vehicles

• Change Pass/fail cut off points dynamically

• Involve general public in identifying the gross polluting vehicles by sending the SMSs through mobile phones or using the toll free numbers

• Introduce an efficient maintenance system to rectify the vehicles that have failed in the I/C centers

Page 4: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

Proposal for Effective Inspection and Certification Regime

• Introduce certification and audit system for repair workshops

• For the quality of the services by the test centers, introduce audit system

• Develop a centralized software which is common to all the I&C centers for data transfer, storage, data analysis, uploading on a web site, etc

• I&C equipment manufacturers and suppliers to train I&C operators

• The validity of the I/C centres should be linked to 5 years AMC

Page 5: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

Vehicle Population - Vintage wise

1991-199621%

2000-20018%2001-2002

9%

1971-199133%

1996-200029%

Based on Vehicle Sales Data

Page 6: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

Side slip TesterNoise TesterBrake TesterSpeedometer TesterHeadlamp TesterTread depth gauge for TyresRoller Dyno4 gas analyserPC with software

EQUIPMENT REQUIRED

SAFETY

POLLUTION

TYPICAL FACILITY LAYOUT FOR INSPECTION & CERTIFICATION OF IN-USE VEHICLES

Page 7: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

Automation of Safety & Emissions test for Fitness Certification (Burari, Delhi)

Data

Noise

Emission

Speedometer

Brakes

Side-slip

Suspension

Joint Play

Headlights

CNG Safety

Automated Vehicle Inspection Unit at Burari, Delhi

Page 8: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

1

Automation of Safety & Emissions test for Fitness Certification (Burari, Delhi)

Inauguration of the facility by the Honorable Chief Minister & Honorable Transport Minister of Delhi on 1st July 2005

Page 9: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY
Page 10: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY
Page 11: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY
Page 12: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY
Page 13: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY
Page 14: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY
Page 15: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY
Page 16: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY
Page 17: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY
Page 18: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

I&C Center – Burari (Delhi)

Two automated fitness testing lanes with computerised testing equipment:

one for auto rickshaw, taxis, RTVs and vehicle up to 3.5 tons, and

other for buses, trucks and other commercial vehicles

Page 19: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

I&C Center – Burari (Delhi) :Observations on Visual Inspection of Vehicles

Speed governor missing & not functioning

Speedometer not present or not functioning

Lambda sensor missing

Extensive exhaust leak

Headlamps not properly focused & also lacks desired intensity

Front/rear indicator either not functioning or covered with grill.

Page 20: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

I&C Center – Burari (Delhi) :Observations on Visual Inspection of Vehicles

Parking brake not functioning

Horn not working and fitted with pressure horns – which are not allowed

Only one wiper on driver side

Improper gearbox mounting and gearbox/differential oil leakage.

Warning triangles and reflectors absent

Page 21: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

I&C Center – Burari (Delhi) :

Observations on Visual Inspection of Vehicles

Abraded and worn out tyres

Wheel nuts missing

Shock absorber either missing or not properly mounted

Gearbox cover missing

Propeller shaft joints to differential not proper 

Page 22: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

I&C Center – Burari (Delhi) :

Observations on CNG vehicle visual inspection

Compliance plate missing

Vent pipes missing or not connected

Necessary emergency tools like fire extinguishers & first aid kit missing

Dust caps in the CNG filling valve either missing or nonfunctional

Wiring harness not proper

Page 23: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

Visual Inspection

18

36

5155 57

62

70 71

84

90

0

10

20

30

40

50

60

70

80

90

100

4 9 5 10 8 6 3 7 2 1

Fault description

No

of

Ve

hic

les

Total Sample Size 105

1) speed governor2) Lamda sensor3) Exhaust leak4) Horn5) Headlight6) wiper System7)Parking Brakes8) F/R reflectors9) Gear box oil leakage10) speedometer

Page 24: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

CNG Checks

02

4 45

78

9

1213 13

1416

17 17

21

24

2829

32

35

40

5051

0

10

20

30

40

50

60

19 1 20 21 2 17 23 4 31 3 34 42 12 13 41 16 35 33 38 26 37 36 40 39

Fault description(for details refer checklist)

No

of

Veh

icle

s Total Sample size: 57

Page 25: Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical Standing Committee (MoRT&H) & Director ARAI & DDG (HEAVY

Observations on CNG vehicle inspection

• No compliance plate was observed on CNG vehicles

• Vent pipes were either absent or not connected• Necessary emergency tools like fire

extinguishers & first aid kit were absent on CNG vehicles

• Dust caps in the CNG filling valve were either missing or nonfunctional in few vehicles.

• Wiring harness in CNG vehicles were not proper