PRESENT & FUTURE
OF CERNAVODA NPP
ROMANIA
Dr. IONEL BUCUR
CERNAVODA NPP SITE DIRECTOR
& SNN SA CNO
FEBRUARY 2016
NUCLEARELECTRICA S.A.
CERNAVODA NPP
ROMANIA HAS ONE NUCLEAR POWER PLANT LOCATED IN
CERNAVODA AND OPERATED BY S.N. NUCLEARELECTRICA S.A
Nuclear Fuel Facility
SNN Head-Office
Cernavoda NPP
Heavy Water Plant
2
Power
MW(e)
Type Operation since
Cernavoda 1 706,5 PHWR 1996
Cernavoda 2 704,8 PHWR 2007
Cernavoda 3 720 PHWR Under construction
Cernavoda 4 720 PHWR Under construction
Cernavoda 5 706,5 PHWR Not any more
considered
CERNAVODA NUCLEAR POWER PLANT
CERNAVODA NUCLEAR POWER PLANT
3
SNN SA HAS BEEN LISTED TO THE BUCHAREST STOCK EXCHANGE
WITH 10% OF ITS SHARES IN LATE 2013;
ROMANIAN STATE IS THE MAJORITY SHAREHOLDER (81,27%), THE
REMAINING SHARES BEING OWNED BY “FONDUL PROPRIETATEA”
(9,72%) AND OTHER SHAREHOLDERS (9%);
SNN SA HOLDS 100% OF ENERGONUCLEAR SA SHARES, THE
COMPANY THAT HAS DEVELOPED THE PROJECT ON CONSTRUCTION
AND COMMISSIONING OF CERNAVODA NPP UNIT 3 & UNIT 4.
THE OPERATOR OF CERNAVODA NPP UNIT 1 & 2 (1413 MW INSTALLED)
IS THE UTILITY:
SOCIETATEA NATIONALA NUCLEARELECTRICA S.A. (SNN),
ESTABLISHED IN 1998;
4
SNN S.A.
BUCHAREST
CERNAVODA NUCLEAR POWER PLANT
PITESTI NUCLEAR FUEL FACILITY
• SAFE & EFFICIENT OPERATION OF UNITS 1 & 2 – CANDU 6
• MANAGEMENT OF ALL SNN ASSETS IN CERNAVODA, INCLUDING PRESERVATION OF
UNITS 3 – 5 & HEATING SUPPLY TO CERNAVODA TOWN
• NUCLEAR FUEL FABRICATION
5
ELECTRICAL POWER PRODUCTION TO END OF JUNE 2015 (GWh) – BREAKDOWN
BY RESOURCE TYPE
ROMANIA IS CLOSER TO ACHIEVING SUSTAINABLE ENERGY SYSTEM LARGELY
BECAUSE A HIGHER SHARE OF ITS ENERGY MIX COMES FROM LOW CARBON
ENERGY SOURCES, SUCH AS HYDRO, NUCLEAR AND RENEWABLE SOURCES
(~65%). 6
CERNAVODA NUCLEAR POWER PLANT
MISSION/ VISION
TO GENERATE ELECTRICAL AND THERMAL POWER USING NUCLEAR
TECHNOLOGY ENSURING HIGH NUCLEAR SAFETY, ECONOMIC EFFICIENCY, AND
CARE FOR PEOPLE AND ENVIRONMENT;
7
NUCLEAR SAFETY IS A PERMANENT PREOCCUPATION IN ALL THE ACTIVITIES;
RESPECT FOR THE ENVIRONMENT AND CONCERN FOR FUTURE GENERATIONS;
UNITS 1 & 2 OF CERNAVODA NPP – TO BE MAINTAINED AMONG THE FIRST 20
NUCLEAR UNITS IN THE WORLD;
MEET ALL REQUIREMENTS & CONDITIONS IMPOSED BY EUROPEAN
COMMISSION FOR NUCLEAR INDUSTRY;
CERNAVODA NUCLEAR POWER PLANT
PRIORITIES
9
MANAGEMENT OF RADIOACTIVE WASTE AND DECOMMISIONIG ACCORDING
TO LEGAL PROVISIONS AND EUROPEAN PRACTICES;
BE INVOLVED IN U3 & U4 COMPLETION, COMMISSIONING & OPERATION;
SUPPORT THE DEVELOPMENT OF LOCAL COMMUNITY AND MAINTAIN A
PERMANENT DIALOGUE WITH LOCAL COMMUNITY IN ORDER TO INCREASE
THE ACCEPTANCE OF NUCLEAR ENERGY.
GROSS CAPACITY FACTOR U1+U2 (%)
10
PLANT PERFORMANCE
0
20
40
60
80
100
GCF U1 97.62 84.8 100.10 91.53 99.67 87.16 99.40 91.14 96.92
GCF U2 93.23 96.92 90.6 97.24 91.07 98.47 89.15 98.50 92.23
GCF U1+U2 95.37 90.87 95.35 94.38 95.37 92.82 94.28 94.82 94.58
2007 2008 2009 2010 2011 2012 2013 2014 2015
CERNAVODA NPP – IN TOP OF THE WORLD NUCLEAR
POWER PLANTS
THE RESULTS CERNAVODA NPP ACHIEVED IN RECENT YEARS HAVE PLACED
THE PLANT AMONG THE MOST PERFORMANT WORLD NUCLEAR POWER
PLANTS;
ACCORDING TO NUCLEAR ENGINEERING INTERNATIONAL (NEI) STATISTICS
THAT HAVE CONSIDERED PLANTS’ UNIT CAPABILITY FACTOR (UCF) SINCE IN
SERVICE TO THE END OF JUNE 2015, UNIT 2 IS SITUATED ON 3RDPLACE, AND
UNIT 1 ON 14TH, WITH A UCF OF 92.7%, AND 89.4%, RESPECTIVELY, OUT OF 398
UNITS PERTAINING TO 178 UTILITIES FROM 29 COUNTRIES (AS OF OCTOBER
2015);
WITH A UCF OF 91,1% SINCE IN SERVICE, ROMANIA IS PLACED ON THE 1ST
PLACE IN THE WORLD, ACCORDING TO THE SAME MAGAZINE;
THESE RESULTS WERE ACHIEVED OBSERVING THE NUCLEAR SAFETY
REQUIREMENTS FOR POPULATION, ENVIRONMENT AND PLANT PERSONNEL.
11
IMPACT ON PEOPLE & ENVIRONMENT
CUMMULATED RELEASES OF RADIOACTIVE EFFLUENTS U1&U2 (μSv)
14
LEGAL DOSE FOR POPULATION 1000 Sv
AUTHORISATION CONSTRAINT 100 Sv
THE AVERAGE ANNUAL DOSE 0,57% FROM THE LEGAL DOSE (9 YEAR ROLLING)
0
2
4
6
8
10
12
Radioact ive eff luents U1 10.45 4.82 7.07 3.98 2.24 4.25 3.53 4.33 2.346
Radioact ive eff luents U2 0.15 0.88 1.44 1.75 1.37 2.05 1.99 1.68 2.662
Total 10.6 5.7 8.51 5.73 3.61 6.30 5.52 5.25 5.01
2007 2008 2009 2010 2011 2012 2013 2014 2015
COLLECTIVE RADIATION EXPOSURE: COMPARISON OF CANDU-6 UNITS
MEAN VALUE (man·Sv)/ UNIT
15
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
Cernavoda NPP 0.135 0.340 0.250 0.395 0.195 0.460 0.255 0.300 0.194
CANDU-6 mean value 1.040 1.260 1.100 1.060 1.090 1.350 0.780 0.870 0.620
2007 2008 2009 2010 2011 2012 2013 2014 2015
CERNAVODA NPP – RADIOACTIVE WASTE STORAGE SOLUTION
INTERMEDIATE
DRY SPENT FUEL
STORAGE
SOLID
RADIOACTIVE
WASTE INTERIM
STORAGE
LOCATION FOR
THE LOW AND
MEDIUM LEVEL
WASTE
REPOSITARY
FACILITY
16
SPENT FUEL STORAGE SOLUTION
AFTER 7 YEARS OF COOLING IN THE UNIT SPENT FUEL BAY, THE NUCLEAR
FUEL REMOVED FROM BOTH REACTORS IS TRANSFERRED INTO AN
INTERMEDIATE DRY SPENT FUEL STORAGE, ON SITE.
17
LOW & MEDIUM RADWASTE STORAGE SOLUTION
IN ORDER TO REDUCE THE STORAGE VOLUME FOR THE LOW AND MEDIUM
LEVEL RADIOACTIVE WASTE, THEY ARE COMPACTED AND THEN STORED IN AN
RADIOACTIVE WASTE INTERIM STORAGE, ON SITE;
TO FURTHER REDUCE THE VOLUME, THAT WASTE IS PROCESSED AND FINALLY
INCINERATED AT STUDWIK, SWEDEN;
AT THE END OF 2015 MORE THEN 57.300 KG OF SOLID RADIOACTIVE WASTE
HAVE BEEN SENT TO INCINERATION AND 2.233 KG OF ASH HAVE BEEN
RECEIVED AT CERNAVODA NPP.
18
SIGNIFICANT EXPERIENCE IN NUCLEAR GENERATION (CANDU), MORE THAN 25
YEARS OF NUCLEAR REACTOR OPERATION;
EXPECTED LIBERALIZATION OF THE ELECTRICITY MARKET AND
CONSEQUENTLY A SIGNIFICANT PART OF THE ELECTRICITY WILL BE SOLD ON
THE COMPETITIVE MARKET, AT HIGHER PRICES;
ELECTRICITY CONSUMPTION INCREASE AND THE EXISTENCE OF OLD
ELECTRICITY GENERATION ASSETS IN ROMANIA DETERMINE THE NEED FOR
NUCLEAR INVESTMENTS;
COMPETITIVE ADVANTAGES & OPPORTUNITIES
MOTIVATING U3 & U4 PROJECT
HIGH PREDICTABILITY OF THE OPERATING COSTS;
RELIABLE SOURCES OF RAW MATERIALS, LOW FUEL DEPENDENCY AND LOW
VARIABLE COSTS;
OPERATIONAL STABILITY AND HIGH PERFORMANCE INDICATORS SUPPORT
RAISE IN SNN’S COMPETITIVENESS;
ELECTRICITY PRODUCTION PROCESS IS BASED ON HIGHLY PERFORMING
TECHNOLOGY, INTERNATIONALLY ACKNOWLEDGED AND WITH A HIGH NUCLEAR
SAFETY LEVEL;
NUCLEAR ENERGY IS A CLEAN, FREE OF CO2 ENERGY.
19
2 UNITS X 720 MW CANDU 6;
EXISTING STATUS OF CIVIL
CONSTRUCTION (U3 – 51%, U4
– 30%);
TODAY, THE PROJECT
COMPANY ENERGONUCLEAR
DEVELOPS THE KEY
ACTIVITIES AND BUSINESS
PROGRAM ESTABLISHED BY
SNN;
ESTIMATED VALUE 6.5B EURO.
UNITS 3 & 4 PROJECT DESCRIPTION
SNN HAS JUST SIGNED A MEMORANDUM OF UNDERSTANDING WITH CGN
INVESTOR AND HAS A FIRM PLAN TO CONTINUE NEGOCIATION FOR
INVESTOR’S AGREEMENT.
NUCLEAR NEW BUILD
20
Kosovo A
EC POSITIVE OPINION IN RELATION
WITH PROJECT (EURATOM TREATY
ART. 41) – REQUIREMENTS FOR
NEW PROJECTS;
UPDATED LICENSING BASIS
DOCUMENTS AND SAFETY DESIGN
GUIDES HAVE BEEN APPROVED BY
THE ROMANIAN NUCLEAR
AUTHORITY CONSIDERING NEW
SAFETY TARGETS;
LETTER OF COMFORT ISSUED BY
THE ROMANIAN NUCLEAR
AUTHORITY STATING THAT THE
DESIGN IS LICENSABLE;
ENVIRONMENTAL PERMIT HAS
BEEN ISSUED;
FEASIBILITY STUDY COMPLETED;
PROJECT ACHIEVEMENTS
PRELIMINARY DECOMMISSIONING PLAN & RADWASTE MANAGEMENT STRATEGY;
EXISTING STRUCTURES EVALUATED AND CONFIRMED TO BE FIT FOR PURPOSE
BY DESIGN AUTHORITY.
21
MAIN CONCLUSIONS OF THE FEASIBILITY STUDY
- PERFORMED BY ERNST & YOUNG -
THE PROJECT IS FEASIBLE BOTH FROM THE TECHNICAL
AND FROM THE ECONOMICAL POINT OF VIEW, HOWEVER
A NEW ELECTRICITY MARKET MECHANISM IN ROMANIA
WOULD BE NECESSARY TO ATTRACT FOREIGN
INVESTORS;
CANDU IS A PROVEN TECHNOLOGY WITH A LICENSABLE
DESIGN (NOT FIRST OF A KIND IN ROMANIA);
THE PROJECT ADDRESSES THE KEY LESSONS LEARNT
FROM FUKUSHIMA ACCIDENT;
EXTENSIVE O&M EXPERIENCE AND INFRASTRUCTURE
(UNIVERSITIES, TRAINING FACILITIES, DESIGN AND
MATERIALS SUPPLIERS) EXIST TO SUPPORT THE
PROJECT;
REGULATORY AND TECHNICAL RISKS ASSESSED TO BE
LOW;
PROJECT COSTS RISKS ASSESSED TO BE LOW TO
MEDIUM;
DURING THE WHOLE PERIOD OF OPERATIONS THE
LEVELISED COST OF ELECTRICITY IS LOWER THAN THE
PROJECTED AVERAGE ELECTRICITY MARKET PRICE IN
REAL TERMS.
22
S.N. NUCLEARELECTRICA – INVESTMENT STRATEGY
23
MAJOR INVESTMENTS
PARTICIPA TION IN ENERGONUCLEAR ( 100 %) ;
TOTAL INVESTMENT 6.5 BILLION EURO ;
CONSTRUCTI ON PERIOD : 201 7 - 20 23 ;
COMMISSIONING : 20 23 .
ESTIMATED VALUE FOR U1 REFURBISHMENT: 1,2 BILLION EURO ;
MAJOR CAPEX IS EXPECTED TO OCCUR BETWEEN 2021 – 2023, U1 BEING SHUT - DOWN IN 2024;
ESTIMATED VALUE FOR U2 REFURBISHMENT: 1,2 BILLION EURO ;
MAJOR CAPEX IS EXPECTED TO OCCUR BETWEEN 2033 – 2035, U2 BEING SHUT - DOWN IN 2036.
OCCUR THROUGH THE ENTIRE PERIOD
ANALYZED;
MAIN PROJECTS :
• HEAVY WATER DETRITIATION
STATION;
• INVESTMENTS FOR INCREASING THE
NUCLEA R SAFETY OF CERNAVODA
NPP (POST - FUKUSHIMA
INVESTMENTS);
• INTERMEDIATE SPENT FUEL DRY
STORAGE;
TOTAL VALUE OF THE INVESTMENTS
APPROX 457 MIL EURO .
CONSTRUCTION OF UNITS 3 & 4 REFURBISHMENT OF U NITS 1 & 2 OTHER INVESTMENTS
2017 20 23 2030 2038
TIMELINE
CONSTRUCTION OF UNITS 3 & 4
PREPARATION OF U1 REFURBISHM ENT
OTHER INVESTMENTS
20 24 20 16
SHUTDOWN OF U1
36 20
SHUTDOWN OF U2
PREPARATION OF U2 REFURBISHM ENT
20 26
THE DETAILED EVALUATION (STRESS TEST) PERFORMED AT CERNAVODA
PROVES THAT BOTH CERNAVODA NPP UNITS MEET THE NUCLEAR SAFETY
REQUIREMENTS UNDER THE PROJECT WHILE HAVING SUFFICIENT DESIGN
MARGINS AGAINST SEVERE EARTHQUAKE AND FLOODING, STATION BLACK-
OUT, AND LOSS OF ULTIMATE HEAT SINK;
NEW WAYS TO RESPOND TO SEVERE ACCIDENTS HAVE BEEN IDENTIFIED AND
PROCEDURED (SAMG);
DESIGN MODIFICATIONS TO PREVENT AND LIMIT SEVERE ACCIDENTS
AFTERMATH THAT CAN LEAD TO CORE MELTDOWN HAVE BEEN IDENTIFIED,
AMONG WHICH WE MENTION:
ADDITIONAL FIRE WATER SYSTEM IN THE REACTOR VESSEL AND SPENT
FUEL BAY;
ADDITIONAL WATER SUPPLY SYSTEM AND OVERPRESSURE PROTECTION
SYSTEM IN THE REACTOR VAULT;
ENVIRONMENTAL QUALIFICATION OF CERTAIN MEASUREMENT AND
CONTROL LOOPS;
CAPACITY INCREASE AND SEISMIC QUALIFICATION OF CLASS I/ II
BATTERIES, ETC. 24
OVERVIEW ON FINAL STRESS TEST REPORTS
25
IMPLEMENTATION OF UNIT 1 & UNIT 2 EMERGENCY FILTERED
CONTAINMENT VENTING SYSTEMS;
INSTALLATION OF UNIT 1 & UNIT 2 PASSIVE AUTOCATALYTHIC
RECOMBINERS (PAR’s) SYSTEMS FOR HYDROGEN RISK MITIGATION;
INSTALLATION OF A HIDROGEN MONITORING SYSTEM FOR
CONTAINMENT’S ATMOSPHERE (HERMETIS).
ALL THESE IMPROVEMENTS HAVE BEEN ALREADY IMPLEMENTED.
ALSO, A NUMBER OF ADDITIONAL ACTIONS HAVE BEEN DEVELOPED FOR
IMPROVING THE POWER PLANT RESPONSE CAPABILITY IN CASE OF STATION
BLACK-OUT (ADDITIONAL MOBILE DIESEL GENERATORS & MOTOPUMPS), AND
HAVE BEEN ALREADY IMPLEMENTED. TOTAL COST FOR ALL THAT
IMPROVEMENTS WAS CLOSE TO 60 M EUR.
WANO SIGNIFICANT OPERATING EXPERIENCE REPORTS (SOER) ISSUED IN 2011
AND 2013 WERE OF PARTICULAR IMPORTANCE FOR CERNAVODA NPP IN
IMPLEMENTING EMERGENCY AND ACCIDENT RESPONSE STRATEGIES FOR AN
EXTREME EXTERNAL EVENT.
NUCLEAR ENERGY IS PART OF THE NATIONAL AND EUROPEAN ENERGY
POLICY, IN TERMS OF THE THREE PILLARS:
– AN IMPORTANT SOURCE OF CLEAN ENERGY/ LOW POLLUTION; – MAJOR CONTRIBUTION TO THE SECURITY OF ENERGY SUPPLY; – COMPETITIVE SOURCE OF ELECTRICITY AND CONTRIBUTOR TO THE PREDICTABILITY
OF THE ELECTRICITY PRICE.
FEASIBLE, SAFE AND STABLE BASE LOAD SOURCE OF ELECTRICITY;
LONG DURATION OF OPERATIONS/ LIFE EXTENION (> 50 – 60 YEARS);
IMPORTANT SOURCE FOR PROGRESS AND HIGH TECHNOLOGY AT NATIONAL
LEVEL;
SPREADING MODERN BUSINESS APPROACH AND SAFETY CULTURE TO THE
HORIZONTAL SUPPLY CHAIN OF THE NATIONAL INDUSTRY;
POSITIVE EFFECTS OVER THE NATIONAL INDUSTRIAL INFRASTRUCTURE
FROM FURTHER DEVELOPMENT OF NUCLEAR ENERGY (NUCLEAR FUEL,
DESIGN-ENGINEERING, EQUIPMENT AND COMPONENTS FABRICATION,
CONSTRUCTION-ERECTION, USE OF UNITS 1 & 2 OPERATIONAL EXPERIENCE,
ETC).
BENEFITS OF NUCLEAR ENERGY
SOCIAL & ECONOMICAL IMPACT AT NATIONAL SCALE
26