PQR System User Guide
Polaris Supply Chain – Supplier Training Module
Revised: June 15, 2016
Revision Number: 1Polaris CONFIDENTIAL
2
Welcome
User Guide for PQR SystemPolaris CONFIDENTIAL
Welcome to the PQR System User Guide Polaris Supplier Training Module.
This training is part of the Polaris Supplier Training program developed to
ensure our supply base has the fundamentals to a valued partnership with
Polaris.
This module will allow you to better understand the requirements, expectations
and process for utilizing the Part Qualification Request (PQR) system when
providing Polaris with your PPAP documentation.
If you have questions, please contact your purchasing or quality representative.
For specific training and requirements of Polaris PPAP submissions, please
reference Production Part Approval Process Training
Critical Process Steps:
Process Usage:
3
Process Overview
System supporting PPAP submissionsPolaris CONFIDENTIAL
PQR Generated by Polaris w/
Requirements Outlined
Supplier Notified via Email of PQR
generation
Supplier Fulfills PQR
Requirements
Polaris measures sample and reviews data
Polaris dispositions the
PQR
Once approved, supplier may ship
product
P
P
A
P
Supplier
QualificationPDP
EOL
Safe Launch
Supplier Performance
Product
Assurance
ControlMonitoring Improvement
APQPQuality Event
ResolutionSupplier On-
Boarding
………….Serial
Production…….………MaturityVolume Ramp….SOP PPAP…..APQP……
SupplierSelection
The Quality Lifecycle Management process is a
process to ensure product quality assurance.
The Polaris PQR Form
Important PQR
dates, both due and
received
submissions are
noted here
Overview of the PQR
details including
PQR #, Part #,
Supplier & Buyer
Polaris site QE
assigned to define
the requirements
and review the
submissions
Running PQR history
Supplier comments related to the PQR
submission (completed by the supplier)
Submission requirements as defined by the site QE
based on mitigating risk and ensuring design intent.
One or more items may be selected and are due from
the supplier prior to the due date indicated here.
Polaris comments related to the PQR, additional detail, submission
approved, submission rejected noting reasons for rejection, etc.
FAIR and PPAP Requirements (dual dates)
Proprietary 5
Typically used for engineering
samples (PV, PI, etc.) and
Production Tooling Approval.
Product run on Production Tooling
but not run at rate and/or by
production procedures.
Evidence that all customer Design Record
requirements are properly understood and
that the manufacturing process
(encompassing the entire production
process – production tooling, gaging,
process, materials, and operators) has the
potential to produce product consistently
meeting these requirements during an
actual significant production run at the
quoted production rate.
Sample Part and Required Documentation Submission
Proprietary 6
Per the SQAM please place the
shipment method of your sample
part and tracking number here
(this will help if your sample
submission is lost)
Send all data electronically (in
.xls, .pdf, .tif or .doc format)
via the e-mail link of the
appropriate Quality Engineer
listed in the PQR system.
Please note in the Supplier Issues section the date
electronic documents were submitted, method, and to
whom. If documented here and submitted correctly the
accountability is now with Polaris.
Also used to communicate through the PQR system –
‘Request a Conditional Approval*’, ‘Request a Due Date
Adjustment**’, and all formal requests
Hard copies may
accompany submitted
samples but electronic
copies must be sent for
PQR submissions to the link
above
• * When requesting Conditional Approval provide a brief explanation and a Conditional Approval end date
• ** Same as above when requesting an adjusted Due Date
Polaris Comments Section of the PQR
Proprietary 7
rec’d = Received
lvl 4 = Level 4 (referring to PPAP level)
s/b = Should Be referring to the design record requirement (print)
is = The actual measurement
bal = Supplier balloon print number associated with the feature
sub = Submit or submitted
req = Requirements
NCR = Non-Conformance Report
The Comments section of the PQR has a limit to the number of characters we can
use when addressing the submission. We want to communicate as much as we
can in our responses and because of this we often abbreviate our responses. We
thought it might be helpful to explain some of these abbreviations…
Data Compression for Submission
Proprietary 8
Electronic PQR submissions can be quite large. In
order to submit the documents via email to the
appropriate QA please compress by using PDF or ZIP
Note:
Regarding zip files in order for zipped files
to pass through the Polaris firewall the
name Polaris must be in the file name
PQR Performance Rating
Proprietary 9
Supplier Performance –
QualityPolicy Statement: Quality will have a
30% weight toward the overall GPA in
2012. PPM Performance will make up
20% of the Quality Performance. PQR
(Part Qualification Request)
Performance will make up 10% of the
Quality Performance
PQR Received Status
Proprietary 10
PQRs aren’t received until both electronic
submissions AND sample parts are received by QA.
Once received, the received date will display here.
PQR Received Status (Cont)
Proprietary 11
Received Status (both
electronic and sample) can
also be found hereUpper location is received in system,
lower location are received notes
Important note: If Polaris indicates
the data & sample are received and the
supplier or Polaris makes changes (any
change involving submit) the PQR
received status will be removed.
FAQ
If a supplier submits the PQR on the due date and Polaris does not select received
on that day, will the supplier get penalized?
It must be flagged as at least received within the calendar month that it is due PQRs are expected to be submitted prior to the due date on the PQR.
When there are two due dates in the system (for example 1 for a FAIR and 1 for a
PPAP) and we receive the FAIR data on time, does the due date automatically move
out to the later due date once the first on has passed?
Each requirement date is viewed independently however a PQR is only counted once in a given month. For example if the FAIR is due in December and the PPAP in January. The FAIR is approved in December. It counts positively for the supplier in December. The metric does not look at the PPAP date until January.
Confirming the time stamp for calculating “on time” PQRs based off checking
“received”, correct?
Suppliers should try to make sure their submission reaches the plant at least 48 hrs prior to the due date to allow for it to be processed by plant QA. Plant QA should at least flag it as received within 48 hrs of its arrival at the plant.
If a supplier submits a late PQR (and they get dinged) and we conditionally approve
the PQR submission when received a new date is set for the conditional approval –
will the supplier get dinged again for being late to the conditional approval date?
If a PPAP is due in December and the supplier has not submitted it by December 31st, they would get dinged. If we came back in January and conditionally approved the PPAP to be due in January and by January 31st we had not received the resubmission the supplier would have received two hits. One for December and one for January.
Proprietary 12
FAQ (cont.)
Why will Polaris not accept hard copies of submission data in lieu of
electronic data?
Hard copies cannot be entered into our system and thus viewed by the many people who need access to the data
Electronic submissions can also be traced verifying date of submission
Why does data need to be submitted in .xls, .pdf, .tif or .doc format?
Data must be submitted in acceptable formats which Polaris can open conveniently
When submitted data to the appropriate QE per the PQR request should
anyone else within Polaris be copied?
It is a good idea to copy the Purchasing Agent and the SQE on submissions
Who approves PQRs and what limits do they have?
Polaris QEs are responsible for final approval of PQRs (in MTY SQEs approval PQRs)
Polaris QEs are not authorized (alone) to make decisions outside of the Design Record for non-compliant submissions unless supported by an approved DCR or Deviation
Proprietary 13
FAQ (cont.)
What if multiple revisions exist in the PQR system for the same P/N?
Previous revision requirements can be moved forward to the latest PQR upon supplier request
This is not done automatically and subject to certain conditions
Examples:If the earlier revision has never been purchased the earlier PQR can be retractedIf the elements of the next revision has earlier been met the later PQR can be retracted or approved
Earlier PQR included an approved DCR
The PQR may be a SCARIt may be a supplier change PQR
Other examples/conditions may exist. Please contact the QE listed on the PQR
What if the due date on the PQR cannot be met?
DO NOT ignore the PQR – your metrics will be negatively affected
Notify the QE through the PQR as noted earlier PRIOR to the PQR due date and provide a reason
What if I receive a Conditional Approval and the Req Date on the PQR does
not match the Conditional Approval date?
The QE should move the Req Date out to match the Conditional Approval date. It is a manual process so if the QE failed to adjust the date please contact the QE and request the date be changed. Do this to avoid a negative metric for being late.
Proprietary 14
FAQ (cont.)
How important is the PPAP/FAIR sample label and sample submission information in the Supplier Information section of the PQR?
Polaris has many locations and departments. Unless the samples are routed correctly with the correct information the submitted samples can be delayed or even lost
Providing the Shipper Name, Tracking Number and when shipped in the Supplier Information section of the PQR allows for:
Tracking if deliveries are lost or delayed
Provides evidence that the supplier complied with the request – on time
How will I know if the sample part ship location been changed?Always check the Quality Engineer section of the PQR under Ship To: (4th panel right side)
Why must I ship a sample part for a FAIR submission and why must it be made from production tooling?
FAIRs are used for tooling approval. Unless submitted parts are made from production intent tooling the production tooling cannot be verified.
Notify the QE through the PQR as noted earlier PRIOR to the PQR due date
What happens to submitted samples after auditing at Polaris?Samples are scrapped after approval
Sometimes samples may be used for destructive testing and could be destroyed in the process
Proprietary 15
16
Thank you!
Thank You!Polaris CONFIDENTIAL
Thank you for attending to the PQR System User Guide Polaris Supplier
Training Module.
This training is part of the Polaris Supplier Training program developed to
ensure our supply base has the fundamentals to a valued partnership with
Polaris.
If you have questions, please contact your purchasing and/or quality
representative.