Power to PerformHoneywell Users Group 2008Power to Perform

Honeywell Users Group 2008

Marjorie OchsnerSenthil Balasundaram

Non-Honeywell System Migration to Experion

Page 2: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

2

Agenda

• Justifying a Modernization• Upfront Planning and

Assessment• HMI Migration Solutions• Controller Migration Solutions• Wrap up and General

Recommendations

Page 3: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

3

Why Migrate?Migration Justification = Cost of Doing Nothing + Increased Benefits

Improve Safety, Reliability and Efficiency

Page 4: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

4

Cost of Doing NothingDecreased Reliability causes Unplanned Shutdown

PROVOX system caused 3 unplanned shutdowns in 1 year-Petrobras

High Maintenance Cost due to Parts obsolescence, High Cost of Spares

“SKC had various issues with the service provided by Emerson since our old RS3 system was archaic and the price of spare parts was not realistic,” said Hyun Cho, General Manager, SKC Chemicals.

Inadequate Response Experion alarm system identifies process conditions that the Moore system was too slow to capture – HSM Metropolis

Page 5: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

5

Benefits of Moving from Stagnant Technology

Migration to Experion =Increased Revenue, Increased Production, Lower Cost

Operator Effectiveness Irving Oil - 45% decrease Daily Alarm Rate

Abnormal Situation Management

Sasol - $500,000 saved by increased situational awareness and improved consistent operation

Better Process Control Konya Sugar – 17 % Increase in Quality

Integrated Safety “Honeywell… supported IRPC to continuously benefit from overall improved operations..”Sompas Samnianglam, Instrument Section Manager, IRPC

Page 6: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

6

Agenda

• Justifying a Modernization• Upfront Planning and

Assessment• HMI Migration Solutions• Controller Migration

Solutions• Wrap up and General

Recommendations

Page 7: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

7

Upfront System Assessment• Current Situation – Front End Engineering and Design

– Budgeting and justification• Constraints

– Hot cutover requirements– Turn around scheduling– Phased Approaches– Existing Instrumentation

• Goals– Increased safety– Operational improvements– Business improvements

• Financing options are available• Strawman plan based on constraints and goals

"Honeywell helped us develop a plan to migrate our product and supplied both the justification and economic benefit analysis for us to do so,”- RVA

Page 8: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

8

Benefits of Front End Engineering & Design

• Reduction in Project Risk • Design Consistency • Project Cost Savings • Operational Readiness • Business Readiness • Lifecycle Sustainability

Page 9: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

9

Global 3rd Party Migration Experience

Fisher PROVOX

***

**

*

**

*

Foxboro IA, Spectrum, Spec 200

*** **** *

*

Yokogawa Centum XL, CS

** *

* **

Rosemount RS/3, RMV 9000

***

*

*

*

Hartman & Braun Contronics, Freelance

*

**

*

Siemens Teleperm M, Moore APACS

*

*******

*

Rockwell Process Logix

** ** **Bailey

* * ***** * *

*

Page 10: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

10

Migration Options

Page 11: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

11

Risk and Benefit Profile

CostProject

Risk Benefit

Extend Life x Very Low Low

IncrementalUpgrades

5x Low Significant

Rip andReplace

30x High Significant

Opt

ion

Page 12: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

12

Investment Protection

CostProject

Risk Benefit

Extend Life x Very Low Low

IncrementalUpgrades

5x Low Significant

Rip andReplace

30x High Significant

Opt

ion

Extend Life Not Available for Many Systems

Page 13: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

13

Agenda

• Justifying a Modernization• Upfront Planning and

Assessment• HMI Migration Solutions• Controller Migration

Solutions• Wrap up and General

Recommendations

Page 14: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

14

Why Honeywell HMI Migration?

Transition To Experion, Minimize Risk

Page 15: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

15

Which Systems and When

• Legacy Network, Controller and I/O still supported• Used to Transition to Central Control Room in conjunction

with System Expansions• Intermediate step for Controller Migration• Successful in Bailey, PROVOX, Foxboro IA, Moore APACS,

Siemens Teleperm M, RMV, Process Logix

Transition to Experion

“We needed a solution that would improve process performance while still leveraging our investment in the Bailey controllers.” - Alexandre Gershberg, Head of Instrumentation and DCS, Kirishi Refinery.

Page 16: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

16

Bailey HMI Migration Success

• Zero production down-time • Higher uptime• Increased productivity• Faster, more effective decision making • Greater flexibility• Improved safety • Investment protection• Seamless integration• Ease of use• Improved throughput

Wintershall - Netherlands

We are very happy with the results, and with the passage of time and further integration efforts we expect to realize more and more benefits such as time efficiency, increased platform performance and reliability, ease of maintenance and cost reduction… - Hans Reijn, Facility Engineer, Wintershall”

Page 17: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

17

Robust Infrastructure - BaileyServer

Primary OPCServer

Backup OPCServer

Redundant Redundant Experion ServersExperion Servers

Robust Networks Robust Networks (FTE)(FTE)

Dual Active Dual Active RovisysRovisys Servers Servers

managed by managed by Redirection Redirection

Manger (RDM)Manger (RDM)

Dual SCSI Dual SCSI AdaptersAdapters

Dedicated SCSI Dedicated SCSI channelschannels

Multiple Multiple CIUCIU’’ssSupportedSupported

Page 18: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

18

Robust Infrastructure - PROVOXServer

Primary DataCollector

Backup DataCollector

Redundant Client Redundant Client Interfaces to Data Interfaces to Data

CollectorsCollectorsRedundant Redundant

Networks (FTE)Networks (FTE)

Dual Active Data Dual Active Data Servers Servers

Supported for Supported for seamless failoverseamless failover

ControllerIFC SRX

IFC-TRN

ControllerIFC SR90

`IFC-REV2

LocalTraffic

DirectorHighway

Data Links

2-13

HighwayData Links

2-14

Page 19: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

19

Transition to Experion

Parameter Mapping

TiPS OPC Parameter Data Type Access Description

IVP Real Read/Write Output Value

MODE Integer Read/Write Mode

QUESTDATA Boolean Read Questionable Data - Failure in PROVOX data

DDP

DDPPollTime Real Read/Write DDP poll time in seconds

EU 0% Real Read/Write Engineering Units 0%

EU 100% Real Read/Write Engineering Units 100%

FAILSAFE AO Real Read Only

OFCC0 Real Read Only Output File Card Channel - AO

INC CLO? Real Read/Write Increase Open, Increase Close

REM OFS? Real Read/Write Remote Out of Service

RESCATTR Real Read/Write Resource attribute

3rd Party Point Experion

Page 20: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

20

Efficient Database Conversion

SCADA points are created in QB, once it is copied from excel to QB

Database is analyzed and equivalent SCADA point

is generated

Page 21: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

21

Efficient PROVOX Database Conversion

Page 22: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

22

Efficient Bailey Database Conversion

Page 23: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

23

Transition to Experion

Bailey Detail Display

Page 24: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

24

PROVOX Detail Display

Transition to Experion

Page 25: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

25

Bailey Faceplates

Transition to Experion

Page 26: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

26

PROVOX Faceplates

Transition to Experion

Page 27: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

27

Graphics Improvement

Page 28: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

28

Agenda

• Justifying a Modernization• Upfront Planning and

Assessment• HMI Migration Solutions• Controller Migration

Solutions• Wrap up and General

Recommendations

Page 29: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

29

Why Honeywell Controller Migration?

Page 30: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

30

Which Systems and When

• Aging systems with poor or no support of legacy controller and I/O• Typically phased in or used in conjunction with HMI migration• Front end engineering and design are keys to success• Experienced with many systems including Bailey, PROVOX, Foxboro

IA, Spectrum, Spec 200, Moore APACS, Siemens Teleperm M, RS3, Hartman & Braun, Yokogawa, GSE, etc…

““We felt that we were at a dead end and needed a system that could grow with us and provide a clear migration path,” said Stacey Miller, Applications Engineer, USA Yeast

Page 31: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

31

Rosemont RS3 & Siemens PLC S5 Success

• Increased safety, reliability and maximum operability with integrated Safety Manager solution

• Improved ability to gather and share business-critical information

“Honeywell’s best-in-class technology and elite team of experts have supported IRPC to continuously benefit from overall improved operations. This seamlessly delivered Experion R300 platform integrated with Safety Manager is proving to be highly reliable.”Sompas Samnianglam, Instrument Section Manager, IRPC

IRPC Rayong, Thailand

Page 32: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

32

• PROVOX Series 10, Series 20• Bailey Infi90, NET90• GSE Quantum• Yokogawa• All Others Require Approval

Migration Kits Save Time and Money

Rewiring Tasks Using Migration Kits

• Disconnect old terminations• Remove old Bailey field termination unit (FTU)• Install new Series C I/O • Rewire

• Install migration kits and new Series C I/O• Connect cablesSave about 75% on labor

Page 33: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

33

Efficient Conversion of PROVOX Strategy

Page 34: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

34

Opportunity to Improve Process Control

Bailey Predictive ControlProfit Loop Solution

Page 35: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

35

Access HART

• Many plants have existing HART devices connected to Network 90 or Infi 90 as an Analog Input/Output

• Migration kit connection to Series C HART I/O reveals HART information

• Enables maintenance, operations and process improvements

Page 36: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

36

Leverage Upgraded Infrastructure

Page 37: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

37

PROVOX Wiring Kit Use Success

• Experienced several days of unscheduled lost production due to 3 separate DCS failure

• Used wiring migration kit to get on line in less than 24 hours

“The teamwork displayed by the Honeywell Process Solutions group and

our local team made the Experion installation a very successful project,

and allowed our facility to start up slightly ahead of schedule.”

—Ron Snell, Operations Manager

Honeywell Specialty Material – Geismar, LA

Page 38: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

38

Agenda

• Justifying a Modernization

• Upfront Planning and Assessment

• HMI Migration Solutions• Controller Migration

Solutions• Wrap up and General

Recommendations

Page 39: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

39

Recommendation #1: Front End Engineering & Design

• Reduction in Project Risk • Design Consistency • Project Cost Savings • Operational Readiness • Business Readiness • Lifecycle Sustainability

Page 40: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

40

CostProject

Risk

Enables New

Benefit Capture

Extend Life x Very Low Very Low

Incremental Upgrades 5x Low Significant

Rip and Replace 30x High Significant

Opt

ions

Recommendation #2: Incremental Upgrades When Possible

Life Extension Not Usually an Option; Minimize Risk

Page 41: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

41

Recommendation #3: Improve Operator Effectiveness

Be Aware of Changing Operator’s Role when Migrating

Reliability

Improved Throughput

and Operator Productivity

EfficiencySafety

Reduced Incidents

Effective Alarm System

Page 42: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

42

Recommendation #4: Leverage Upgraded Infrastructure

Page 43: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

43

Recommendation #5: Develop Long Term Automation Plan

Lifecycle Management

Improve Process Automation Lifecycle

Implement

Maintain

Plan

Upgrade

LCM

Page 44: Power to Perform Honeywell Users Group 2008 Power to ...€¦ · Senthil Balasundaram Non-Honeywell System Migration to Experion. 2 Agenda • Justifying a Modernization • Upfront

44

Why Honeywell

• Experienced Engineering and Design

• Improve Process Control

• Improve Operator Effectiveness

• Leverage Increase Scope of Automation

• Long Term Automation Commitment Supports On-going Incremental Upgrades

Improve Your

Business Performance