26
POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T TELECOMMUNICATION www.layerfiveltd.com info@layerfiveltd.com +234 (0) 803 809 9423

POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T TELECOMMUNICATION

www.layerfiveltd.com [email protected] +234 (0) 803 809 9423

Page 2: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

We are the people who provide innovative solutions to industrial sectors, enabling them to achieve greater efficiencies and ultimately increase their profitability.

LAYERFIVE is a multi-disciplined engineering installation and maintenance company with extensive experience working on sites throughout Nigeria. We provide services by three distinct means; consultancy, projects and O&M. Our key areas of expertise include Power Solution,

I n s t r u m e n t a t i o n , I C T, C o n t r o l s y s t e m a n d Telecommunication. We work with clients in a broad range of sectors, each with specialist requirements,

including Oil & Gas, food processing, Cement, Telecommunication, Energy Generation, Power Distribution and research and development. In

every single project, we undertake, we are dedicated to providing our clients with quality, result and peace of mind. We also have a real commitment to sustainability in all areas of our operations

01

Introducing Introducing LAYERFIVE

R

Authorised Distributor

Page 3: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

Our

Com

pany

Cul

ture t we partner with our clients

ALAYERFIVE

to provide superior quality solutions that deliver - or exceed - the results they are

seeking and give them peace of mind that their operations are running smoothly. We have a reputation for innovation and a proven track record for success, having completed numerous industrial projects, nationally, on spec, on time and on budget. Health and safety is more than just a mantra at ; it is a LAYERFIVEdriving force behind every element of our business operation. In 2018 we were proud to achieve an industrial safety record, with zero lost time incidents for over 300,000 operating hours. We have a genuine commitment to conserving the natural environment, where we are recognised as leaders in our field. We also work closely with our local community, donating to charitable organisations, and geared towards implementing electrical safety education programmes in schools.

02

Page 4: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

Electrical Engineering• Power distribution: LV, MV

and HV• Portable switch rooms

site-wide distributed PLC controllers and distributed control system (DCS)

• Networking: Ethernet, �bre, serial, CAN bus, wireless, PROFIBUS, ControlNet, DeviceNet and Modbus

• Database and Reporting

I.C.T

Telecommunication

LAYERFIVE provides a complete range ofengineering services for industrial operations.We specialize in the following areas

Engineering Expertise

• Surveillance solution • Structural cabling (LAN, etc.) • Access control solution • Custom application

developmentCommunication system (telephone, radio, etc.)

• RF/Microwave radio installation • Fiber optic deployment • TVRO system installation • Turnkey site works

Project management

Earthing and lightning protection system Electrical construction workMechanical construction workTesting and commissioning

• •

Instrumentation• Installation of instruments• Pre calibration setup of

instruments• Accredited calibration of

instruments• F & G System

Instrument construction work

Renewable Energy Solution Solar systems design, engineering & consultancyProject planning & managementSimultation of solar photovoltaic systemTraining & capacity buildingEnergy auditing & management (EAM)Strategic panning of hybridenergy systems.Sales & marketing of reputablealternative energy products

• •

• •

Control Systems Automation Customer interface: PC- based HMI and Industrial HMI

• PLC hardware: small controllers, standalone PLC,

04•

Page 5: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

03

Page 6: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

Design Services:• Area classiication or ‘zoning’

• Equipment selection and installation design

• Entity calculations for intrinsically safe equipment

Installation Services:• Installation of ield devices

• Installation and programming of isolating barriers

• Installation of suitable cables and cable glands

• Installation of suitable isolation and identiication devices

Inspection and Documentation Services:• Initial inspection of newly installed equipment

• Compilation of hazardous area equipment dossiers

• Development of periodic inspection schedules

• Implementation of detailed, close and visual periodic inspections

POWER SOLUTIONElectrical equipment can pose a signi�cant explosive risk in many industrial operating environments. Ensuring safe operations in these areas requires speci�c construction and installation techniques, along with the rigorous application of a complete suite of standards.

LAYERFIVE offers a comprehensive range of design, installation, inspection and documentation services for electrical equipment utilised in hazardous areas.

NESISAll members of our Hazardous Area team have achieved competency in NESIS Regulations and have completed recognised, accredited unit standards in their areas of expertise.

We have significant experience in working on both gas and dust hazardous area equipment associated with fuel oils, fuel gases, coal dusts, milk powder, paint spray booths and chemical processing and storage.

05

Page 7: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

POWERSOLUTION Electrical engineering is a crucial part of any engineering project.

Our capabilities include:

Power supply and control systems• Co-Generation, standby and stand-alone generation,

including solar power systems.

• MV and LV power supply and distribution systems, with or without multiple points of supply, RMU’s, and of-grid systems

• Distribution and motor control centres (MCCs), including pre-built and pre-tested transportable options

• Motor control systems, including variable speed drives, soft starters and their associated metering and protection equipment

• Harmonic mitigation and elimination systems for plants with large percentages of VSD and switch-mode power supply loading, such as data centres Management of the working environment

Management of the working environment• Building services including heating, ventilation and air

conditioning supply control and monitoring systems, including control instrumentation

• Refrigeration systems, including electrical supply, control and monitoring systems including control instrumentation

• Lighting design to meet IEEE requirements for public and work areas.

• Hazardous area electrical design, installation, commissioning, testing and inspection

• Electrical equipment in damp and chemically loaded areas

LAYERFIVE offers full suite of electrical engineering capabilities to manage project from conceptual designand speci�cation through to detailed design for installationand �nal installation testing, certi�cation and inspection.

Energy efficiency systems for new builds and for retrofitting or upgrading existing plant

06

Page 8: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

INSTRUMENTATION

Unit

Emergency Communication System

(SATCOM, VSAT, PAGA, CCTV, Microwave

Radios, Fiber Optics)

Industrial IT Systems (WAN, LAN, Fiber Optic

Networks)

Fire & Gas Detection, Sensors and

Suppression Systems like FM200, FE 13,

Inergen, CO2 & the like

Engineering and Supply of Instrument

Cables

Field Instrumentation (Installation, Calibration,

Loop Checking and Commissioning)

Calibration and Certication of Control Valves,

Relief Valves and Field Instruments

Mobile Instrument Calibration and Certication

We have built our Instrumentation capabilities to take on any critical task that you have...

Control Valves, SDVs, BDVs, Manual Valves, Actuators, Solenoid Valves, Limit Switches and other Control Components

Pressure/ Vacuum Relief Valves

Pressure, Flow, Level, and Temperature

instruments

E&I Bulk Materials

Whether your requirement is small or big,

we are there to supply the products that get

you the best results. We have the expertise to help with the following requirements.

07

Page 9: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

8

We have capabilities and experience in a wide range of industrial automation systems, including:

System Types• Small Controllers• Stand Alone PLC• Site-Wide Distributed PLC

Controllers• Distributed Control System (DCS)• Integrated Safety Systems• Integrated Vision Systems

System Integrators• Rockwell• Omron• Omron Safety• Schneider• Wonderware

Other Systems• Siemens• GE• ABB• Honeywell• Red Lion• SICK• AuCom• Mitsubishi• Toshiba• OPC Systems• Microsoft Visual Studio• Unitronics• Industrial PCs

Networking• Ethernet• Fibre• Serial• CAN Bus• Wireless• PROFIBUS• ControlNet• DeviceNet• Modbus• DH+• Rio• Ethercat

CONTROL SYSTEM

08

Page 10: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

· RF/Microwave Radio Installa�on ·

Transmission Services: Microwave LOS Survey, Transmission Planning and Op�miza�on, Fiber Op�cs Installa�on and Management

· Installa�on Services: BTS Equipment room survey, BTS/RF Installation Quality check, Single Site Verifica�on.

·

Equipment Leasing

·

Turnkey site works

·

Project Management

At layerve, we offer wide range of services in the telecommunication industry. We gladly offer quality and cost effective services in the following areas:

TELECOMMUNICATION

09

Page 11: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

Professional Services I.C.TAt ICT services are a core LAYER FIVE,aspect of our operation. We offer well-tailored services in the following areas:

Structural cabling (LAN, etc.) /Networking · Structured cabling, from Category 5

enhanced through to Cat-7E· Op�cal fiber cabling, single mode

and mul�mode applica�ons and Tes�ng

· Network devices, switches, routers etc

· Telephone systems (including IP telephony).

· Wireless systems. · Data center design, construc�on

and maintenance

· Custom applica�on development / IT Support

· Hardware Repairs · So�ware Development · Website Development · Cable TV Design and installa�on for

marine and other sector · Consul�ng

Surveillance solu�on Access control solu�on Communica�on system (telephone, radio, etc.)

10

Page 12: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

11

Page 13: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

17.5MW NEW POWER PLANTInstallation of 5 Units of 3.5MW Jenbacher Gas EnginesInstallation of SecoGear MV PanelsInstallation of LV PanelInstallation of generator Auxiliary Panel and ST4 Panel Installation of 2 units of 1250Kva TransformerInstallation of Cooler FansInstallation of Louver FansCable Tray/ Cable Tray Support Fabrication and InstallationMV Cable TerminationPre-commissioning ChecksCommissioning

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

INSTALLATION OF 20MW VFD DRIVE FOR TRAIN 3Installation of two units of 8MW VFD driveInstallation of 4MW VFD driveInstallation of MV PanelsInstallation of LV PanelInstallation of 2 units of 4MW transformerCompressor MV Cable terminationMV Cable Termination at Panel EndCable Tray Fabrication and InstallationVFD building Lighting installation workMV, LV and Control system Cable pullTransformer TestInstallation of cooler FansInstallation of Earthing and Lightning protection systemInstallation of cooler FansPre-commissioning Checks

1. 2.

SOME EXECUTED PROJECTS

12

Page 14: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

3. 4.INTEGRATION OF JONES CREEKDesign of Jones creek Control SystemFabrication of PLC Control PanelInternal Wiring of the PLC Control PanelPLC programmingDevelopment of SCADA FATOnsite HookupSATPre-commissioningCommissioning

FIRE DETECTION AND ALARM SYSTEM AT UERL/SINOPECDesign of Fire Detection and Alarm SystemInstallation of Smoke DetectorsInstallation of Heat DetectorInstallation of MCPInstallation of Sounders/ Sounder asherInstallation of F&G panelConguration of F&G panelPre-commissioningCommissioning

13

Page 15: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

5. 7.SOKU FLOW STATION UPGRADE

Installation of Push Buttons on SIS system Internal Wiring of PAS, HIPPS and SIS panel Replacement of HMI Panel Commissioning Support.

6. LIGHTNING PROTECTION AND EARTHING WORK

Installation of Earth Rod Installation Earth Inspection Chamber Installation of Earth BusbarEarth Cable Pull and Termination Earthing of all Electrical Motors, Transformer and I&C Panel Installation of 30M mast Installation of indelec Lighting Protection System. Earth Resistance Test and Reporting

ON

GO

ING

RE-GASIFICATION PLANT- ROM OIL MILL IBADANInstallation of TT, PT, PDT, PG TG and Safety Valves.Calibration of TT, PT, PDT, PG, PG and Safety ValvesProcurement and Installation of EX Perimeter LightE&I Material ProcurementLV Electrical and Instrument Cable Pull, Glanding and TerminationCable Tray and Instrument support Fabrication and InstallationLightning Protection system installationPre-commissioning and commissioning

14

Page 16: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

8. 9.RE-GASIFICATION PLANT- KAM INDUSTRY- ILORINInstallation of TT, PT, PDT, PG TG and Safety Valves.Calibration of TT,PT,PDT,PG,PG and Safety ValvesProcurement and Installation of EX Perimeter LightE&I Material ProcurementLV Electrical and Instrument Cable Pull, Glanding and TerminationCable Tray and Instrument support Fabrication and InstallationLightning Protection system installationPre-commissioning and commissioning

RE-GASIFICATION PLANT- DUFIL PRIME FOODS PLC Installation of TT, PT, PDT, PG TG and Safety Valves.Calibration of TT,PT,PDT,PG,PG and Safety ValvesProcurement and Installation of EX Perimeter LightE&I Material ProcurementLV Electrical and Instrument Cable Pull, Glanding and TerminationCable Tray and Instrument support Fabrication and InstallationEarthing and Lightning Protection system installationPre-commissioning and commissioning

15

Page 17: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

10. 11.RE-GASIFICATION PLANT- INNER GALAXY -ABAInstallation of TT, PT, PDT, PG TG and Safety Valves.Calibration of TT,PT,PDT,PG,PG and Safety ValvesProcurement and Installation of EX Perimeter LightE&I Material ProcurementLV Electrical and Instrument Cable Pull, Glanding and TerminationCable Tray and Instrument support Fabrication and InstallationLightning Protection system installationPre-commissioning and commissioning

RE-GASIFICATION PLANT- MAMUDA -KANOInstallation of TT, PT, PDT, PG TG and Safety Valves.Calibration of TT,PT,PDT,PG,PG and Safety ValvesProcurement and Installation of EX Perimeter LightE&I Material ProcurementLV Electrical and Instrument Cable Pull, Glanding and TerminationCable Tray and Instrument support Fabrication and InstallationLightning Protection system installationPre-commissioning and commissioning

16

Page 18: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

S/N PROJECT DETAILS CLIENTS STATUS

ON

GO

ING

12. 14.

13.

CUSTOMIZED WATERCUT MODULE INTEGRATION AT SANTA BARBARAInstrument Cable pull, GlandingRetrot of PD meterPD Meter InstallationHookupPre commissioning Commissioning

WATERCUT METER PROJECT- RUMUEKPE FLOW STATIONInstrument Cable pull, GlandingCable Tray fabrication and InstallationWatercut meter InstallationRetrot of PD meterPD Meter InstallationHookupPre commissioning Commissioning

CO

MP

LETE

D

ELECTRICAL AND INSTRUMENTATION COMPLETION WORKS (MECHANICAL REFRIGERATION UNIT)Cable Tray workTransformer InstallationMV Cable TerminationMV Panel Integrity vericationEarthing Integrity vericationValve CalibrationInstrument CalibrationCable Pull, Glanding and terminationVFD CompletionPre-commissioning checksCommissioning

17

Page 19: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

15. 17.BNAG DE-BOTTLENECKING PROJECTMaterial ProcurementInstallation of motor and PumpsInstallation of Valves and ActuatorsInstallation of TransmittersCable Tray and Support fabrication and InstallationTubing WorkGlanding and Termination, PG,LGF&G systemPre commissioning and Commissioning support

TURBINE METER CALIBRATIONCalibration of Turbine Flow meters at Early Production facility (EPF)

CO

MP

LETE

D

AGAR PROBE INSTALLATION WORK-BONNYInstallation of Agar Probe on vessels from Train A-CFabrication and Installation of JB supportInstallation of Ex. JBCable Tray and Cable Tray support FabricationCable Pull, Glanding and termination

LIGHTNING PROTECTION SYSTEM (LPS)WORKLPS coordination studyRe-design of LPS systemImplementation of designed LPS

CO

MP

LETE

D

16.

18.

18

Page 20: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

19. 20.INSTALLATION OF MISSINING INSTRUMENT WORKS IN TRAIN 3Review P&ID Installation of PTInstallation of TTInstallation of LTInstallation of PGInstallation of ValvesInstrument Hook-upCable PullCable Glanding and TerminationPre commissioning ChecksCommissioning support

SURVEILLANCE/ACCESS CONTROL SOLUTION FOR 5KM2 FACILITY INSTALLATION OF POWER JBInstallation of Instrument JBExcavation of TrenchFiber Optic Cable PullElectrical Cable PullSlabing and Backlling Glanding/Termination/Splicing Cable Integrity VericationInstallation of TurnstilesInstallation of Card ReaderIntegration of Card reader to turnstileIntegration of solution to Visitors Management systemPre-commissioningCommissioning

19

Page 21: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

21. 22.INSTALLATION OF 8MW VFD DRIVE FOR TRAIN 1 &2Installation of 8MW VFD driveInstallation of MV panelsInstallation of LV panelsInstallation of TransformerEarthing system installation and Equipment EarthingTrench ExcavationMV Cable pull 3Cx 300MM2 LV cable PullMV Cable Glanding and TerminationLV Cable Glanding and TerminationF&G system installationInternal Lighting system installationPre-commissioning

EARTHING/LIGHTNING PROTECTION SYSTEM AT PORT HARCOURT, ABA AND ENUGU TRANSMISSION STATIONS.installation of Earth RodEarth Grid SetupEarthing of Transmission equipmentInstallation of BusbarInstallation of Indelec air terminal on 70m MastEarth Resistance testDocumentation

20

Page 22: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

S/N PROJECT DETAILS CLIENTS STATUS

CO

MP

LETE

D

23. INSTALLATION OF 1.57 Mwp INKADUNA STATEInstallation of 34 solar off grid system with a total capacity of 1.57 MWp in Kaduna state for primary health care centres across Kaduna state.

MP

Infr

ast

ruct

ure

Nig

eria

INSTALLATION OF 650 KWh Installation of over 650 KWh battery across 15 Banks in Nigeria.

24.

21

Page 23: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

R

Authorised Distributors in Nigeria

OPERATION BASE:28b Flaming Avenue,Rumuomasi,Port Harcourt,Rivers State, Nigeria.

QUICK CONTACT:+234 (0) 803 809 9423+234 (0) 808 237 4451+234 (0) 813 972 2228

EMAIL:[email protected]

WEBSITE:www.layerfiveltd.com

...equipment don't just fail. identify the problem before failure with Thermal Imaging Camera R

22

Page 24: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

Technical Partners

23

Page 25: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

Some of our clients

24

Page 26: POWER SOLUTION INSTRUMENTATION CONTROL SYSTEM I.C.T …layerfiveltd.com/wp-content/uploads/2021/02/Layerfive... · 2021. 2. 9. · Pull, Glanding and Termination Cable Tray and Instrument

OPERATION BASE:28b Flaming Avenue,Rumuomasi,Port Harcourt,Rivers State, Nigeria.

QUICK CONTACT:+234 (0) 803 809 9423+234 (0) 808 237 4451+234 (0) 813 972 2228

www.layerveltd.com

EMAIL:[email protected]