Page 1: Power point operations management i (1)

Juan Ignacio Camino MoyaÁlvaro Fernández-Novel RodríguezJavier Ocaña Infante

Page 2: Power point operations management i (1)

Process Analysis and Design

Process:

Is any part of an organization which takes a set of inputresources which are then used to transform somethinginto outputs of products or services.

Design:

Refers to the process of originating and developing a planfor a product service or process.

Page 3: Power point operations management i (1)

Process Analysis and DesignWhen analyzing and designing processes we askquestions such as the following…

1. Is the process designed to achieve competitiveadvantage in terms of differentiation, response, orlow cost?

2. Does the process eliminate steps that do not addvalue

3. Does the process maximize customer value asperceived by the customer?

4. Will the process win orders?

Page 4: Power point operations management i (1)

Process Analysisand Design

…and we pursue the following goals:

a) Improvement in the way that the business processworks.

b) Value for the customer

c) Reduced costs for the company

d) Increase profits

e) Reduce wasted time and effort.

Page 5: Power point operations management i (1)

But how??

Process mapping:

-Used to identify different types of activities.

- Shows the flow of material people or information.

- Critical analysis of process maps can improve theprocess.

Page 6: Power point operations management i (1)

Process Analysis Tools

1. Flowcharts

2. Time-function mapping

3. Value stream analysis (VSM)

4. Process charts

5. Service blueprint.

Page 7: Power point operations management i (1)

1.Flowchart

A flow chart is a graphical or symbolic representation of aprocess.

Each step in the process is represented by a differentsymbol and contains a short description of the processstep.

The flow chart symbols are linked together with arrowsshowing the process flow direction.

Page 8: Power point operations management i (1)
Page 9: Power point operations management i (1)

Example 1:

Page 10: Power point operations management i (1)

Example 2:

Page 11: Power point operations management i (1)

Types of flowcharts

Top-down flowchart

Page 12: Power point operations management i (1)

Types of flowchartsDeployment flowchart

Page 13: Power point operations management i (1)

Types of flowchartsDetailed flowchart

Page 14: Power point operations management i (1)

2.Time function mapping

It’s a special model for deployment flowcharts.

Time added on the horizontal axis

Improvement objective: identify and eliminate waste(delay, duplication, extra steps and inefficiencies) generatedalong the process.

Page 15: Power point operations management i (1)

Example

Customer

Sales

Production control

Plant

Warehouse

Transport Move

Receive product

Extrude

Wait

Print

Order product

Process order

Wait

1 day 2 days 1 day 1 day 1 day

6 days

Page 16: Power point operations management i (1)

3. Process charts-It records the essential features of a work situation for subsequentanalysis.

-Different forms: outline process chart, flow process chart.

-Different viewpoints: worker, piece of equipment, material…

-Different levels: from macro (multiple activity chart) to micro processes (two-handed process)

Page 17: Power point operations management i (1)

Which are value-addedactivities?

Page 18: Power point operations management i (1)

Example

Page 19: Power point operations management i (1)

A value stream can be defined as all the steps – bothvalue added and non value added – required to take aproduct or service from its raw materials state to thecustomers.

4. Value Stream Mapping

Page 21: Power point operations management i (1)

First Step: Customer detailsTake time: Average unit production time needed to meetcustomer demand.

Example: The customer wants to buy 10 units per week,and the units are built during a 40 hour work week. Then,the average time to build an unit must be 4 hours (or less).

In our case, there is a daily demand of 700 piecesper day, and workers spend 8 hours daily, minus30 minutes as breaks.

(8*60-30)/700*60

Page 22: Power point operations management i (1)

Second Step: Material Flow

Page 23: Power point operations management i (1)

Third Step: Inventory/wait lines

Page 24: Power point operations management i (1)

Fourth Step: Information Flow

Page 25: Power point operations management i (1)

Fifth Step: Add Timeline

Page 27: Power point operations management i (1)

5. Service BlueprintingIs a process analysis technique that focuses on thecustomer and the provider´s interaction with thecustomer.

It also allows for visualization of the service developmentprocess in its early stages. In each process step, contactpoints between client and firm become visible.

The Service Blueprinting is based on the separation of theservice into individual processes that can be assumedseparately

Page 28: Power point operations management i (1)

Components of the Service Blueprinting

Physical Evidence: For each customer action the physical evidence that customers come in contact with is described at the very top of the service blueprint.

Customer actions: It includes steps, choices, activities and interactions that customer performs in the process of purchasing, consuming and evaluating the service

Onstage Contact: These actions are face-to-face actions between employees and customers and they are visible to the customer.

Page 29: Power point operations management i (1)

Components of the Service Blueprinting

Backstage Contact: Steps and activities that occur behindthe scene to support onstage activities. Every step andactivity in this stage is invisible to the customer.

Support Processes: These are all the activities carried outby individuals and units within the company who are notcontact employees. These activities need to happen inorder for the service to be delivered.

Page 30: Power point operations management i (1)
Page 31: Power point operations management i (1)

Components of the Service Blueprinting

Line of interaction: separates the process steps of the service activities that the client carries out independently

Line of visibility: separates the service activities that the client can see from the service activities which are hidden from view.

Line of internal interaction: separates contact employees activities from those of other service support activities and people.

Page 32: Power point operations management i (1)
Page 33: Power point operations management i (1)

DETAILED FLOWCHART

SERVICE BLUEPRINT

TIME FUNCTION MAPPING

VALUE STREAM

ANALYSIS

Page 34: Power point operations management i (1)