“Power Plant” Operating Rental Business - Case studies in Africa and Japan - March 19, 2013 Simon Lyons, Director of Marketing and Communications, Aggreko Plc, Kenichi Matsumoto, General Manager, Northeast Asia (Korea & Japan)

“Power Plant” Operating Rental Business - Case studies … · “Power Plant” Operating Rental Business - Case studies in Africa ... Director of Marketing and Communications,

  • Upload
    vananh

  • View
    217

  • Download
    4

Embed Size (px)

Citation preview

“Power Plant” Operating Rental Business- Case studies in Africa and Japan -

March 19, 2013

Simon Lyons, Director of Marketing and Communications, Aggreko Plc,Kenichi Matsumoto, General Manager, Northeast Asia (Korea & Japan)

Aggreko at a glance

1) World leader in Power Generation Rental with O&M

2) Critical mass of Rental fleet (9.2GW in fleet capacity),

with Gas fleet booming to exceed 1GWwith Gas fleet booming to exceed 1GW

3) 2-3 months to install and commission 100MW+ Plant

4) Modularized and highly mobile fleet in 20cft containers

5) Operating world wide over 100 countries in 194 locations

Aggreko context

2) Continuous geographic expansion in 50 years:

Holland (1962) => Scotland (1973) => North America (1986) => Singapore (1989) =>

Australia & New Zealand (1990) => Middle East (1991) => Africa (2002) => South

1) Listed on the London Stock Exchange (FTSE-100 index)

Australia & New Zealand (1990) => Middle East (1991) => Africa (2002) => South

America (2002) => Central America (2006) and acquired all of GE Rental Business

=> China (2008) => India (2009) =-> Russia (2009) => Eastern Europe (2010)

RevenuesFrom £340m in 2002

To £1.6bn in 2012

PeopleFrom 2,100 in 2002

To 6,000 in 2012

Market CapFrom £ 400m

To £5bn

3) The last 10 years:

Aggreko operation in Africa

Aggreko operation in Africa

20+ Utility customers in Africa at any one time

Highlight in Uganda as example:

Peaked at 300MW - 50% of Uganda power needs.Peaked at 300MW - 50% of Uganda power needs.

Filled gap when hydro power failed by drought (1 year in 5).

Had three geographically dispersed sites.

Environmentally sensitive sites (on Lake Victoria)

Speedy demobilization capability to manage risk

Diesel PowerGenerators

Gas PowerGenerators

TransformerLoadbank

#1 Modularized equipmentin 20cft containers

Power GenerationIndustrialCoolingGenerators Generators Loadbank

ChillerLoadbankTransformerGenerator

Cooling

#2 2-3 months from Contract toPower Generation

PowerContract signing2-3 months

For 100MW+ Power Plant

3/18/2013 7Commercial Agreement Mobilization Installation Commissioning

PowerGeneration

Contract signing2-3 months

#3 Cost of Generation by fuel typeand availability

Illustrative Cost of Generation DO = 100 Fuel as %of cost/kwh

Short –termfuel availability

Diesel Oil 100 88% Everywhere

Heavy Fuel Oil 68 77% Many places

Gas 37 53% Very hard tofind

#4 Demand for Gas Power Projectis growing

Case Study from MozambiqueCross Border Project

DuringInstallation

How INSTANT UTILITY happenedin Mozambique

Gas fielddiscovered byMozambique

Enormousdemand of

electricity in

Aggreko as IPP asINSTANT UTILITYMozambique

with no MarketDemand

electricity inSouth Africa

INSTANT UTILITY

Aggreko Solution as INSTANT UTILITY:1) Source the gas2) Build High Voltage Infrastructure3) Power generation license and generation4) Sell power to Mozambique and South Africa== >> Now selling to Namibia via South African Power Pool

South African Power Pool(Gas and Electricity movement)

MozanbiqueGas Power:

100WPlus

115MW・・・・・・・・・・

South African Power Pool

・・・・・・・・・・

Japan (since 2011)

June – September, 2012 (for Industry)Purpose: Peak Shaving

July 2011 to March 2013 (for Utilities)Accumulated: Diesel 248MW, Gas 100M

Commissioning Ceremony atBeverage Plant in Kyushu area

TEPCO 100MW Gas Site at Sodegaura

Korean Shipbuilding companies andOil & Gas (Exploration to Refining)

Example:Emergency power for Refineries at national disaster (Chille)Summer peak FCC operation at Refinery company

14

Korean Shipbuilding companies for :International Oil Majors such forSakhalin, Gorgon and other LNGProjects

Emergency Power in Asiafor platform refurbishment

1)Investment: As CAPITAL Expenditure As OPERATING Expense

2)Operating Period: FID to full return on capital Limited to rental period

Mega Infrastructure Capex Projectvs. Modularized Operating Rental

Full Scale CAPEX Project Operating Rental

| 15

2)Operating Period: FID to full return on capital Limited to rental period

3)Plant Site: Fixed location Can be changed by time

4)Plant Capacity: Fixed as designed Easily changeable

5) Fuel type: Fixed as designed Adjustable to market

6) Plant completion: 2-4 years 2-4 months

7) Civil work: Substantial in time and cost Simple e.g. H-Beam mount

8) Maintenance: Periodical Shutdown Possible w/o total Shutdown

How Operating Rental can complimentMajor CAPEX Project

Site locationchangeability

Ren

talMerit

Capacitychangeability

Fuel typechangeability

Off Balance Sheet

Plan & F/S Stage EPC Stage Operation Stage

Minimize andOptimize CAPEX

Management of powerdemand variation during

construction & commissioning

Early Power & Cash to improveProject cash flow

Peak Shaving

Power duringShutdown Maitenance

Co

mp

limen

tability

Presentors:

Simon Lyons

He has been a career marketer having worked on The Macallan malt whisky,Heineken beer and UEFA football among other brands. He joined Aggreko inHeineken beer and UEFA football among other brands. He joined Aggreko in2004 and for the past decade has been working in the corporate marketingand communication functions. His role covers Aggreko’s global operationsfrom Mozambique to Michigan and from local depots to the largest interimpower stations in the world.

Email: [email protected] Phone: +44 7736112008

Presentors:

Kenichi Matsumoto

Engaged in investment, finance, off-take and EPC for various energy projects in Oil,Gas, Chemical, Power Generation and other infrastructure projects in Asia and in CISat Mitsui & Co., Ltd. between 1980 and 2001. Thereafter he has engaged in corporatestrategy and organization change consulting including Post Merger Integration atstrategy and organization change consulting including Post Merger Integration atPricewaterhouseCoopers Consultants Co., Ltd. , and also led Japan operation of AspenTechnology, Inc., an oil, gas, chemical and utilities operations optimization softwarecompany. He joined Aggreko Japan K.K. in May 2012 as President & RepresentativeDirector, General Manager of Northeast Asia (South Korea and Japan), and as amember of APAC leadership team.