Page 1: Power-GEN Europe

© 2014, General Electric Company. Proprietary information. All rights reserved.

Cologne, Germany | 3-5, June 2014

Power-GEN Europe

Page 2: Power-GEN Europe

© 2014, General Electric Company. Proprietary information. All rights reserved.

9HA Gas Turbine Validation Milestones A new standard of testing and validating technology

Marcus Scholz

Cologne, Germany | 3-5, June 2014

Page 3: Power-GEN Europe

* Trademark of General Electric Company.

Agenda

• Gas Turbine industry trends

• 9HA heritage and status update

• Testing and validation

• Summary

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

Page 4: Power-GEN Europe

Experience matters …

Fired starts

Global installed

base

Fired hours

4,600 units

173 M hours

2.3 M starts

156

120

g

GE

fleet All

others

Reliability 98.2 97.0 +1.2

Availability 92.0 87.9 +4.1

Start Reliability

98.0 97.0 +1.1

Source: ORAP®, All rights to Underlying Data Reserved: SPS®, Modified by GE. Rolling 12 Month Data Apr''12-Mar'13.

4

GT installed base ~1,000 GW ~ half is GE technology

Source: McCoy Power Reports, estimate based on reported orders

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

More experience and higher reliability than all others combined

Page 5: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

GE’s gas turbine technology trend Advancing world class efficiency

Typical Efficiency vs. Temperature relationship

• H-class… >1430⁰C needed for >60% efficiency

• GE pioneered >1430C a decade ago with “H” class technology

• Six GE H-class units in operation >200,000 operating hours

• Last decade… steam cooling used

• Today… offering largest H-class GT with air cooling

5

1100 1260 1430 1600

52

54

56

58

60

62

2000 2300 2600 2900

Firing Temperature

H Class F Class E Class

CC

eff

icie

ncy

Advancements in materials & technology govern Firing temperature

Page 6: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

Growing efficiency and block size

30%

35%

40%

45%

50%

55%

60%

65%

0

100

200

300

400

500

600

700

800

70's 80's 90's Today

200 MW

400 MW

500 MW 50%

55%

60% >61 %

“E” “F” “H”

Combined Cycle Efficiency

5% lower LCOE (HA vs. F)…

>$20 MM annual

savings per 700 MW plant

$10/MMBtu gas, 6000 h/y

operation

“HA”

600-700 MW

Page 7: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

GE’s product portfolio - 2014 Reliable, flexible, efficient

7

Geared for 50Hz or 60Hz

60Hz Gas Turbines

50Hz Gas Turbines

43 MW

79 MW

90 MW

187 MW 227 MW

130 MW

265 MW 299 MW

470 MW

275 MW

397 MW GE GT-9HA

GE GT-9F

GE GT-9E

GE GT-7HA

GE GT-7F

GE GT-6F

GE GT-6B

GE GT-7E

330 MW

.03

.01

.03

.03

.04

.05

.01

.02

.03

.03

.05

.01

.02

World’s Largest 61%+ Net CC

efficiency

7

50 MW

Page 8: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

A decade of technology advances and lessons learned

DLN 2.6+

HA-Gas turbine platform evolution Three generations of gas turbine technology

9H 2003

9HA 2014

7F.05 2012

9F.05 2005

4-stage VGV 4-stage Turbine

14-stage Compressor Field-replaceable blades 3-stage VGV Advanced HGP

Note: Year denotes first operation

Page 9: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

Advanced Compressor Validated in 2011

• Two fully assembled rotors • Fully instrumented • Full load in 2014

• Tested in June 2011 • Fully mapped compressor • 90 – 110% Speed range

7F-5 compressor 2011 9HA compressor 2013

Validated Capability with growth

Page 10: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

State of the art Combustion system

DLN 2.6+ lab tested …

• 210 combustion tests per year

• 150 flow tests per year –

Component/subsystem/piping

• Fuel Flexibility Capability

.. and field validated

• 67 Operating 9 F-class gas

turbine units • >1,300,000 Fired hours

Validated operating & Fuel flexibility

Page 11: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

9HA Power turbine experience

Performance and improvements

• Double wall casing for improved clearances

• Advanced Gas Path (AGP) experience from 7F.04 and 7F.05 gas turbines 51 in operation

• 4-stage technology scaled from 9H

Hot gas path materials

• Single crystal technology

• Reduced oxidation and creep • Improved low-cycle fatigue • Air-cooled hardware for flexibility benefits • “F” & “H” - turbine heritage

Many common features with aero and existing ‘H’–class

Page 12: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

Second generation ‘air-cooled’ H-class Gas Turbine supporting 61%+ combined cycle efficiency

9HA Final assembly - January 2014

Turbine features: • Super-alloy rotor materials • F-class materials • Advanced cooling and sealing

Compressor features: • 14-stage, 3D aero design • Pressure ratio 21:1 • 3 stages VSV

Page 13: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

9HA Gas turbine transit to test stand

Leaving Belfort - On the Road …

Page 14: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

March 2014: On the barge On the train

9HA Gas turbine transit to test stand

Successfully met shipping constraints for Barge & Train

Page 15: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

9HA preparing for full load test facility Results more relevant than 8,000 hour field tests

Validating the assembled system beyond field conditions

15

Benefits

• Disconnected from grid …

beyond real world testing

• Variable speed, variable load

• Adjustable pressure control

• Comprehensive validation before first fire in the field, with “inducing age”

• Thorough product mapping … confidence in new products

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

Page 16: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

Power train 50m

Starter

motor

Drive motor

Torque converter

Gear box

H-class Gas Turbine

Test cell configuration Full speed full load power train

First engine, 2012: 7F.05 2014: 9HA 2015: 7HA 2016: 7HA.02 Facility can test 50Hz and 60Hz

Advanced compressor

Unique test facility to explore full load and beyond

Page 17: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

Validation details Tests build upon each other… starting with 7F.05 • Exceeding site operating envelope

• Ambient temperature from -37⁰C to 85⁰C

• Compressor flow and pressure capability (surge lines)

• Validated extreme transient behavior

• 90% - 110% speed and up to 115% load

• True Frequency deviations / grid events

• Fast and peaking starts

• Test bed has been verified & design tools

and processes validated in 2012

17

Pressure ratio

Co

rre

cte

d f

low

Capability vs. Fleet results

Gas turbine exceeded expectations

Page 18: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

Unfired, Part Speed Testing

Aero Mechanics

Perf/Aero Mapping

Combustion Mapping

Liquid Fuel Testing

Fast Start/Load

Surge Testing

Grid Code Testing

Exh frame cold flow

Rotating stall Part-speed aero Start-up aeromech

No load aeromech Loaded aeromech

Baseload performance Partload performance Comp mapping

Fast start testing Fast loading/ unloading

Combustion modes Hot fuel, cold fuel Load reject to FSNL/islanding

Output lapse mapping Frequency containment

9HA Test schedule - 2014

Water-to-fuel mapping Fuel transfers

Max PR vs IGV/nc Growth space expl.

Over half a year’s testing to replicate an engine life cycle

Page 19: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

9HA 2nd unit site construction EdF Bouchain: Site works ongoing

Control room Piping Rack HRSG + Water treatment

GT Pedestal - 8th stage to exhaust diffuser) On schedule for

Commissioning end of 2015

Page 20: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

Advanced gas turbines 50 and 60 Hz

2011 2012 2013 2014 2015

Analysis and

Modeling

F & H platform alignment

Intro rating

Compressor Test

7F-5 GT Test

9HA GT assy.

9HA GT Test

7HA launch

7HA GT Test

Verifying 9HA

final design

Verifying 7HA final design

9F-7 (9HA)

launch

7HA

9HA

Modular design and technology alignment: • Lessons learned

• Identifying growth potential

• Leveraging 9F and H design

• Commercial Commitments for FlexEfficiency

technology:

− 65x 7F-5 committed (1st COD 2014)

− 6x 7HA committed

− 4x 9HA committed (+1 test, +1 rotor)

>61% efficient technology platform

Page 21: Power-GEN Europe

© 2014 General Electric Company. Proprietary Information. All Rights Reserved.

21

Summary

Largest output with >61% Combined cycle efficiency for the lowest cost of electricity

Merging of H technology pioneered by GE + 1200 ‘F’-fleet experience

Air cooled with proven materials

Industry leading validation capability for reliable operation over the lifecycle of the turbine

Continuous pipeline of technology development for sustained industry leadership

HA technology validation – setting industry standard

Page 22: Power-GEN Europe