Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
P.O. Box 1180 | Port Townsend, WA | 98368‐4624 Administration 360.385.0565 | www.portofpt.com | [email protected]
The Port welcomes your comments in writing before the meeting (which will be presented to the commission and made available and part of the record), or live during the meeting - you can ‘raise your hand’ electronically during our Zoom meeting.
Port of Port Townsend Meeting Agenda
Wednesday, August 26, 2020, 5:30 p.m.
Via https://zoom.us/ – or call (253) 215‐8782 – and use Webinar ID: 862 6904 3651, Password: 911887 This meeting will only be accessible remotely, as per Governor's Proclamation 20‐28.
I. Call to Order / Pledge of Allegiance
II. Approval of Agenda
III. Public Comments
IV. Consent Agenda
A. Approval of Workshop & Regular Business Meeting Minutes, August 12, 2020 ...................... 1‐5
B. Approval of Warrants ............................................................................................................. 6‐14
C. Port Townsend Aero Museum Expansion – Preliminary Plans ............................................. 15‐38
V. Second Reading
VI. First Reading
VII. Regular Business
A. 2021 Budget Status & Issues ................................................................................................. 39‐43
B. COVID‐19 Update (no materials) ................................................................................................ 44
C. ICC updates (no materials) ......................................................................................................... 45
VIII. Staff Comments
IX. Commissioner Comments
X. Next Public Workshop / Regular Business Meeting: Workshop at 9:30 a.m.; Meeting at 1:00 p.m., Wednesday, September 9, 2020, via Zoom
XI. Executive Session none scheduled as of August 21, 2020
XII. Adjournment Informational Items .................................................................................................................................... 46 Port Contracts Update ................................................................................................................... 47 July 2020 Operations Report .................................................................................................... 48‐52
PORT COMMISSION PUBLIC WORKSHOP – August 12, 2020
The Port of Port Townsend Commission met for a Public Workshop via Zoom
Present: Commissioners Hanke, Petranek & Putney Executive Director Berg Finance Director & Port Auditor Berg Recorder Erickson Operations Manager Khile Maintenance Manager Sparks
I. CALL TO ORDER:
Commissioner Putney called the Workshop to order at 9:35 a.m.
II. AGENDA:
Discuss Budget issues, goals & assumptions, will include review of year-to-date June 2020 budget to actual results presented at the July 22nd Commission meeting.
• Include Operations & Maintenance Managers to discuss potential rate increases, new rates, equipmentpurchase requests and operating expenses.
III. ADJOURNMENT:
The Workshop adjourned at 11:26 a.m.
ATTEST:
Pamela A. Petranek, Secretary William W. Putney III, President
Peter W. Hanke, Vice President
1
PORT COMMISSION REGULAR BUSINESS MEETING – Wednesday, August 12, 2020
The Port of Port Townsend Commission met for a regular business session via Zoom online.
Present via Zoom online video: Commissioners Hanke, Petranek and Putney Executive Director Berg Finance Director & Port Auditor Berg Port Recorder Erickson Port Attorney Reardanz
I. CALL TO ORDER (00:00:00)Commissioner Hanke called the meeting to order at 1:00 p.m.
II. APPROVAL OF AGENDA (00:00:03)Commissioner Putney moved to accept the Agenda as presented.Commissioner Petranek seconded the motion. Motion carried by unanimous vote.
III. PUBLIC COMMENTS (00:0:30) ~ sent in via email and read aloud:
Bertram Levy emailed comments on the budget Workshop agenda. He liked the idea of prepayingmoorage for a year and had a few questions about logistics. He had ideas about how to incentivizeand facilitate monitoring ramp usage, including water usage in the washdown area. He alsomentioned that coupling costs to cost centers for capital improvement makes good sense.
Charley Kanieski had some budget considerations for the 2021 budget: make sure to get themaximum amount for IDD for the next year; subcontract for, rather than hire a grant writer; andsomeone to administer the IDD money.
A Discovery Bay Highland resident sent an email about low-flying aircraft that are extremely loud,wondering what, if anything the Port could do about enforcing the FAA-published minimal altituderequirements and/or noise abatement measures.
Liz Hoenig Kanieski attended the meeting via Zoom and expanded on her husband’s commentswith suggestions: present an integrated package of operating budget, 6-year capital budget, andrevenues; hold operating expenses to 2017 levels for five years; develop a preventativemaintenance plan; etc.
IV. CONSENT AGENDA (00:15:33)
A. Approval of Regular Business Meeting Minutes from July 8, 2020
B. Approval of Warrants
Warrant #062652 through #062661 in the amount of $38, 673.23 and Electronic Payment in theamount of $144,338.36 for Payroll & Benefits.
Warrant #062662 through #062725 in the amount of $402,017.21 for Accounts Payable.Electronic Debit in the amount of $175.00 for Business License Renewal.Electronic Debit in the amount of $20,567.73 for 2nd Quarter Tax Return.Warrant #062468 in the amount of $709.82 is declared void.
Commissioner Putney moved to approve the Consent Agenda as presented. Commissioner Petranek seconded the motion. Motion carried by unanimous vote.
2
Port Commission Regular Business Meeting, August 12, 2020 pg. 2
PoPT Commission Meeting Minutes 20200812CommMtgMins.docx
V. SECOND READING - none
VI. FIRST READING - none
VII. REGULAR BUSINESS (00:19:47)
A. COVID-19 Model Update
Executive Director Berg introduced the report by saying this was the ninth memo providingupdated information about how the COVID-19 pandemic is affecting the Port. The modelcontinues to perform about as predicted, and there are no new recommendations for theCommission.Commissioner Hanke thanked Finance Director Berg for the highlights in the statement at theback, saying it really helps.
B. Comprehensive Scheme of Harbor Improvements (CSHI) Update (00:21:07)
Executive Director Berg told the Commission that there is a call for funding by Recreation andConservation Office (RCO) that matches nicely with two projects: the priority-listed Mats Matsboat launch and the Gardiner boat launch (the only public access to Discovery Bay). Thecurrent draft CSHI update was presented to the Commission at a January 2020 workshop, andthe Port would like to complete the update in a timely way in order to maintain eligibility forBoating Facilities Program Grants administered by the RCO and to more accurately reflectchanging capital priorities.Commissioner Hanke commented that a Port can update its Comp. Scheme whenever it wantsto, so that even if we move on this fast track, we plan to come back and redo the CSHI. Oneupdate to be sure to do is to change the Executive Director name on page 28.Executive Director Berg asked for direction on timing and on priorities to include in the 2021 list,and mentioned that we need to finish the more comprehensive update before election season,which is a bad time to do long-range planning.After a short discussion, Commission supported finishing the update to the current document(which is extremely thorough) to qualify for this grant, and then continuing to modify it in amore thorough way later, involving the public in a fully vetted process. Commission agreed thata more complete update to the CSHI would need to be complete by early May to avoid theelection season, and that it needs to be aligned with the Strategic Plan. They felt that aftercompleting the budget in late fall they might have time to address this.Commissioner Putney moved to authorize staff to proceed with preparation of an update tothe Comprehensive Scheme of Harbor Improvements as necessary to maintain eligibility forgrant funding, with a first reading and Commission public hearing anticipated to beconducted on September 23, 2020, and second reading and adoption anticipated forOctober 14, 2020.Commission clarified that this would not be the final update.Commissioner Petranek seconded, and the motion carried unanimously.
C. Intergovernmental Coordinating Committee (ICC) updates (00:38:50)
Executive Director Berg said that since the last meeting, the ICC (the group of 8) occurred onJuly 23 at 5:00 PM, and reported that the they had received some updates from communitygroups, and the next meeting on August 27, the ICC would look at their recommendations, andon September 24 there will be some public process for a draft in October.
3
Port Commission Regular Business Meeting, August 12, 2020 pg. 3
PoPT Commission Meeting Minutes 20200812CommMtgMins.docx
Commissioner Petranek shared that the Food Systems Committee is meeting weekly, with getting together one week, and doing listening sessions the following week, and they learned that the timeframe is extremely limited – Commissioner Brotherton let them know that the CARES money needs to be determined and designated by the end of September. There is funding, but it needs to be for something that is fundable now, not for some future thing. The Committee is looking at a list of projects and narrowing that down based on this information. Commissioner Hanke shared that the ICC group came to the same realization that the timing was short. Commissioner Putney shared that Russ Elliott (Director of the State Broadband Office in the Department of Commerce) zoomed with the Broadband Committee and encouraged them to apply for a big budget, because he feels that the money is there and can have a big impact on economic recovery; however, applications cannot be drawn out - they need to be done quickly.
VIII. STAFF COMMENTS (00:43:19)Executive Director Berg commented that it had been a maintenance heavy week: crew was workingon fire suppression at Point Hudson, and tires were being changed on the 300-Ton Travelift. Hetoured Coast Seafoods with Pam on Monday, and will be back next week to meet with somemembers of the Quilcene Lingerlonger committee about where Quilcene fits with our plans. Hementioned that IDD funds could be used as matching funds for grants to pay for projects, which is agood way to stretch the funds. He mentioned that he had a nice conversation with U.S.Congressman Kilmer; and that he is getting farther along in contracting with a lobbyist to help thePort. He mentioned there was a dive team at Point Hudson doing necessary survey work there, andthat Widener’s team is working at various project locations to help the Port with permitting,including the Point Hudson Jetty and Boat Haven breakwater repair.
Finance Director Berg commented that she is busy preparing the budget and is discussing projectsand costs with Executive Director Berg and other managers to get an idea of costs. They are alsolooking at rates, so they can present them simultaneously with a first draft of the budget to theCommission. The Port recently did a second draw on the line of credit in the amount of $1.25 millionfor a fourth payment to Scarcella Brothers for the airport runway project in the amount of $1.4million.
IX. COMMISSIONER COMMENTS (00: 47:38)
Commissioner Petranek thanked the public for their comments today and encouraged thecommunity to participate, especially during the budget process in the next few months. She inviteda Commission discussion on ways to engage the public further – like Zoom chats with aCommissioner, or a booth at the public market - different ways to engage the community. Onepublic engagement thing she was involved in was a KPTC interview aired Tuesday about what’sgoing on at the Port; there will be a podcase that can be used on the Port’s website.
Commissioner Petranek toured Coast Seafoods with Eron and initiated discussion will the Quilcenecommunity; they will meet with them again on Monday (8/17/20) about how they can make apresentation to the Commission. She attended the Marine Resource Committee on 8/4/20 wherethere was a discussion with folks from Quilcene; County Commissioner Brotherton was there andsaid he is dedicated to doing anything he can to help, along with the Port. MRC also discussed PortTownsend Public School District’s use of maritime, place-based education.
4
Port Commission Regular Business Meeting, August 12, 2020 pg. 4
PoPT Commission Meeting Minutes 20200812CommMtgMins.docx
Commissioner Petranek met with Kate Dean and will meet with City, County, Port leadership (City Council members Michelle Sandoval and Ariel Speser, along with and County Commissioner Kate Dean) again this Friday about a shared vision. She met with Derek Kilmer and Pete Langley yesterday via Zoom and talked about how Pete’s foundry is one of only 5 in the country contributing to a huge economic impact nationally. They also talked about waste management and how to reuse and dispose of it locally instead of just shipping it out of the area.
Commissioner Putney commented that he had toured Coast Seafoods as well, and had gone to see the FLUPSY at the John Wayne Marina, followed up with a tour at Point Hudson to see where a FLUPSY might fit there.
Commissioner Hanke commented that he had toured FLUPSY as well and was excited about the possibility of the Jamestown S’Klallum tribe’s becoming a part of Point Hudson. He said it was encouraging to see how well the Port is functioning right now -- at all levels. He expressed concern and cautioned that it’s important to remember that people can only do so much; however, he wanted to compliment staff for working so hard.
X. Next Public Workshop & Regular Business Meeting (00:58:11) Regular Business MeetingWednesday, August 26, 2020, at 5:30 p.m., via Zoom. At this time there is no public workshopscheduled.
XI. EXECUTIVE SESSION (00:55:56) re current or potential litigation, RCW 42.30.110(1)(i)
Commissioner Hanke adjourned at 1:59 p.m. to executive session, with no potential decisions madetoday, Commission will not reconvene in order to adjourn.
XII. ADJOURNMENT: after close of Executive Session, meeting adjourned at 2:49 p.m., there being nofurther business before the Commission.
ATTEST:
_________________________________
Peter W. Hanke, President
______________________________
Pamela A. Petranek, Secretary
__________________________________
William W. Putney III, Vice President
5
PORT OF PORT TOWNSEND AGENDA COVER SHEET
MEETING DATE August 26, 2020
AGENDA ITEM ☒ Consent ☐ 1st Reading ☐ 2nd Reading ☐ Regular Business ☐ Informational
AGENDA TITLE IV.D. Port Townsend Aero Museum Expansion – Preliminary Plans
STAFF LEAD Eric Toews, Deputy Director
REQUESTED ☐ Information ☒ Motion/Action ☐ Discussion
ATTACHMENTS 1. Info Memo2. PT Aero Museum Expansion Plans
15
PORT OF PORT TOWNSEND INFORMATIONAL MEMO
20200826-Staff Memo Page 1 of 1 Port Townsend Aero Museum Expansion Plans
DATE: 8/26/2020
TO: Port Commission
FROM: Sue Nelson, Lease & Contracts Administrator
SUBJECT: Port Townsend Aero Museum Expansion Plans
BACKGROUND: The Port received a letter dated November 22, 2019 from Mike Payne, Port Townsend Aero Museum Director, requesting to expand the current museum display building. The proposed addition is 90’ x 60’ (5,400 square feet), with a height of 38’. A Letter of Intent was agreed to in January 2020, specifying the following to be included in the plans:
i. Preliminary grading and drainage plan;ii. Stormwater management plan;iii. Engineered site plan with survey;iv. Utilities locations and power upgrade plan (if needed);v. Proposed wastewater disposal and water service connections (if any);vi. Proposed locations of ingress and egress to and from public thoroughfares (if any);vii. Proposed exterior lighting design;viii. Proposed locations for staff/visitor parking; andix. Proposed building design.
The preliminary construction plans and specifications should be of sufficient detail to enable potential contractors and subcontractors to make reasonably accurate bid estimates and to enable the Port to make an informed judgment about the design and quality of construction.
GPS coordinates and related information on the site have been submitted to the FAA for consideration to amend the ALP.
DISCUSSION: As required in the January 2020 Letter of Intent between the Port and the Aero Museum, preliminary plans for the expansion are now being submitted for Commission approval. Note: GPS coordinates and related site material were submitted to the FAA for the ALP Amendment, which is currently in process.
RECOMMENDATION: Approve the attached Aero Museum expansion plans.
ATTACHMENTS • Preliminary Port Townsend Museum Expansion Plans
16
12
34
56
78
910
1112
1314
1516
1718
1920
2122
23
24 2526
2728
2930
3132
FUTURE PARKING
XX
XX
X
XX
X
XX
XX
X
EX. DUMPSTERPAD/FENCING
26'
9' TYP.
18'
EX. PLANTER
PORT TOWNSENDAEROMUSEUM
EXISTING DITCH
EXISTING APRON AND TARMAC
PTAM SIGN
EX. AREA LIGHT
EX. AREA LIGHT
DRIVE THRU/ DROP OFF
EX. OUTSIDE SEATINGDISPLAY W/LANDSCAPING
BRONZE STATUE
EX. 10' WIDE X 200' LONGSCREEN-C LANDSCAPING
AEROMUSEUM DRIVE
EX. WATER, POWER &TELEPHONE SERVICE LINE
EX. PROPANETANK & PAD
EX. TRANSFORMERAND PAD
EDGE OF CATEGORY4 WETLAND
GRASS
EXISTING ROOF DRAIN INFILTRATION BED 80 LF.
GRASS
EX. CONDENSER PAD
EX. LIFT STATIONEX. SEPTIC TANK
EXTENDED TO DRAINFIELD
AIRPORT ROAD
EX. CATCH BASIN
EX. CATCH BASIN
EX. CATCH BASIN
EX. CATCH BASIN
LEGEND:... PROPERTY BOUNDARY... EXISTING BUILDING ROOF EDGE... PROPOSED BUILDING ROOF EDGE... BUILDING WALL EDGE... SEPTIC SYSTEM... PARKING LOT MARKING... STORM PIPE LINE... FENCE... EDGE OF WETLAND... EXISTING ROAD/ TARMAC... ROAD CENTERLINE... POWER, TELEPHONE, & WATER... DITCH LINE... CONCRETE PAD AND SIDEWALK
... SCREEN - C LANDSCAPING
...PLANTER
... TREES
... CATCH BASIN
XXXXXX
HELICOPTERLANDING PAD
PROPOSED PORT TOWNSENDAERO MUSEUM ADDITION 5,400 S.F.
EX. CATCH BASIN
60'
90'
ROOF LINE
BUILDNG LINE
SITE
PLA
NR
EVIS
ION
S:
SCALE:
CLIE
NT:
TITL
E:
C1
DATE:
JOB NO:
FILE:
SHEET
October 30, 2019
19300
19300
SET: PRELIMINARY
ASSO
CIA
TE
SE
NO
VIC
&
INCO
RPOR
ATED
ZPH
ONE:
(360
) 417
-050
1FA
X: (3
60) 4
17-0
514
301 E
. 6TH
STR
EET,
SUI
TE 1
PORT
ANG
ELES
, WA
9836
2
EMAI
L: ZE
NOVI
C@ZE
NOVI
C.NE
T
1" = 20'
0
Scale: 1" = 20'20' 40' 60'
PT A
ERO
MUSE
UM10
5 AIR
PORT
ROA
DPO
RT T
OWNS
END,
WA.
9836
8
BUILD
ING
ADDI
TION
FOR
POR
T TO
WNS
END
AERO
MUS
EUM,
JEFF
ERSO
N CO
UNTY
WA.
- PA
RCEL
NO.
001-
331-
002 &
284-
006
DAT
EM
ARK
NO
TE
S CO T T R . HE AD
I
P RO FE S S IO N A L E N G I NE E R
STATE
OF WA S HIN GTON
R EG I S T E R E D43658
R
CK
PRELIMINARY
17
PORT TOWNSEND
MUSEUM
AERO
NEW SIDING TO MATCH
NEW BRACES TO MATCH
120'-0" 60'-0"
PLATE LINE, MEZZ. LINE
RE-INSTALL EX. SIGNON NEW GABLE
EXTEND GABLE WALL 90' TOSOUTH, MATCH EX. PROFILE
120'-0"90'-0"
NEW METAL ROOFING TO MATCH
REMOVE CORNER TRIM ANDINSTALL NEW SIDING TO MATCH
NEW WINDOWS TO MATCH
NEW BRACES TO MATCH
38'-0
"
10'-0
"
PLATE LINE, MEZZ. LINE
X
INCO
RPOR
ATED
XPH
ONE:
(360
) 417
-050
1FA
X: (3
60) 4
17-0
514
301 E
. 6TH
STR
EET,
SUI
TE 1
PORT
ANG
ELES
, WA
9836
2
A1
XX
EMAI
L: ZE
NOVI
C@ZE
NOVI
C.NE
T
October 30, 2019
19300 A1
18 " = 1'
19300
L
I
M
I
N
A
R
Y
PORT
TOW
NSEN
D AE
RO M
USEU
M10
5 AIR
PORT
ROA
DPO
RT T
OWNS
END,
WA
9836
8
ADDI
TION
TO
THE
AERO
MUS
EUM,
105 A
IRPO
RT R
OAD,
POR
T TO
WNS
END,
WA
18
1
2
3
4
8
13
18
20
21
22
23
ABDGWAAACAFAG
25'-4" 15'-0"
22'-10" 17'-6" 17'-2" 5'-6"
60'-0
"60
'-0"
1'-0"
25'-6
"26
'-6"
18'-6
"17
'-6"
UP
UP
UP
UP
RELOCATE DOOR, ANDSTAIRS TO NEW END WALL
DEMO ENDWALL,INTERIOR COLUMNS, ANDPORTION OF CATWALK
LINE OF EX. CATWALK
19
NEW
48'x2
0' BI
FOLD
DOO
R
RELOCATE EX. STAIRS
RELOCATE MAN DOOR
EXTEND CATWALK ABOVE AS SHOWN
4'-0"
38'-0
"
INCO
RPOR
ATED
PHON
E: (3
60) 4
17-0
501
FAX:
(360
) 417
-051
4
301 E
. 6TH
STR
EET,
SUI
TE 1
PORT
ANG
ELES
, WA
9836
2
A2
EMAI
L: ZE
NOVI
C@ZE
NOVI
C.NE
T
October 30, 2019
19300 A1
332 = 1'
19300
L
I
M
I
N
A
R
Y
PORT
TOW
NSEN
D AE
RO M
USEU
M10
5 AIR
PORT
ROA
DPO
RT T
OWNS
END,
WA
9836
8
ADDI
TION
TO
THE
AERO
MUS
EUM,
105 A
IRPO
RT R
OAD,
POR
T TO
WNS
END,
WA
19
JOBNO
LOCATION
CUSTOMER
BUILDER
PROJECT
BUILDERS PO#
VP BUILDINGSVARCO PRUDEN
DATE
DRAWN / CHECK
PAGE
VPC VERSION:
FILENAME
VP Buildings 3200 Players Club Circle Memphis TN 38125
Codes and Loads
Standard Erection DetailsSpecial DrawingsCoveringSecondary StructuralPrimary StructuralAnchor Rod Plan
Cover SheetPAGESDRAWING TITLE
DRAWING INDEXDESCRIPTIONDATETYPE
DRAWING RELEASE HISTORY
DESIGN CATEGORY D, E OR F. SEE CODES AND LOADS SECTION BELOW FOR DETAILS.PRE-TENSION A325 BOLTS IF LOCATED IN HIGH SEISMIC AREAS. FOR IBC BASED CODES; HIGH SEISMIC IS
"SNUG-TIGHT" EXCEPT AS FOLLOWS;
IN CANADA, ALL A325 AND A490 BOLTS SHALL BE "PRE-TENSIONED", EXCEPT FOR SECONDARY MEMBERS ANDFLANGE BRACES.
PRE-TENSION A325 BOLTS IF BUILDING SUPPORTS MACHINERY THAT CREATES VIBRATION, IMPACT, OR STRESS
IT IS THE RESPONSIBILITY OF THE ERECTOR TO ENSURE PROPER BOLT TIGHTNESS IN ACCORDANCE WITH APPLICABLEREGULATIONS. SEE RCSC SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH STRENGTH BOLTS FOR MORE INFORMATION.SEE ERECTION GUIDE FOR BOLT TIGHTENING INSTRUCTIONS. THE FOLLOWING CRITERIA MAY BE USED TO DETERMINETHE BOLT TIGHTNESS (I.E.-SNUG TIGHT OR PRE-TENSION) UNLESS REQUIRED OTHERWISE BY LOCAL JURISDICTION ORCONTRACT.
ALL A490 BOLTS SHALL BE "PRE-TENSIONED". A325 BOLTS IN PRIMARY FRAMING AND BRACING CONNECTIONS MAY BE
PRE-TENSION A325 BOLTS IF BUILDING SUPPORTS A CRANE GREATER THAN 5 TON CAPACITY.
REVERSALS ON CONNECTIONS.
PRE-TENSION ANY CONNECTION WITH DESIGNATION A325-SC. SLIP CRITICAL (SC) CONNECTIONS MUST BE FREEOF PAINT, OIL OR OTHER MATERIALS THAT REDUCE FRICTION AT CONTACT SURFACES. GALVANIZED OR LIGHTLYRUSTED SURFACES ARE ACCEPTABLE.
SECONDARY MEMBERS AND FLANGE BRACE CONNECTIONS ARE ALWAYS "SNUG TIGHT", UNLESS INDICATED OTHERWISE INERECTION DRAWING DETAILS.
HOT ROLLED ANGLES A529, A572, A588, A992 GRADE 50
3 PLATE WELDED SECTIONSCOLD FORMED LIGHT GAGE SHAPESBRACE RODSHOT ROLLED MILL SHAPES
CLADDING A653, A792
A36, A529, A572, A588, A992A572, A510A653, A1011A529, A572, A1011, A1018 GRADE 55
GRADE 60GRADE 50GRADE 36 OR 50
GRADE 50 OR GRADE 80
ASTM DESIGNATION
GENERAL NOTESMATERIALS
HIGH STRENGTH BOLT TIGHTENING REQUIREMENTS
HOLLOW STRUCTURAL SECTION (HSS) A500 GRADE BR
a division of BlueScope Buildings North America, Inc.
VP BUILDINGSVARCO PRUDEN
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VPBUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THEAPPLICABLE PURCHASE ORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALLNOT BE MODIFIED, REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTENAPPROVAL OF VP BUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VPBUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THEAPPLICABLE PURCHASE ORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALLNOT BE MODIFIED, REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTENAPPROVAL OF VP BUILDINGS.
THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOOD QUALITYWORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING, DETAILS REFERENCED IN THISDRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAINING TO PROPERERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VPBUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THEAPPLICABLE PURCHASE ORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALLNOT BE MODIFIED, REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTENAPPROVAL OF VP BUILDINGS.
THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOOD QUALITYWORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING, DETAILS REFERENCED IN THISDRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAINING TO PROPERERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VPAND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THEVP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGNOF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TOANY DESIGN OR PERFORMANCE REQUIREMENTS SPECIFIED BY VP.
Planograph Details
Notes
D
INSPECTION AND TESTING
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VPBUILDINGS. IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THEAPPLICABLE PURCHASE ORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALLNOT BE MODIFIED, REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTENAPPROVAL OF VP BUILDINGS.
THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOOD QUALITYWORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING, DETAILS REFERENCED IN THISDRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, AND INDUSTRY STANDARDS PERTAINING TO PROPERERECTION, INCLUDING THE CORRECT USE OF TEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VPAND DESIGN AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP. THEVP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGNOF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TOANY DESIGN OR PERFORMANCE REQUIREMENTS SPECIFIED BY VP.
SPECIAL INSPECTIONS AND TESTING REQUIRED BY AUTHORITY HAVING JURISDICTION (AHJ) DURING CONSTRUCTION AND/ORSTEEL FABRICATION IS THE RESPONSIBILITY OF THE OWNER OR OWNERS AUTHORIZED AGENT. WHEN REQUIRED, THE OWNERSHALL EMPLOY A QUALITY ASSURANCE AGENCY (QAA) APPROVED BY THE AHJ. THE BUILDER IS RESPONSIBLE TOCOORDINATE BETWEEN THE QAA FIRM AND BBNA FABRICATION FACILITIES. THE TYPE AND EXTENT OF SPECIAL INSPECTIONSAND NDT WELD TESTING MUST BE SPECIFICALLY STIPULATED IN CONTRACT DOCUMENTS OR BBNA WILL ASSUME SPECIALINSPECTIONS AND/OR NDT TESTING ARE WAIVED AS PERMITTED BY THE BUILDING CODE BASED ON BBNA FACILITIES IASAC472 ACCREDITATION.
COVER SHEETGrant Steel Building Systems, Inc.
Port Townsend Aero Museum
Port Townsend, Washington
Port Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
1
Aero Museum Add_Rev12020.2
11:50:126/25/2020
NOT FOR CONSTRUCTION
20
ShapeSnow Buildup
Surface Description X Location Y Location Magnitude2020 Addition Roof: A Unbalanced Snow Load 1, Shifted Right : Roof: A 0.0 ft 10.3 ft 13.9 psf
0.0 ft 0.0 ft 13.9 psf90.0 ft 0.0 ft 13.9 psf90.0 ft 10.3 ft 13.9 psf
2020 Addition Roof: A Unbalanced Snow Load 1, Shifted Right : Roof: A 90.0 ft 0.0 ft 13.9 psf91.0 ft 0.0 ft 13.9 psf91.0 ft 10.3 ft 13.9 psf90.0 ft 10.3 ft 13.9 psf
2020 Addition Roof: B Unbalanced Snow Load 1, Shifted Right : Roof: B 0.0 ft 0.0 ft 18.0 psf90.0 ft 0.0 ft 18.0 psf90.0 ft 7.9 ft 18.0 psf0.0 ft 7.9 ft 18.0 psf
2020 Addition Roof: B Unbalanced Snow Load 1, Shifted Right : Roof: B -1.0 ft 7.9 ft 18.0 psf-1.0 ft 0.0 ft 18.0 psf0.0 ft 0.0 ft 18.0 psf0.0 ft 7.9 ft 18.0 psf
1. The Snow Buildup loading shown is in addition to the flat or sloped roof snow.2. The X and Y Location dimensions are from the point of origin of each surface.
WHEN MULTIPLE BUILDINGS ARE INVOLVED, SPECIFIC LOAD FACTORS FOR DIFFERING OCCUPANCIES, BUILDING DIMENSIONS,Codes and Loads
HEIGHTS, FRAMING SYSTEMS, ROOF SLOPES, ETC., MAY RESULT IN DIFFERENT LOAD APPLICATION FACTORS THANINDICATED BELOW. SEE CALCULATIONS FOR FURTHER DETAILS. WIND LOADS ARE APPLIED TO OVERALL BUILDING ENVELOPE.COMMON WALLS BETWEEN CONNECTED SHAPES ARE NOT SUBJECT TO EXTERNAL WIND LOADS.City: Port Townsend County: Jefferson State: Washington Country: United States
Building Code: 2015 International Building CodeBuilding Code
Structural: 10AISC - ASD Rainfall: I: 4.00 inches per hourBuilding Risk/Occupancy Category: II (Standard Occupancy Structure) Cold Form: 12AISI - ASD f'c: 3000.00 psi Concrete
Collateral Gravity:6.00 psfDead and Collateral Loads
Collateral Uplift: 0.00 psf
Wind LoadWind Speed: Vult: 110.00 (Vasd: 85.21) mphThe 'Envelope Procedure' is Used - User ModifiedWind Exposure: C - Kz: 0.988Parts Wind Exposure Factor: 0.988Wind Enclosure: EnclosedTopographic Factor: Kzt: 1.0000
NOT Windborne Debris RegionBase Elevation: 0/0/0Primary Zone Strip Width: 2a: 11/11/10Parts / Portions Zone Strip Width: a: 5/11/13Basic Wind Pressure: q: 26.01 psf
Roof Covering + Second. Dead Load: VariesMaterial Dead Weight
Frame Weight (assumed for seismic):5.00 psf - USR
Snow LoadGround Snow Load: pg: 32.97 psfFlat Roof Snow: pf: 25.39 psfDesign Snow (Sloped): ps: 22.98 psfRain Surcharge: 0.00Specified Minimum Roof Snow: 25.00 psf (USR)Exposure Factor: 3 Sheltered - Ce: 1.10Snow Importance: Is: 1.000Thermal Factor: Heated - Ct: 1.00Ground / Roof Conversion: 0.70Unobstructed, Slippery
Roof Live Load: 20.00 psf ReducibleRoof Live Load
Seismic LoadLateral Force Resisting Systems using Equivalent Force ProcedureMapped MCE Acceleration: Ss: 135.10 %gMapped MCE Acceleration: S1: 49.30 %gSite Class: Stiff soil (D)Seismic Importance: Ie: 1.000Design Acceleration Parameter: Sds: 0.9007Design Acceleration Parameter: Sd1: 0.4953Seismic Design Category: DSeismic Snow Load: 0.00 psf% Snow Used in Seismic: 0.00Diaphragm Condition: FlexibleFundamental Period Height Used: 30/9/15
Transverse Direction ParametersOrdinary Steel Moment FramesRedundancy Factor: Rho: 1.50 - USRFundamental Period: Ta: 0.4348R-Factor: 3.50Overstrength Factor: Omega: 2.50Deflection Amplification Factor: Cd: 3.00Base Shear: V: 0.2573 x W
Longitudinal Direction ParametersOrdinary Steel Concentric Braced FramesRedundancy Factor: Rho: 1.50 - USRFundamental Period: Ta: 0.2616R-Factor: 3.25Overstrength Factor: Omega: 2.00Deflection Amplification Factor: Cd: 3.25Base Shear: V: 0.2771 x W
Roof: A2020 Addition
X
Y
Roof: B2020 Addition
X
Y
Roof: C2020 Addition
X
Y
Wall 2 - Canopy 12020 Addition
X
Y
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D CODES AND LOADS
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
2Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION
11:50:126/25/202021
BUILDER/CONTRACTOR RESPONSIBILITIES
VP Buildings follows the guidelines as outlined in the AISC and MBMA Codes of Standard Practice.
PANELS
Oil canning is an inherent characteristic of cold formed steel panels. It is the result of severalfactors that include induced stresses in the raw material delivered to VP, fabrication methods,installation procedures, and post installation thermal forces. Thru fastened panels will exhibit somedimpling when installed, especially when insulation is installed between panels and secondarysupports. Dimpling can be minimized by careful installation, taking care not to over drive fasteners.
springing back into place. All panels experience this action to some degree, especially withconcealed clip Standing Seam panels. Roof rumble noise may be minimized by providing a layerof blanket insulation between the panels and any hard support surface such as steel secondarymembers, substrates such as plywood, steel decking, or rigid board insulation. A minimum of3 inch thick blanket is recommended over steel secondary members, or 2 inch over substrates.
Oil canning, dimpling, and roof rumble do not affect the structural integrity or weather tightnessof the panels and is not grounds for rejection of panels.
RAIN WATER RUNOFF
Drainage systems must be designed by the project professional to comply with code requirements.VP is not responsible for drainage designs, overflow scuppers, down piping, etc. The projectprofessional and contractor are responsible to ensure that primary drains and overflow devicessuch as scuppers and auxiliary drains are provided as required for the required rain intensity at
Roof rumble is a phenomenon that is caused by wind gusts lifting up on the roof panels and then
the building perimeter and at valley conditions to prevent ponding.
However, it is imperative that installed Standing Seam panels be secured to the secondaryThe Standing Seam joint detail is designed with an interlocking feature for ease of installation.
structural members and properly seamed prior to departure from the job site each day.
SKYLIGHTS
Local building departments may require added fall restraint due to conditions that may affect theskylight structural integrity. It is the responsibility of the builder to determine and provide anyadded fall restraint under the skylight as may be required by your building department.
STEEL SHOP COAT
The purpose of VP's shop coat is to provide protection for the steel members duringtransportation, during temporary job site storage and during erection. Standard shop formulationis not designed to perform as a finish coat when exposed to environmental conditions. Membersshall be kept free of the ground and properly drained during job site storage. It is the Builder'sresponsibility to ensure that if a finish coat is being applied over VP shop coat that thepainting contractor verifies compatibility between his finish coat and VP's shop coat.
VP Buildings standard product specifications, design, fabrication, quality criteria shall govern all workunless stipulated otherwise in the contract documents. In case of discrepancies betweenVP Buildings structural plans and plans for other trades, VP Buildings structural plans shall govern.
It is the responsibility of the Builder to obtain approvals and permits from all governing agencies andjurisdictions as required. Approval of VP Buildings drawings constitutes the builders acceptance of VPinterpretation of the contract purchase order. Unless specific design criteria concerning interfacedesign and details are furnished as part of the contract, VP Buildings design assumptions shall govern.
CONSTRUCTION & ERECTION RESPONSIBILITY
The Builder is responsible for construction in strict accordance with VP Buildings "FOR CONSTRUCTION"drawings and all applicable product installation guides. VP is not responsible for work done from anyother VP drawings that are not marked "FOR CONSTRUCTION", nor any drawings prepared by others.
As erected field assemblies of members shall be as specified in MBMA Code of Standard Practice(in Canada - CSA S16), which require L/500 tolerance of installed members. Occasionalfield work including shimming, cutting, coping, and drilling for final fit-up are considered part oferection. Specified field work and field welding conditions indicated on these drawings shallalso be included in the erectors scope of work. See Erection Guide for shimming procedure.For building with top riding bridge cranes see Crane Data drawing for column plumb tolerance.
The building erector shall be properly licensed and experienced in erecting metal building systems.The Builder is responsible for having knowledge of, and shall comply with, all OSHA requirementsand all other governing site safety criteria. The builder is responsible for designing, supplying,locating and installing temporary supports and bracing during erection of the building. VPbracing is designed for code required loads after building completion and shall not be consideredas adequate erection bracing. See Erection Guide.
EXISTING STRUCTURES
BRACING
Tension brace rods work in pairs to balance forces caused by initial tensioning. Care must betaken while tightening brace rods so as not to cause accidental or misalignment of components.All rods must be installed loose and then tightened. Rods should not exhibit excessive sag. Forlong or heavy rods, or angles it may be necessary to support the rods at mid-bay by suspendingthem from secondary members.
Bracing for seismic or wind loading of objects or equipment that are not a part of the VPstructure must be designed by a qualified professional to deliver lateral loads to primary framesand rod bracing struts. Equipment bracing and suspension connections must not impose torsionor minor axis loads, or cause local distortion in any VP components. VP accepts noresponsibility for design or installation of bracing systems not furnished by VP.
FIELD WELDING
All field welding shall be done at the direction of a design professional, and done in accordancewith governing requirements (AWS in USA, CWB in Canada) by welders qualified to perform thewelding as directed by the applicable welding procedure specification (WPS). A WPS shall beprepared by the contractor for each welding variation specified. The contractor is responsible forany special welding inspection as required by local jurisdiction. Filler metal shall be70 ksi (480 MPa) tensile strength. For welds in high seismic force resisting system(Seismic Cat D, E or F), minimum Charpy V-Notch toughness shall meet AISC-341 criteria(20 ft-lbs min @ 0Deg F). Interpass temperatures shall not exceed 550Deg F (300Deg C).
DELIVERIES
It is the responsibility of the builder to have adequate equipment available at the job site tounload trucks in a safe and timely manner. The Builder will be responsible for all retentioncharges from carriers as a result of job site unloading delays.
Claims for damage or shorts MUST be noted on the Bill-of-Lading or deliveryreceipt and filed against the carrier by the consignee as per VP's Terms of Sales (F.O.B. Plant)under the Uniform Commercial Code. It is critical that damages or shorts be noted on theBill-of-Lading or you have little recourse with the carrier. Immediately upon delivery of material,material quantities are verified by the Builder against quantities billed on the shipping document.Neither the Manufacturer nor the carrier is responsible for material shortages against quantitiesbilled on the shipping document if such shortages are not noted on the shipping documents upondelivery of material and acknowledged by the carriers agent. For materials concealed in bundles,boxes, or crates, shortages must be reported immediately upon unpacking. Should products getwet, bundled and crated materials must be unpacked and unbundled immediately to providedrainage of trapped moisture. See Erection Guide for proper job site storage procedure.
SEALANTS
Sealants shall be applied in strict accordance with VP details or weather tightness will be compromised.Sealant must be applied in temperatures and weather conditions consistent with labeling.
INDEPENDENT MEZZANINES
Independent mezzanines must be designed by a professional engineer. The engineer must ensurethat proper isolation from the VP building has been provided to avoid structural damage due todifferential movements, or inadvertently apply loads to the VP structure. VP accepts noresponsibility for the design of the independent mezzanine.
FIRE CODE COMPLIANCE
It is the responsibility of the project design professional and builder to comply with local fire coderegulations including consideration of, but not limited to, building use and occupancy, all buildingconstruction materials, separation requirements, egress requirements, fire protection systems, etc.Builder shall advise VP of any special requirements to be furnished by VP.
FIELD MODIFICATIONS
Modifications to this building from details and instructions contained on these drawings must beapproved in writing by VP Buildings engineers, or other licensed structural engineer. This includes,but is not limited to, removal of roof or wall cladding, removing or moving any flange braces orrod braces, cutting of openings for doors, windows or RTU's, correction of fabrication errors, etc.The owner shall not impose loads to this structure beyond what is specified for this building inthe contract documents. VP Buildings accepts no responsibility for the consequences of anyunauthorized additions, alterations, or added loads to this structure.
If the builder intends to invoice VP Buildings for modifications in excess of $1000, The buildermust notify VP Buildings immediately, and obtain a Work Authorization from VP Buildings prior toproceeding. All final claims must be submitted to VP Buildings with all supporting documentationwithin 30 days of the building completion. Claims submitted without work authorizations, or after30 days will not be accepted. Correction of minor misfits, shimming and plumbing, moderateamount of reaming, drilling, chipping / cutting and minor welding are considered by Code ofStandard Practice to be part of erection are not subject to claim reimbursement.
CONCRETE/MASONRY/CONVENTIONAL STUD WALLS
The engineer responsible for the design of the wall system is responsible for coordinating with, orspecifying to VP Buildings, any wall to steel compatibility issues such as drift and deflectioncompatibility, special base details, and wall to VP steel connections. All fasteners, sealant andcounter flashing of wall systems are to be provided by contractor. The engineer responsible forthe wall shall design the anchorage to VP supporting elements consistent with Code required forces.
Dade Co. Product Approval (www.miamidade.gov/buildingcode)Approved Products Listed Under Varco Pruden Buildings, Inc.
Underwriter's Laboratory Approvals (Available only when specified in contract)SSR Roof-UL#TGKX-113; SSR Composite Roof Class 90-UL#TGKX-113A;SSR Roof w/Super Block; Class 90-UL#TGKX-328;Panel Rib Roof UL Class 60-UL#TGKX-60; Panel Rib Roof UL Class 90-UL#TGKX-64;VP SLR II Roof Class 90-UL#TGKX-90, -180, -435, -435A, -176, -238, -238A, -238B
Factory Mutual Approved Assemblies (Available only when specified in contract)SSR Roof Systems are approved in various type applications and listed in FM Approval Guide.24 Ga SSR (0.0227" Nominal), is available in Class 1-60, 1-75, 1-90. 22Ga SSR (0.0277"Nominal), is available in Class 1-75, 1-90-, 1-120.
ICC Evaluation Reports (www.icc-es.org)SSR Roof System - #ESR-2527
SLR II Roof Systems are approved in various type applications and listed in FM Approval Guide.24 Ga SLR II (0.0227" Nominal), is available in Class 1-75 and 1-120.
State of Florida Product Approvals (www.floridabuilding.org)
VP TextureClad - See Transamerican Structuroc, Inc.
VP TextureClad - See Transamerican Structuroc, Inc.Approved Products Listed Under VP Buildings, Inc.
(http:/eng.cwbgroup.org/Certification/Pages/CertifiedCompanySearch.aspx)Canadian CSA A660 Certifications
Listed under BlueScope Buildings North America, Inc.IAS AC472 Approvals: (www.iasonline.org/Metal_Building_Systems/MB.html)
Fabricator Approvals
MO#E-2010007736; NC#F-0998; OK#CA4170PE; SD#C-1787; TX#F4828; WV#C03059-00;
Engineering Certifications of AuthorizationUSA--AR#576; FL#30427; ID#C-2470; IL#184-002649; KS#E-29; MS#E-0592;
CAN--AB#P08900; NS#30123; ON#100148796; and YT#PP134
VP BUILDINGS ACCREDITATIONS AND APPROVALS
City of Los Angeles, CA #FB00031; City of Houston, TX 767 & 429;City of Phoenix, AZ C19-02008; Clark County, NV 43 & 833, San Bernardino County, CA 289
Listed under BlueScope Buildings North America, Inc.
Listed under Varco Pruden Buildings, a Division of BlueScope Buildings North America, Inc.IAS AC472 Approvals: (www.iasonline.org/Metal_Building_Systems/MB.html)
Design Approvals
SIGNAGE
The Builder is responsible for furnishing signs as required by Code and the Building Department,including but not limited to, exits, occupancy limits, floor loading limits, and bulk storage limits.Floor loading signs shall clearly indicate maximum floor live load permitted.Bulk storage facilities shall have signs clearly posted on all loaded walls indicating the typeof commodity stored and the maximum storage height. Signs shall be clearly visible whenbuilding is fully loaded to design level. Overloading of floors or walls may result in failure.
State of Utah, City of Richmond, CA.
VP engineers are not Project Engineers or Engineer of Record for the overall project. VP engineeringsupply sealed engineering design data and drawings for VP supplied material as part of the overallproject for use by others to obtain permits, approvals, and coordinate with other trades. All interfaceand/or compatibility of any materials not furnished by VP are to be considered and coordinated bythe builder or A/E firm.
VP must be advised of any structure that is within 20 ft. of VP's building. Load effects fromsnow drifting, wind effects, and seismic separation must be considered for both the new andexisting structures. VP has designed the new VP building for these effects. The owner/builder areresponsible for employing a Professional Engineer to review and verify the existing structure for allload effects from the adjacent VP building.
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D ERECTION NOTES
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
3Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION
11:50:146/25/202022
D1 (4)3/4" Dia. GR36 Anchor RodsPlate W=9" L=1'-9"Dim: A=1'-0"Elev.=100'-1"
D2 (4)3/4" Dia. GR36 Anchor RodsPlate W=8" L=1'-1"Dim: A=1'-0"Elev.=100'-1"
D3 (4)1" Dia. GR36 Anchor RodsPlate W=1'-0" L=1'-7"Dim: A=1'-0"Elev.=100'-0"
D4 (4)1" Dia. GR36 Anchor RodsPlate W=1'-1" L=1'-7"Dim: A=1'-0"Elev.=100'-0"
D5 (4)3/4" Dia. GR36 Anchor RodsPlate W=8" L=1'-4"Dim: A=1'-0"Elev.=100'-1"
D6 (4)3/4" Dia. GR36 Anchor RodsPlate W=1'-0" L=1'-7"Dim: A=1'-0"Elev.=100'-0"
D7 (4)3/4" Dia. GR36 Anchor RodsPlate W=8" L=1'-1"Dim: A=7"Gage=5" Pitch=10" Edge Out=1 1/2"Elev.=109'-10"
D8 (4)3/4" Dia. GR36 Anchor RodsPlate W=8" L=1'-9"Dim: A=1'-0"Elev.=100'-1"
D9 (4)3/4" Dia. GR36 Anchor RodsPlate W=1'-2" L=1'-7"Dim: A=1'-0"Elev.=100'-0"
D10 (4)3/4" Dia. GR36 Anchor RodsPlate W=8" L=1'-5"Dim: A=1'-5"Elev.=123'-0"
D11 (4)3/4" Dia. GR36 Anchor RodsPlate W=1'-1" L=1'-5"Dim: A=1'-0"Elev.=100'-0"
D12 (2)3/4" Dia. GR36 Anchor RodsPlate W=8" L=10"Dim: A=3 1/2"Gage=5" Edge Out=3 1/2"Elev.=123'-0"
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D ANCHOR ROD PLAN - DETAILS
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
4Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION
11:52:416/25/202023
1 1'-0"Dimension Key
2 4'-4 5/8"3 3'-4" J=8.504 3'-11 1/8"5 4'-3"6 2'-0"7 2'-11 1/8"8 4 7/8"9 1'-2"10 3'-11 5/16"11 3'-5"12 10"
1 1'-0"Dimension Key
2 4'-4 5/8"3 3'-4" J=8.504 3'-11 1/8"5 4'-3"6 2'-0"7 2'-11 1/8"8 4 7/8"9 1'-2"10 3'-11 5/16"11 3'-5"12 10"
<*>
<*>
43'-6"
116'-10"16'-10"27'-2"27'-2"1
D1
D2
D2
D3D4D5D6
219'-6 11/16"
19'-6 11/16"
16'-4"
90'-0"
90'-0"
D8D9D9D10D11
16'-4"
3
D12
D12
D12
D12
D12
D12
D12
D12
D12
4 5'-6 3/16" 5'-10 1/4" 5'-10 1/4" 5'-10 1/4" 5'-10 1/4" 5'-10 1/4" 5'-10 1/4" 5'-6 3/16"
6 7 8 9 10 11 12
ANCHOR ROD PLAN
A BL
B
CDEF
G BL
J BL
1
BL
2 3 4 5 67 8 9 10 11 12 13 14 15
BL
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D ANCHOR ROD PLAN
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
5Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION<*> THE BUILDING IS DESIGNED WITH BRACING DIAGONALS IN THE DESIGNATED
BAYS. COLUMN BASE REACTIONS, BASE PLATES AND ANCHOR RODS ARE AFFECTED BY THIS BRACING AND DIAGONALS MAY NOT BE RELOCATED WITHOUT CONSULTING THE BUILDING SUPPLIERS ENGINEER.
Finished Floor Elevation = 100'-0" (Unless Noted Otherwise)
11:52:406/25/202024
1 RKCB15Part Mark Key
2 ESH33 GAC2540
1 4'-6"Dimension Key
2 1'-0"3 4'-4 5/8"4 1 3/8"5 1 11/16"6 3'-11 1/8"7 1 15/16"8 4'-3"
MarkSecondary Part Schedule
Part Thick. Depth Lap DetailE108 00110CS1809415B0 0.0730 10" RSV004,RSV003,RSV002,RSV001E109 10C1609415DDA0 0.0730 10" RSV004,RSV003,RSV002,RSV001E110 10C2701415DDB0 0.0730 10" RSV004,RSV003,RSV002,RSV001E111 00210CS2801415B0 0.0730 10" RSV004,RSV003,RSV002,RSV001E112 00110ES1809414B04 0.0790 10" RS12PF,RS12PEE113 10E1609414DDA04 0.0790 10" BR18G2,RS12PEE114 10E2701414DDB04 0.0790 10" RS12PEE115 00210ES2801414B04 0.0790 10"E116 00310ES2801417B01 0.0600 10" RS12PH,RS12PAE117 00108HS5503411B01 0.1130 8 1/2" RS12PF,BR09Y2,BR09W2,BR18G2,RS12PEE118 10E2701417DDB01 0.0600 10" RS12PAE119 08H1609417DDA01 0.0600 8 1/2" BR09Y2,BR09W2,RS12PEE120 10E1609417DDA01 0.0600 10" RS12PAE121 00208HS1809417B01 0.0600 8 1/2" RS12PF,BR09Y2,BR09W2,RS12PEE122 00410ES1809417B01 0.0600 10" RS12PH,RS12PAP101 00110ZS2003414B0 0.0790 10" 1'-4 1/2" RS02T1,RS11SB,RS01U1P102 10Z190941722A0 0.0600 10" 1'-4 1/2" RS11SB,RS01U1P103 10Z330141444B0 0.0790 10" 2'-10 1/2" RS11SB,RS01U1P104 10Z3201413A5B0 0.0880 10" 3'-10 1/2" RS02T1,RS11SB,RS01U1P105 10Z330141544B0 0.0730 10" 2'-10 1/2" RS01U1P106 00210ZS2003414B0 0.0790 10" 1'-4 1/2" RS02T1,RS01U1P107 00310ZS2003415B0 0.0730 10" 1'-4 1/2" RS02T1,RS11SB,RS01U1P108 10Z3201415A5B0 0.0730 10" 3'-10 1/2" RS02T1,RS01U1P109 10Z330141644B0 0.0680 10" 2'-10 1/2" RS01U1P110 00510ZS2003416B0 0.0680 10" 1'-4 1/2" RS02T1,RS01U1
IdSecondary Bracing Schedule
Qty Mark No Spacing
1 6 CPBRD010804 1'-4"2 54 CPBB040108(Typ.)4'-0"3 6 CPBB020602 2'-4 1/2"4 15 PBA0302 2'-9 7/16"5 5 CPBRE010812 1'-5 5/16"6 5 CPBB021100 2'-9 7/16"7 4 PBA0205 2'-0 13/16"8 18 CPBB030204 3'-0 11/16"9 5 PBA0102 8 1/2"10 5 CPBB030704 3'-5 5/8"11 27 PBA0309 3'-5 5/8"12 10 PBA0108 1'-5 1/8"See SED:BR09PM, BR09RY, BR09RZ, BR09JG, BR09PHBR09JR, BR09JH, BR09PK, BR09K5, BR09K2BR18G2
43'-6"
90'-0"
216'-10"16'-10"27'-2"27'-2"2
45
19'-5"
1R1B1
P104(Typ.)
1R1B2
P105(Typ.)
1R1B3
P102(Typ.)
1R1B4
P106(Typ.)
11
11
12
3
13
13
13
13
13
1R2B1
P107(Typ.)
E1121R2B2
P102(Typ.)
10Z1709414BBA0
E1131R2B3
P105(Typ.)
E1141R2B4
P104(Typ.)
E115
2
11
11
4
52
6
447
56
7744
56
44
56
4
56
4
2
7'-0"
1C1B1
P101(Typ.)
E1081C1B2
P102(Typ.)
E1091C1B3
P103(Typ.)
E1101C1B4
P104(Typ.)
E111
11
33333
8
8
88
8
888
8
888
88
88
88
16'-4"
90'-0"
216'-10"16'-10"27'-2"27'-2"2
215'-4"
1R3B1
P108(Typ.)
E116
1R3B2
00410ZS5503411D0E117
1R3B2
P109(Typ.)
E1181R3B3
E119
P102(Typ.)
E1201R3B4
E121
P110(Typ.)
E122
11
11
9 9
210
11
910
11
11
11
11
12
11
11
10
11
11
11
12
11
10
12
11
12
11
12
11
10
12
11
2
ROOF SECONDARY PLAN
A BL
B
CDEF
G BL
J BL
1
BL
2 3 4 5 67 8 9 10 11 12 13 14 15
BL
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D ROOF SECONDARY PLAN
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
6Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. UNLESS NOTED, USE 1/2 X 1 1/2 A325T BOLT (49080) AND NUT (47120)
W/O WASHERS. SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS.2. FLANGE BRACES ARE AN INTEGRAL PART OF THE STABILITY OF THE
STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTIONOF WALL AND ROOF SHEETS.
3. REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED.
Shape Name = 2020 Addition, Shape = 2020 Addition, Shape = 2020 Addition
11:57:146/25/202025
43'-6"
25'-0 1/2"
5'-9" 37'-9"
A
BL
G
BL
CL
B
CL
E
CL
C
Opening 1-1
16'-4"
37'-7 13/16"
16'-4"
G
BL
J
BL
CL59'-10"
SECONDARY ELEVATION AT 1
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D SECONDARY ELEVATION AT 1
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
12Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. UNLESS NOTED, USE 1/2 X 1 1/2 A325T BOLT (49080) AND NUT (47120)
W/O WASHERS. SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS.2. FLANGE BRACES ARE AN INTEGRAL PART OF THE STABILITY OF THE
STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTIONOF WALL AND ROOF SHEETS.
3. REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED.
Shape Name = 2020 Addition, Wall = 1, Wall = 5
11:59:366/25/202026
IdRod, Strut, and Misc. Connection BoltsQty Grade Bolt Diam. Bolt Length PartNo
1 2 A325 3/4" 2 1/2" 0097284
1 JTG1Part Mark Key
2 PG11 1'-0"
Dimension Key
2 2'-6 1/2"
MarkSecondary Part Schedule
Part Thick. Depth Lap DetailG1 00108ZS050841700 0.0600 8 1/2" BR10F5,WS20F2G502 00308ZS050841700 0.0600 8 1/2" BR10F5,WS20F2G535 00208ZS180941700 0.0600 8 1/2" 10 1/2" WS01G3G536 08Z1809417A100 0.0600 8 1/2" 10 1/2" WS01G3G537 08Z18094171100 0.0600 8 1/2" 10 1/2" WS01G3G538 08Z30014172200 0.0600 8 1/2" 1'-4 1/2" WS01G3G539 00408ZS310141700 0.0600 8 1/2" 2'-10 1/2" BR10F5,WS01G3G540 08Z3101417A400 0.0600 8 1/2" 2'-10 1/2" WS01G3G541 08Z3101416A400 0.0680 8 1/2" 2'-10 1/2" WS01G3J1 00108JS0408217 0.0600 8 1/2" BR10F5,WS20B2,WS20B8J2 00208JS0408217 0.0600 8 1/2" BR10F5,WS20B2,WS20B8
PartBracing Part Schedule
Qty Length Detail3BSB1410614 1 15'-4 3/4" BR15J110RU1900 2 19'-0" BR02K107RS2202 2 22'-2" BR01G2
90'-0"
25'-0 1/2"
1 16'-10" 16'-10" 27'-2" 27'-2" 1
15
BL
1
BL
CL CL
13
CL
12
CL
7
CL
1
22
J1
6'-0"
1W2B1
G1
G535
G536(Typ.)
1W2B2
G537(Typ.)
1W2B3
G538(Typ.)
1
22
J2
6'-0"
1W2B4
G502
G539
G540
G541
G541
G540
3@2'-6"
3@5'-0"
2
1 13BSB1410614
10RU1900
10RU1900
07RS2202
07RS2202
SECONDARY ELEVATION AT A
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D SECONDARY ELEVATION AT A
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
13Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. UNLESS NOTED, USE 1/2 X 1 1/2 A325T BOLT (49080) AND NUT (47120)
W/O WASHERS. SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS.2. FLANGE BRACES ARE AN INTEGRAL PART OF THE STABILITY OF THE
STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTIONOF WALL AND ROOF SHEETS.
3. REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED.
Shape Name = 2020 Addition, Wall = 2
11:59:466/25/202027
IdCovering Schedule
Qty Type Start Length Gage OP Fin. Color Increment Direction#3 8 VR 31'-5 3/4" 26 1 K TD -1'-0" Left to Right#4 8 VR 32'-1 1/8" 26 1 K TD 7 1/8" Right to Left#5 5 VR 36'-7 1/2" 26 1 K TD -2 5/16" Left to RightOper. Code:1=SQ,SQFinish:K=KXL (Kynar)Color:TD=Standard Color
IdTrim Schedule
Parts Color DetailsT1 (2.9)BG2415,(5)BT10 Patrician Bronze EN52B1,ENV007,RC00A1,WC01AB,WC04H1,WS27B2,WS27D2T2 (2)ELTA10,ELTA05,(2)GAC1024,(2)CNA1064R,(8)CNA2042R,CNA1052R Match Wall Color RC80E2,RC80E3,RC80G1,RC80G4,WC12A2T3 (2)ELTA10,ELTA05,(2)GAC1024,5CN1110R,(3)CNA1090R,(8)CNA2042R,CNA1065RMatch Wall Color RC80E2,RC80E3,RC80G1,RC80G4,WC12A2T4 DFT10,JT07 Cool Dark Bronze WC24B1T5 DFT05,HTS05 Cool Dark Bronze WC24B2T6 (0.9)BG2415,(2)BT10 Patrician Bronze EN52B1,ENV007,RC00A1,WC01AB,WC04H1,WS27B2,WS27D2T7 (2)ELTB10,GAC1024,1CN2004R,(3)CNA2011R,(4)CNA2042R,CNA1007R,1CN0115RMatch Wall Color RC80E2,RC80E3,RC80G1,RC80G4,WC12A2T8 (3)AFT20,(2)CTE20 Match Wall Color WC20B2
PartFastener Schedule
Description0097597STD (T-2) #17/#12-14 x 1 7/8" Stand-Off, 5/16" Hex Hd, SS Cap w/WasherRoof Struct 1 1/2 SS(T-2) #12-14 x 1 1/2", 5/16" Hex Hd, SS Cap w/WasherRoof Stitch 7/8 SS(T-1) 1/4-14 x 7/8", 5/16" Hex Hd, SS Cap w/Washer0097585-105 (T-2) #12-14 x 1 1/2", 5/16" Hex Hd, SS Cap w/Washer
1 1'-9"Dimension Key
2 3'-4"
43'-6"
36'-7 5/16"
25'-0 1/2"
G
BL
A
BL
31'-5 3/4"
30'-5 3/4"
29'-5 5/8"
28'-5 5/8"
27'-5 5/8"
26'-5 5/8"
25'-5 5/8"
24'-5 1/2"
(8)#3
32'-1 1/8"
32'-8 1/4"
33'-3 3/8"
33'-10 1/2"
34'-5 5/8"
35'-0 5/8"
35'-7 3/4"
36'-2 7/8"
(8)#4
T1
T2
T3
16'-4"
37'-7 13/16"
36'-7 5/16"
J
BL
G
BL
36'-7 1/2"
36'-5 1/4"
36'-2 7/8"
36'-0 5/8"
35'-10 1/4"
(5)#5
T4
T4
T5
T6-1'-9" T6-11'-3"
T7
T8
59'-10"
1 2 11'-3" 43'-6"
COVERING ELEVATION AT 15
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D COVERING ELEVATION AT 15
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
14Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS
MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERSTO STRUCTURAL BEAMS
2. STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM.REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED.
3. DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIREFIELD CUTTING, SEE THE COVERING SCHEDULE FOR CUT LENGTHS.
4. SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION.
Shape Name = 2020 Addition, Wall = 3, Wall = 7
12:00:026/25/202028
IdRod, Strut, and Misc. Connection BoltsQty Grade Bolt Diam. Bolt Length PartNo
1 2 A325 3/4" 2 1/2" 0097284
1 JTG1Part Mark Key
2 G561(Typ.)3 H14 PG15 H236 G5287 GFA1068 GFA200
1 1'-0"Dimension Key
2 3'-11 1/8"3 4'-3"4 2'-0"5 2'-11 1/8"6 4 7/8"7 1'-2"8 3'-11 5/16"9 3'-5"10 10"
MarkSecondary Part Schedule
Part Thick. Depth Lap DetailG173 08Z0407517AG00 0.0600 8 1/2" WS01K2G174 08Z0411517GG00 0.0600 8 1/2" WS01K2G175 08Z0503617GG00 0.0600 8 1/2" WS01K2G502 00308ZS050841700 0.0600 8 1/2" BR10F5,WS20F2G527 08Z0605417AD00 0.0600 8 1/2"G528 JCP051100 0.0600 8 1/2" BR10F5,WS20F2G536 08Z1809417A100 0.0600 8 1/2" 10 1/2" WS01G3G537 08Z18094171100 0.0600 8 1/2" 10 1/2" WS01G3G546 08Z0411417G100 0.0600 8 1/2" 10 1/2" WS01G3,WS01K2G561 01008ZS010841700 0.0600 8 1/2" BR10F5,WS20F2G562 01108ZS060541700 0.0600 8 1/2"G563 01208ZS180741700 0.0600 8 1/2" 10 1/2" WS01G3G564 01308ZS180941700 0.0600 8 1/2" 10 1/2" BR10F5,WS01G3H1 DHC0304017 0.0000 8 1/2" WS21D7H19 00008JS0503617 0.0600 8 1/2" WS01K2H23 00008JS0307617 0.0600 8 1/2" WS01K2H25 00408JS0807517 0.0600 8 1/2" WS01K2J1 00108JS0408217 0.0600 8 1/2" BR10F5,WS20B2,WS20B8J2 00208JS0408217 0.0600 8 1/2" BR10F5,WS20B2,WS20B8J3 00308JS0702217 0.0600 8 1/2" WS20F2,WS20B2,WS20B8J4 0.0880 8 1/2"
PartBracing Part Schedule
Qty Length Detail3BSB1508614 1 16'-2 3/4" BR15J106RS2403 2 24'-3" BR01G206RS2506 2 25'-6" BR01G2
90'-0"
37'-7 13/16"
1 2 5'-6 3/16" 5'-10 1/4" 5'-10 1/4" 5'-10 1/4" 5'-10 1/4" 5'-10 1/4" 5'-10 1/4" 5'-6 3/16" 3 16'-10" 16'-10" 1
1
BL
15
BL
CLCL
13
CL
12
CL
7
CL CL
11
CL
10
CL
9
CL
8
CL
6
CL
5
CL
4
CL
3
CL
2
1
1
1W8B0
2
3
44
J3
G562
G527(Typ.)
G173
G173
44
J1
6'-0"
1
44
J3
5
J4
6
G174(Typ.)
H19
1W8B3
G175(Typ.)
H19
1W8B4
G175(Typ.)
H19
1W8B5
G175(Typ.)
H19
1W8B7
G175(Typ.)
H19
1W8B8
G175(Typ.)
H19
1W8B9
G175(Typ.)
H25
1W8B10
G174(Typ.)
J4
G546(Typ.)
1W8B12
G563(Typ.)
G537
G537
1
44
J2
6'-0"
1W8B13
G502
G564
G536(Typ.)
3@2'-6"
5@5'-0"
5'-1 13/16"
4 5 6 7 8 9 10
7'-2"
23'-0"
23'-0"
23'-0"
23'-0"
23'-0"
23'-0"
23'-0"
23'-0"
7
7
8
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
1 13BSB1508614
06RS2403
06RS2403
06RS2506
06RS2506
SECONDARY ELEVATION AT J
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D SECONDARY ELEVATION AT J
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
15Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. UNLESS NOTED, USE 1/2 X 1 1/2 A325T BOLT (49080) AND NUT (47120)
W/O WASHERS. SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS.2. FLANGE BRACES ARE AN INTEGRAL PART OF THE STABILITY OF THE
STRUCTURAL SYSTEM AND MUST BE PROPERLY INSTALLED PRIOR TO ERECTIONOF WALL AND ROOF SHEETS.
3. REMOVAL OR ALTERATION OF ANY COMPONENT IS PROHIBITED.
Shape Name = 2020 Addition, Wall = 8
12:00:146/25/202029
IdTrim Schedule
Parts Color DetailsT1 (1.5)AFT16,(1.5)AFT10,CTE16,CTE10 Match Wall Color WC20B2T2 (3)CRK16,(5)RCL10,(5)RFR10-130,(5)RSB10,(5)RSC10 Match Roof Color ENV004,RC30H1,RC38GB,RCV067,RS10L5T3 (3)AFT20,(2)CTE20 Match Wall Color WC20B2T4 CRK20,(2)RFR10-130,(2)RSB10,(2)RSC10 Match Roof Color ENV004,RC30G1,RC38GB,RCV067,RS10L5
43'-6"
25'-0 1/2"
36'-7 5/16"
A
BL
G
BL
Opening 1-1
T1
T2-22'-1"
T2-23'
-0 1/4
"
16'-4"
36'-7 5/16"
37'-7 13/16"
G
BL
J
BL
Opening 5-1
T3
T4
59'-10"
43'-6" 16'-4"
COVERING ELEVATION AT 1
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D COVERING ELEVATION AT 1
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
16Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS
MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERSTO STRUCTURAL BEAMS
2. STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM.REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED.
3. DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIREFIELD CUTTING, SEE THE COVERING SCHEDULE FOR CUT LENGTHS.
4. SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION.
Shape Name = 2020 Addition, Wall = 1, Wall = 5
12:00:346/25/202030
IdCovering Schedule
Qty Type Start Length Gage OP Fin. Color Direction#1 30 VR 25'-1" 26 1 K TD Left to RightOper. Code:1=SQ,SQFinish:K=KXL (Kynar)Color:TD=Standard Color
IdTrim Schedule
Parts Color DetailsT1 (6)BG2415,(9)BT10 Patrician Bronze EN52B1,ENV007,RC00A1,WC01AB,WC04H1,WS27B2,WS27D2T2 (1.5)AFT16,(1.5)AFT10,CTE16,CTE10 Match Wall Color WC20B2T3 5CE75,(3)CP510,DN1,(6)DST1 Match Wall Color RC38P1
PartFastener Schedule
Description0097597STD (T-2) #17/#12-14 x 1 7/8" Stand-Off, 5/16" Hex Hd, SS Cap w/WasherRoof Struct 1 1/2 SS(T-2) #12-14 x 1 1/2", 5/16" Hex Hd, SS Cap w/WasherRoof Stitch 7/8 SS(T-1) 1/4-14 x 7/8", 5/16" Hex Hd, SS Cap w/Washer
90'-0"
25'-0 1/2"
15
BL
1
BL
(30)#1
T1
T2
T3
T3
T3
T3
COVERING ELEVATION AT A
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D COVERING ELEVATION AT A
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
17Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS
MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERSTO STRUCTURAL BEAMS
2. STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM.REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED.
3. DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIREFIELD CUTTING, SEE THE COVERING SCHEDULE FOR CUT LENGTHS.
4. SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION.
Shape Name = 2020 Addition, Wall = 2
12:00:476/25/202031
IdCovering Schedule
Qty Type Start Length Gage OP Fin. Color Increment Direction#3 8 VR 31'-5 3/4" 26 1 K TD -1'-0" Left to Right#4 8 VR 32'-1 1/8" 26 1 K TD 7 1/8" Right to Left#5 5 VR 36'-7 1/2" 26 1 K TD -2 5/16" Left to RightOper. Code:1=SQ,SQFinish:K=KXL (Kynar)Color:TD=Standard Color
IdTrim Schedule
Parts Color DetailsT1 (2.9)BG2415,(5)BT10 Patrician Bronze EN52B1,ENV007,RC00A1,WC01AB,WC04H1,WS27B2,WS27D2T2 (2)ELTA10,ELTA05,(2)GAC1024,(2)CNA1064R,(8)CNA2042R,CNA1052R Match Wall Color RC80E2,RC80E3,RC80G1,RC80G4,WC12A2T3 (2)ELTA10,ELTA05,(2)GAC1024,5CN1110R,(3)CNA1090R,(8)CNA2042R,CNA1065RMatch Wall Color RC80E2,RC80E3,RC80G1,RC80G4,WC12A2T4 DFT10,JT07 Cool Dark Bronze WC24B1T5 DFT05,HTS05 Cool Dark Bronze WC24B2T6 (0.9)BG2415,(2)BT10 Patrician Bronze EN52B1,ENV007,RC00A1,WC01AB,WC04H1,WS27B2,WS27D2T7 (2)ELTB10,GAC1024,1CN2004R,(3)CNA2011R,(4)CNA2042R,CNA1007R,1CN0115RMatch Wall Color RC80E2,RC80E3,RC80G1,RC80G4,WC12A2T8 (3)AFT20,(2)CTE20 Match Wall Color WC20B2
PartFastener Schedule
Description0097597STD (T-2) #17/#12-14 x 1 7/8" Stand-Off, 5/16" Hex Hd, SS Cap w/WasherRoof Struct 1 1/2 SS(T-2) #12-14 x 1 1/2", 5/16" Hex Hd, SS Cap w/WasherRoof Stitch 7/8 SS(T-1) 1/4-14 x 7/8", 5/16" Hex Hd, SS Cap w/Washer0097585-105 (T-2) #12-14 x 1 1/2", 5/16" Hex Hd, SS Cap w/Washer
1 1'-9"Dimension Key
2 3'-4"
43'-6"
36'-7 5/16"
25'-0 1/2"
G
BL
A
BL
31'-5 3/4"
30'-5 3/4"
29'-5 5/8"
28'-5 5/8"
27'-5 5/8"
26'-5 5/8"
25'-5 5/8"
24'-5 1/2"
(8)#3
32'-1 1/8"
32'-8 1/4"
33'-3 3/8"
33'-10 1/2"
34'-5 5/8"
35'-0 5/8"
35'-7 3/4"
36'-2 7/8"
(8)#4
T1
T2
T3
16'-4"
37'-7 13/16"
36'-7 5/16"
J
BL
G
BL
36'-7 1/2"
36'-5 1/4"
36'-2 7/8"
36'-0 5/8"
35'-10 1/4"
(5)#5
T4
T4
T5
T6-1'-9" T6-11'-3"
T7
T8
59'-10"
1 2 11'-3" 43'-6"
COVERING ELEVATION AT 15
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D COVERING ELEVATION AT 15
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
18Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS
MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERSTO STRUCTURAL BEAMS
2. STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM.REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED.
3. DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIREFIELD CUTTING, SEE THE COVERING SCHEDULE FOR CUT LENGTHS.
4. SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION.
Shape Name = 2020 Addition, Wall = 3, Wall = 7
12:00:596/25/202032
IdCovering Schedule
Qty Type Start Length Gage OP Fin. Color Direction#6 15 VR 37'-8 7/8" 26 1 K TD Left to Right#7 15 VR 14'-8 3/8" 26 1 K TD Left to RightOper. Code:1=SQ,SQFinish:K=KXL (Kynar)Color:TD=Standard Color
IdTrim Schedule
Parts Color DetailsT1 DFT14,DFT10,JT14,JT10 Cool Dark Bronze WC24B1T2 (3)DFT14,DFT10,(3)HTS14,HTS10 Cool Dark Bronze WC24B2T3 DFT10,JT07 Cool Dark Bronze WC24B1T4 DFT05,HTS05 Cool Dark Bronze WC24B2T5 (2.6)BG2415,(4)BT10 Patrician Bronze EN52B1,ENV007,RC00A1,WC01AB,WC04H1,WS27B2,WS27D2T6 (9)EST102,(4)HEF201,HEF121,(9)RFR10-130,(68)SLRC2 Match Roof Color RC35F1,RC38M5,WC13F1
PartFastener Schedule
Description0097597STD (T-2) #17/#12-14 x 1 7/8" Stand-Off, 5/16" Hex Hd, SS Cap w/WasherRoof Struct 1 1/2 SS(T-2) #12-14 x 1 1/2", 5/16" Hex Hd, SS Cap w/Washer0097585-105 (T-2) #12-14 x 1 1/2", 5/16" Hex Hd, SS Cap w/WasherRoof Stitch 7/8 SS(T-1) 1/4-14 x 7/8", 5/16" Hex Hd, SS Cap w/Washer
1 2'-0"Dimension Key
2 3'-4"3 1'-2"
90'-0"
37'-7 13/16"
1
BL
15
BL
(3)#6
(15)#7
(12)#6
T1
T1
T2
T3
T3
T4
T5-35'-6"T5-2'-0" T5-1'-2"
T6
1 2 3 48'-0" 35'-6"
COVERING ELEVATION AT J
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D COVERING ELEVATION AT J
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
19Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. PRE-DRILLING 1/8 DIAMETER HOLES FOR STRUCTURAL FASTENERS
MAY BE REQUIRED FOR HEAVY GAGE NESTED ZEE's AND/OR FASTENERSTO STRUCTURAL BEAMS
2. STEEL PANELS ARE AN INTEGRAL PART OF THE STRUCTURAL SYSTEM.REMOVAL OR ALTERATION WITHOUT PRIOR AUTHORIZATION IS PROHIBITED.
3. DUE TO MANUFACTURING LIMITATIONS SHORT PANELS MAY REQUIREFIELD CUTTING, SEE THE COVERING SCHEDULE FOR CUT LENGTHS.
4. SEE JOB DETAILS FOR COVERING AND TRIM FASTENER SPECIFICATION.
Shape Name = 2020 Addition, Wall = 8
12:01:106/25/202033
PartFrame Member Schedule
Mem Width Thick WebThk. Depth1 Depth2 Approx.Lgth Approx.Weight DetailCBX005 10001 5.0000 .2500 .1345 9" 9" 7'-11 1/2" 107#CX005 1 10.0000 .3750 .1875 1'-6" 1'-6" 24'-10 9/16" 1033#RBX010 2 6.0000 .2500 .2500 3'-2" 3'-2" 20'-10 11/16" 902#
3 6.0000 .2500 .1875 3'-2" 3'-2"RBX011 4 6.0000 .2500 .1875 3'-2" 3'-2" 21'-11 11/16" 799#
5 6.0000 .2500 .1875 3'-2" 3'-2"TCX004 8 HSS7X7X.188 7" 7" 12'-9 7/16" 229# BR25A3RBX016 6 5.0000 .2500 .2500 3'-2" 3'-2" 14'-2 1/2" 625#CX010 7 12.0000 .5000 .1345 1'-4" 1'-4" 36'-9 3/16" 1884#WRX005 50001 W14X22 1'-1 11/16" 1'-1 11/16" 4'-6 1/2" 100#
IdBolt Connection & Plate Schedule
Qty Grade Bolt Bolt Plate Rows Rows PartNoDia. Length Thick. Out In
A 4 A325 3/4" 2 1/2" 5/8" 1 1 0097284B 8 A325 3/4" 2 1/2" 5/8" 2 2 0097284C 12 A325 3/4" 2 1/2" 3/8" 2 4 0097284D 4 A325 3/4" 2 1/2" 3/8" 1 3 0097284E 10 A325 3/4" 2 1/2" 1/2" 3 2 0097284<S> - (2) Washers (095872) req'd at Flange Brace to Secondary.
Vert. Clearance at member 1(CX005): 21'-3 7/8"Frame Clearances
Vert. Clearance at member 7(CX010): 33'-3 3/8"Finished Floor Elevation = 100'-0" (Unless Noted Otherwise)
1 21'-11 11/16"Dimension Key
2 8 1/2"3 3 @ 2'-6"4 2'-6 1/2"5 1'-5 5/16"6 2 @ 2'-9 7/16"7 2 @ 2'-4 1/2"8 1'-4"9 1'-6 3/8"10 2 @ 3'-0 11/16"11 32'-4"12 7'-7 11/16" 5.259:1213 1'-5 1/8"14 2 @ 4'-0"15 2 @ 3'-5 5/8"16 4'-1"17 5 1/2"
5'-9" 37'-9"
A
BL
G
BL
CL
B
43'-6"7'-0"
1
2
33 @ 5'-0"
4
GFB4071
GFB4071
GFB4075<S>
GFB4071
5
4 @ 4'
-0"
6
GFB4071
GFB4071
GFB4071
7
4 @ 4'-0"
8
GFB2037
9
10
21'-11 11/16"
11
23'-0
1/4" 4
.008:1
2
22'-1" 2.3
68:12
12
CBX005
CX005
RBX010
RBX011
TCX004
A
B
C
D
109'-10"
G
BL
J
BL
16'-4"
GFB4071
GFB4071
EAP2
1314
15
2
35 @ 5'-0"
5'-1 13/16"
37'-7 13/16"
16'-4 3/8" 0.765:12
RBX016
CX010
E
D
4'-6 1/2"
1617
WRX005
FRAME CROSS SECTION AT FRAME LINE(S) 1
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D FRAME CROSS SECTION AT FRAME LINE(S) 1
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
7Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. USE 1/2 X 1 1/2 A325T BOLT (49080) AND NUT (47120)
W/O WASHERS. SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS,SECONDARY CLIP CONNECTIONS, AND FLANGE BRACE CONNECTIONS,UNLESS NOTED OTHERWISE.
2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAMESIDE OF THE WEB AS THE HILLSIDE WASHER.
Shape Name = 2020 Addition Wall 2, Frame 5 , Shape = 2020 Addition Wall 6, Frame 5 , Shape = 2020 Addition Wall 1, Frame 5
12:05:476/25/202034
PartFrame Member Schedule
Mem Width Thick WebThk. Depth1 Depth2 Approx.Lgth Approx.Weight DetailCBX004 10001 5.0000 .2500 .1345 1'-2" 1'-2" 7'-11 3/8" 129#CX004 1 6.0000 .2500 .1345 1'-3" 1'-3" 24'-8 5/8" 471#RBX008 2 6.0000 .3750 .2500 2'-8" 2'-8" 21'-2 1/8" 1049#
3 6.0000 .6250 .1875 2'-8" 3'-3"RBX009 4 12.0000 .5000 .1875 3'-3" 3'-3" 11'-11 11/16" 934#TCX003 7 HSS5X5X.125 5" 5" 13'-3 3/4" 118# BR25A3RBX015 5 12.0000 .5000 .2500 3'-3" 3'-3" 23'-9 1/4" 1856#CX009 6 5.0000 .1875 .1345 1'-4" 1'-4" 13'-8 15/16" 235#WRX005 50001 W14X22 0'-0" 0'-0" 4'-6 1/2" 100#
IdBolt Connection & Plate Schedule
Qty Grade Bolt Bolt Plate Rows Rows PartNoDia. Length Thick. Out In
A 6 A325 3/4" 2 1/2" 5/8" 2 1 0097284B 2 A325 3/4" 2 1/2" 3/8" 1 1 0097284C 10 A325 3/4" 2 1/2" 5/8" 1 4 0097284D 6 A325 3/4" 2 1/2" 1/2" 1 3 0097284E 2 A325 3/4" 2 1/2" 1/2" 1 1 0097284<S> - (2) Washers (095872) req'd at Flange Brace to Secondary.
Vert. Clearance at member 1(CX004): 21'-11 9/16"Frame Clearances
Vert. Clearance at member 6(CX009): 33'-3 5/16"Finished Floor Elevation = 100'-0" (Unless Noted Otherwise)
1 21'-11 11/16"Dimension Key
2 8 1/2"3 2'-6"4 2'-6 1/2"5 1'-5 5/16"6 2 @ 2'-9 7/16"7 2 @ 2'-4 1/2"8 1'-4"9 1'-6 3/8"10 2 @ 3'-0 11/16"11 32'-4"12 7'-7 11/16" 5.259:1213 1'-1"14 1'-5 1/8"15 2 @ 4'-0"16 2 @ 3'-5 5/8"17 4'-1"18 5 1/2"
5'-9" 37'-9"
A
BL
G
BL
CL
B
43'-6"7'-0"
1
2
GFB2063
(2)GFB2063
5'-0"
33 @ 5'-0"
4
GFB4071
GFB4030<S>
(2)GFB4027
ESBSC
5
4 @ 4'
-0"
6
GFB4071
GFB4071
ESBSC
7
4 @ 4'-0"
8
(2)GFB2063
9
10
21'-11 11/16"
11
23'-0
1/4" 4
.008:1
2
22'-1" 2.3
68:12
12
CBX004
CX004
RBX008
RBX009
TCX003
ABB
C
D
100'-1"
109'-10"
15'-3" 13
G
BL
J
BL16'-4"
1415
16
37'-7 13/16"
16'-4 3/8" 0.765:12
RBX015
CX009
E
D
E
123'-0"
4'-6 1/2"
1718
WRX005
FRAME CROSS SECTION AT FRAME LINE(S) 7
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D FRAME CROSS SECTION AT FRAME LINE(S) 7
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
8Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. USE 1/2 X 1 1/2 A325T BOLT (49080) AND NUT (47120)
W/O WASHERS. SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS,SECONDARY CLIP CONNECTIONS, AND FLANGE BRACE CONNECTIONS,UNLESS NOTED OTHERWISE.
2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAMESIDE OF THE WEB AS THE HILLSIDE WASHER.
Shape Name = 2020 Addition Wall 2, Frame 4 , Shape = 2020 Addition Wall 6, Frame 4 , Shape = 2020 Addition Wall 1, Frame 15
12:08:066/25/202035
PartFrame Member Schedule
Mem Width Thick WebThk. Depth1 Depth2 Approx.Lgth Approx.Weight DetailCBX003 10001 5.0000 .2500 .1345 11" 11" 7'-11 5/8" 116#CX003 1 12.0000 .5000 .1644 1'-6" 1'-6" 24'-10 7/16" 1423#RBX006 2 6.0000 .3125 .3125 3'-7" 3'-7" 20'-10 13/16" 1251#
3 6.0000 .3125 .2500 3'-7" 3'-7"RBX007 4 5.0000 .3750 .2500 3'-7" 3'-7" 21'-11 11/16" 1135#
5 5.0000 .3750 .2500 3'-7" 3'-7"TCX002 8 HSS5X5X.125 5" 5" 12'-4 3/16" 110# BR25A3RBX014 6 5.0000 .3750 .2500 3'-7" 3'-9" 14'-0 1/2" 712#CX008 7 13.0000 .7500 .1345 1'-6" 1'-6" 36'-9 1/4" 2766#WRX005 50001 W14X22 0'-0" 0'-0" 4'-6 1/2" 100#
IdBolt Connection & Plate Schedule
Qty Grade Bolt Bolt Plate Rows Rows PartNoDia. Length Thick. Out In
A 6 A325 3/4" 2 1/2" 5/8" 2 1 0097284B 16 A325 3/4" 2 1/2" 5/8" 4 4 0097284C 6 A325 3/4" 2 1/2" 1/2" 1 2 0097284D 3 A325 3/4" 2 1/2" 3/8" 1 2 0097284<S> - (2) Washers (095872) req'd at Flange Brace to Secondary.
Vert. Clearance at member 1(CX003): 20'-10 3/4"Frame Clearances
Vert. Clearance at member 7(CX008): 32'-11"Finished Floor Elevation = 100'-0" (Unless Noted Otherwise)
1 21'-11 11/16"Dimension Key
2 8 1/2"3 2'-6"4 2'-6 1/2"5 1'-5 5/16"6 2 @ 2'-9 7/16"7 2 @ 2'-4 1/2"8 1'-4"9 1'-6 3/8"10 2 @ 3'-0 11/16"11 32'-4"12 7'-7 11/16" 5.259:1213 1'-5 1/8"14 2 @ 4'-0"15 2 @ 3'-5 5/8"16 4'-1"17 5 1/2"
5'-9" 37'-9"
A
BL
G
BL
CL
B
43'-6"7'-0"
1
2
5'-0"
33 @ 5'-0"
4
GFB5057
GFB5057
GFB5072<S>
(2)GFB5057
EAP1
ESBSC
5
4 @ 4'
-0"
6
GFB5057
GFB5057
GFB5057
ESBSC
7
4 @ 4'-0"
8
(2)GFB2050
9
10
21'-11 11/16"
11
23'-0
1/4" 4
.008:1
2
22'-1" 2.3
68:12
12
CBX003
CX003
RBX006
RBX007
TCX002
A
B
C
D
109'-10"
G
BL
J
BL
16'-4"
(2)GFB5077
GFB5057
EAP1
ESBSB
1314
15
2
5'-0"
35 @ 5'-0"
5'-1 13/16"
37'-7 13/16"
16'-4 3/8" 0.765:12
RBX014
CX008
D
4'-6 1/2"
1617
WRX005
FRAME CROSS SECTION AT FRAME LINE(S) 12
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D FRAME CROSS SECTION AT FRAME LINE(S) 12
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
9Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. USE 1/2 X 1 1/2 A325T BOLT (49080) AND NUT (47120)
W/O WASHERS. SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS,SECONDARY CLIP CONNECTIONS, AND FLANGE BRACE CONNECTIONS,UNLESS NOTED OTHERWISE.
2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAMESIDE OF THE WEB AS THE HILLSIDE WASHER.
Shape Name = 2020 Addition Wall 2, Frame 3 , Shape = 2020 Addition Wall 6, Frame 3 , Shape = 2020 Addition Wall 1, Frame 16
12:08:526/25/202036
PartFrame Member Schedule
Mem Width Thick WebThk. Depth1 Depth2 Approx.Lgth Approx.Weight DetailCBX002 10001 5.0000 .2500 .1345 9" 9" 7'-11 1/2" 107#CX002 1 10.0000 .3750 .1644 1'-6" 1'-6" 24'-10 9/16" 1027#RBX004 2 6.0000 .2500 .2500 3'-5" 3'-5" 20'-10 11/16" 957#
3 6.0000 .2500 .1875 3'-5" 3'-5"RBX005 4 6.0000 .2500 .1875 3'-5" 3'-5" 21'-11 11/16" 848#
5 6.0000 .2500 .1875 3'-5" 3'-5"TCX001 8 HSS10X10X.188 10" 10" 12'-6 1/4" 333# BR25A3RBX013 6 6.0000 .2500 .1875 3'-5" 3'-5" 14'-0 1/2" 602#CX007 7 13.0000 .7500 .1345 1'-6" 1'-6" 36'-9 1/4" 2883#WRX005 50001 W14X22 0'-0" 0'-0" 4'-6 1/2" 100#
IdBolt Connection & Plate Schedule
Qty Grade Bolt Bolt Plate Rows Rows PartNoDia. Length Thick. Out In
A 4 A325 3/4" 2 1/2" 5/8" 1 1 0097284B 10 A325 3/4" 2 1/2" 5/8" 2 3 0097284C 8 A325 3/4" 2 1/2" 3/8" 1 3 0097284D 3 A325 3/4" 2 1/2" 3/8" 1 2 0097284E 8 A325 1 1/8" 4" 3/4" 2 2 0097289<S> - (2) Washers (095872) req'd at Flange Brace to Secondary.
Vert. Clearance at member 1(CX002): 21'-3 1/16"Frame Clearances
Vert. Clearance at member 7(CX007): 33'-2 1/2"Finished Floor Elevation = 100'-0" (Unless Noted Otherwise)
1 21'-11 11/16"Dimension Key
2 8 1/2"3 2'-6"4 2'-6 1/2"5 1'-5 5/16"6 2 @ 2'-9 7/16"7 2 @ 2'-4 1/2"8 1'-4"9 2 @ 0'-0"10 1'-6 3/8"11 2 @ 3'-0 11/16"12 32'-4"13 7'-7 11/16" 5.259:1214 1'-5 1/8"15 2 @ 4'-0"16 2 @ 3'-5 5/8"17 4'-1"18 5 1/2"
5'-9" 37'-9"
A
BL
G
BL
CL
B
43'-6"7'-0"
1
2
5'-0"
33 @ 5'-0"
4
GFB4093
GFB4093
GFB4100<S>
GFB4093
EAP1
ESBSC
5
4 @ 4'
-0"
6
GFB4093
GFB4093
GFB4093
ESBSC
7
4 @ 4'-0"
8
(2)GFB2037
10
11
21'-11 11/16"
12
23'-0
1/4" 4
.008:1
2
22'-1" 2.3
68:12
13
CBX002
CX002
RBX004
RBX005
TCX001
A
B
C
D
109'-10"
G
BL
J
BL
16'-4"
GFB4093
GFB4093
EAP1
ESBSB
1415
16
2
5'-0"
35 @ 5'-0"
5'-1 13/16"
37'-7 13/16"
16'-4 3/8" 0.765:12
RBX013
CX007
E
D
4'-6 1/2"
1718
WRX005
FRAME CROSS SECTION AT FRAME LINE(S) 13
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D FRAME CROSS SECTION AT FRAME LINE(S) 13
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
10Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. USE 1/2 X 1 1/2 A325T BOLT (49080) AND NUT (47120)
W/O WASHERS. SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS,SECONDARY CLIP CONNECTIONS, AND FLANGE BRACE CONNECTIONS,UNLESS NOTED OTHERWISE.
2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAMESIDE OF THE WEB AS THE HILLSIDE WASHER.
Shape Name = 2020 Addition Wall 2, Frame 2 , Shape = 2020 Addition Wall 6, Frame 2 , Shape = 2020 Addition Wall 1, Frame 17
12:09:206/25/202037
PartFrame Member Schedule
Mem Width Thick WebThk. Depth1 Depth2 Approx.Lgth Approx.Weight Detail Cee Mark NoCBX001 10001 5.0000 .1875 .1345 9" 9" 7'-11 11/16" 89#CX001 1 8.0000 .3750 .1875 1'-8" 1'-8" 24'-10 3/16" 905#RBX001 2 6.0000 .3750 .1345 2'-1" 2'-1" 9'-0" 285#RBX002 3 5.0000 .1875 .1345 2'-1" 2'-1" 12'-4 11/16" 265#
4 5.0000 .1875 .1644 2'-1" 2'-1"RBX003 5 5.0000 .1875 .1345 2'-1" 2'-1" 21'-11 11/16" 435#
6 5.0000 .1875 .1345 2'-1" 2'-1"EPX001 9 5.0000 .2500 .1644 1'-0" 1'-0" 28'-5 13/16" 450# BR25DH JCP053077EPX002 10 5.0000 .2500 .1644 1'-0" 1'-0" 32'-8 3/4" 514# BR25A3RBX012 7 5.0000 .1875 .1345 2'-1" 2'-1" 13'-10 1/4" 280#CX006 8 6.0000 .2500 .1345 1'-8" 1'-8" 36'-8 1/4" 762#WRX007 50001 W14X22 1'-1 11/16" 1'-1 11/16" 19'-6 11/16" 430#WRX008 50001 W14X22 1'-1 11/16" 1'-1 11/16" 18'-4 3/16" 404#
IdBolt Connection & Plate Schedule
Qty Grade Bolt Bolt Plate Rows Rows PartNoDia. Length Thick. Out In
A 6 A325 1/2" 2" 1/2" 2 1 0097280B 16 A325 3/4" 2 1/2" 5/8" 4 4 0097284C 6 A325 3/4" 2 1/2" 3/8" 1 2 0097284D 4 A325 3/4" 2 1/2" 3/8" 1 1 0097284E 2 A325 3/4" 2 1/2" 3/8" 1 1 0097284F 4 A325 1/2" 1 1/2" 3/8" 1 1 49080G 4 A325 3/4" 2 1/2" 1/2" 1 1 0097284<S> - (2) Washers (095872) req'd at Flange Brace to Secondary.
Vert. Clearance at member 1(CX001): 22'-6 1/4"Frame Clearances
Vert. Clearance at member 9(EPX001): 28'-6"Vert. Clearance at member 10(EPX002): 32'-9 1/4"Vert. Clearance at member 8(CX006): 34'-6 7/16"Finished Floor Elevation = 100'-0" (Unless Noted Otherwise)
1 4'-4 5/8"Dimension Key
2 21'-11 11/16"3 8 1/2"4 3 @ 2'-6"5 2'-6 1/2"6 1'-5 5/16"7 2 @ 2'-9 7/16"8 2 @ 2'-4 1/2"9 1'-4"10 1'-6 3/8"11 2 @ 3'-0 11/16"12 32'-4"13 7'-7 11/16" 5.259:1214 1'-5 1/8"15 2 @ 4'-0"16 2 @ 3'-5 5/8"17 2'-5 3/8"18 2'-1 5/16"19 2'-10 11/16"20 5 1/2"
1 (1)JCP053077Part Key
19'-6 11/16" 19'-6 11/16" 1
A
BL
G
BL
CL
D
CL
F
43'-6"7'-0"
2
3
GFB2097
GFB2097
GC170120
GC170120
GC170120
GC170120
GC170120
43 @ 5'-0"
5
GFB3020
GFB3020<S>
GFB3000
GFB3000
GC184120
EAP2
6
4 @ 4'
-0"
7
GFB3020
HFB3020*
GFB3000
GFB3020
GC183120
8
4 @ 4'-0"
9
BRSX001
10
11
GFB or HFB with * must use bearing plate JCP051140 (see Detail BR25DH)
21'-11 11/16"
12
(2)GFB2050 (2)GFB2050
(2)GFB2050
1
23'-0
1/4" 4
.008:1
2
22'-1" 2.3
68:12
13
CBX001
CX001
RBX001
RBX002
RBX003
EPX001
EPX002
AB
C
D
E
F
F
100'-1" 100'-1" 100'-1"
G
BL
J
BL
16'-4"
GFB3000
GFB3000
EAP2
1415
16
3
GFB2097
GFB2097
45 @ 5'-0"
5'-1 13/16"
36'-7 5/16"
37'-7 13/16"
16'-4 3/8" 0.765:12
RBX012
CX006
G
E
100'-1"
19'-6 11/16"
173 @ 5'-0"18
WRX007
18'-4 3/16"
193 @ 5'-0"20
WRX008
FRAME CROSS SECTION AT FRAME LINE(S) 15
VPC VERSION:FILENAME:
JOBNO
DATE
DRAWN/CHECK
PAGE
BUILDER
CUSTOMER
LOCATION
PROJECT
BUILDERS PO#
DATEREV BY DESCRIPTION
VP BUILDINGSVARCO PRUDEN
VP Buildings3200 Players Club Circle Memphis TN 38125
A BlueScope Steel Company
a division of BlueScope Buildings North America, Inc.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THIS DRAWING, INCLUDING THE INFORMATION HEREON, REMAINS THE PROPERTY OF VP BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE APPLICABLE PURCHASEORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE. IT SHALL NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN APPROVAL OF VPBUILDINGS.THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOODQUALITY WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS DRAWING, ALL APPLICABLE VP BUILDINGS ERECTION GUIDES, ANDINDUSTRY STANDARDS PERTAINING TO PROPER ERECTION, INCLUDING THE CORRECT USE OFTEMPORARY BRACING.
THE VP ENGINEER'S SEAL APPLIES ONLY TO THEWORK PRODUCT OF VP AND DESIGN ANDPERFORMANCE REQUIREMENTS SPECIFIED BYVP. THE VP ENGINEER'S SEAL DOES NOT APPLYTO THE PERFORMANCE OR DESIGN OF ANYOTHER PRODUCT OR COMPONENT FURNISHEDBY VP EXCEPT TO ANY DESIGN ORPERFORMANCE REQUIREMENTS SPECIFIED BYVP.
D FRAME CROSS SECTION AT FRAME LINE(S) 15
Grant Steel Building Systems, Inc.Port Townsend Aero MuseumPort Townsend, WashingtonPort Townsend Aero Museum
2004VPC-20
Quote 190330
6/25/2020
AL
11Aero Museum Add_Rev1
2020.2NTS
NOT FOR CONSTRUCTION1. USE 1/2 X 1 1/2 A325T BOLT (49080) AND NUT (47120)
W/O WASHERS. SNUG TIGHTEN BOLTS FOR ALL SECONDARY CONNECTIONS,SECONDARY CLIP CONNECTIONS, AND FLANGE BRACE CONNECTIONS,UNLESS NOTED OTHERWISE.
2. SLOT REINFORCEMENT PLATES NEED NOT BE LOCATED ON THE SAMESIDE OF THE WEB AS THE HILLSIDE WASHER.
Shape Name = 2020 Addition Wall 2, Frame 1 , Shape = 2020 Addition Wall 6, Frame 1 , Shape = 2020 Addition Wall 1, Frame 11 , Shape = 2020 Addition Wall 1, Frame 12
12:10:056/25/202038
PORT OF PORT TOWNSEND AGENDA COVER SHEET
MEETING DATE August 26, 2020
AGENDA ITEM ☐ Consent ☐ 1st Reading ☐ 2nd Reading ☒ Regular Business ☐ Informational
AGENDA TITLE VII.A. 2021 Budget Status & Issues
STAFF LEAD Eron Berg, Executive Director & Abigail Berg, Finance Director
REQUESTED ☒ Information ☐Motion/Action ☐ Discussion
ATTACHMENTS 1. Staff Memo2. August 12 Workshop Staff Memo regarding 2021 Budget
39
PORT OF PORT TOWNSEND AGENDA MEMO
20200826-2021-Budget-Memo Port Townsend Commission Meeting
DATE: 8/26/2020
TO: Commission
FROM: Eron Berg, Executive Director, and Abigail Berg, Finance Director
SUBJECT: 2021 Budget
ISSUES
1. Follow up discussion of preliminary priorities for the 2021 budget, as needed.
BACKGROUND The commission adopted the 2021 budget schedule on July 22nd which included a kick-off workshop on August 12th to discuss the issues, goals and assumptions being used to develop the 2021 budget. The memo from that meeting is attached for your reference.
The budget calendar includes a follow up discussion, as needed, for tonight’s meeting.
DISCUSSION This item is on your calendar for a follow up discussion from the August 12 Workshop.
FISCAL IMPACT As discussed herein.
ATTACHMENTS August 12, 2020 Memo to Commission re: 2021 Budget
RECOMMENDATIONS
1. Provide direction, if any, related to the preliminary assumptions underlying thedevelopment of the 2021 budget.
40
PORT OF PORT TOWNSEND AGENDA MEMO
August 12, 2020 Public Workshop – Staff Memo Page 1 of 3
DATE: 8/12/2020
TO: Commission
FROM: Eron Berg, Executive Director & Abigail Berg, Finance Director
SUBJECT: 2021 Budget
ISSUES 1. Provide the Commission with preliminary assumptions underlying the development of the
2021 budget.2. Discussion of preliminary priorities for the 2021 budget.
BACKGROUND The commission adopted the 2021 budget schedule on July 22nd which includes a kick-off meeting on August 12th to discuss the issues, goals and assumptions being used to develop the 2021 budget. Both Terry and Chris will be in attendance to discuss operations and maintenance goals and priorities for 2021 as well.
The proposed 2021 budget will be heavy on maintenance and projects as we continue to focus on the clear mandate to care for the facilities the Port owns and operates.
DISCUSSION This will be a challenging year to budget for since the impact of the pandemic in the Spring of 2020 has not been fully realized. After being sheltered in place for almost two months, the summer season started late June and it almost appears to be business as usual. But there’s still some uncertainty based on how the pandemic is impacting the rest of the nation.
The June 2020 CPI-U for Seattle-Tacoma-Bellevue came in a 0.09%; this is the lowest reported CPI in this region since 2010. The Port has used the CPI as a guide for increasing rates each year, so that we can try to stay current with rising costs. Based on this most recent CPI report, we will recommend a 1-1.5% increase to most rates charged by the Port. Other revenue items for discussion in the proposed budget include:
• Updating boat launch fees to reflect the new “annual” pass and deleting the early bird discount;• The possibility of a discount for moorage tenants who pre-pay annually, by cash, of
approximately 5%;• Review and consideration of possible stormwater fees at JCIA to cover annual stormwater
maintenance (i.e., ditches, catch basins and piping);• Review and update to JCIA tie-down fees to better fit the standard for similar airports (i.e.,
offering a few hours of free use of the ramp);• Addressing the “grandfather” issue relating to moorage slips where approximately 70 tenants
are paying moorage based on the size of the vessel rather than the size of the slip, updating toconform to current policy effective January 1, 2021; and
41
August 12, 2020 Public Workshop – Staff Memo Page 2 of 3
The CPI is also used as a rate to apply to compensation to ensure staff pay is current with the rising cost of living. Contractually and in accordance with Port policy, the Port is obligated to apply a minimum CPI increase to compensation in the amount of 2%, which is below the June CPI reported amount. There are also several newer Port employees that we anticipate will continue performing well and be eligible for a step increase in 2021. The collective bargaining agreement (CBA) between the Port and the Teamsters expires this year and bargaining will begin shortly.
With the onset of the pandemic in March, the Port did not hire any seasonal workers as is the normal course of business. While this may save money for the Port in 2020, we do not anticipate repeating this in 2021 and intend to propose an increase in seasonal staffing to support the maintenance and landscaping at Point Hudson and JCIA, in particular.
We’ve received the September 1 effective date for PERS rate increases and are awaiting the healthcare cost adjustments for 2021, which are typically received in October. PERS employer rates increased from 12.86% to 12.97%.
With the passage of the IDD Levy and our renewed focus on maintenance and projects, the Port has a need for a capital projects manager. We are currently looking at the possibility of hiring an engineer to serve in that role, managing our capital program, supporting maintenance and freeing up Eric to perform his primary duties. The Port also has a need for additional support with IT and GIS and we are considering the most effective ways to support those needs.
Continuing the theme of maintenance and projects, we are currently looking at specifications and costs for critical equipment including a new forklift for yard operations, an excavator for maintenance and projects and a pickup truck for yard operations.
The proposed 2021 budget will also include costs for continued grant writing support, governmental affairs consulting, contract engineering, environmental permitting, etc. Capital projects will be a primary cost driver in 2021 and it is our intent to present you with a budget that positions the Port to have projects “shovel ready” and competitive for funding opportunities.
One proposed shift in the structure of the budget is to track debt service and repayment by operational unit (i.e., existing debt for A-B dock replacement will show as an expenditure from Boat Haven Moorage) rather than using property taxes exclusively for debt repayment. This will provide a measure of transparency as we attempt to track our business by operational unit and will require the use of property taxes to “subsidize” various operational units annually.
Another proposed shift in the structure will be a change to the reserve funds to merge the hazardous waste and contingency reserves into an emergency reserve (with a target of $500,000 balance) and begin an ER&R type fund for future equipment replacement.
The presentation of the budget will be updated to make it more accessible to the public including: • More pie charts showing where all the money comes from (not just operations) and where all
the money goes;• Putting debt services costs in the department where the improvements occurred;• Tracking IDD Levy revenues and expenditures in detail; and
42
August 12, 2020 Public Workshop – Staff Memo Page 3 of 3
• More detail on budget development process highlighting opportunities for public engagement(mostly as a review of the 2021 process and as a look ahead to the 2022 budget developmentprocess).
Following your discussion and direction, the next step in the 2021 budget process is continued development of the budget itself with Eron and Abigail working with managers. The next scheduled check-in with the commission is a status update on August 26. If members of the public have ideas for the 2021 budget, now is an ideal time to share them. The more formal process of public engagement begins on September 23 with the presentation of the draft budget (available to the public on September 18).
FISCAL IMPACT As discussed herein.
ATTACHMENTS Q2 YTD financial report
RECOMMENDATIONS 1. Provide direction, if any, related to the preliminary assumptions underlying the
development of the 2021 budget.
43
PORT OF PORT TOWNSEND AGENDA COVER SHEET
MEETING DATE August 26, 2020
AGENDA ITEM ☐ First Reading ☐ Second Reading ☒ Regular Business ☐ Informational Items
AGENDA TITLE VII. B. Covid-19 Update
STAFF LEAD Executive Director Eron Berg
REQUESTED ☐ Information ☐ Motion/Action ☒ Discussion
ATTACHMENTS No materials
44
PORT OF PORT TOWNSEND AGENDA COVER SHEET
MEETING DATE August 26, 2020
AGENDA ITEM ☐ First Reading ☐ Second Reading ☒ Regular Business ☐ Informational Items
AGENDA TITLE VII. D. ICC Update
STAFF LEAD Executive Director Eron Berg
REQUESTED ☐ Information ☐ Motion/Action ☒ Discussion
ATTACHMENTS
Commissioner Hanke & Executive Director Berg serve representatives on the “group of 8” or the Interlocal Community Council (ICC).
Commission agreed to have regular updates so all viewpoints could be heard and the Commission could all be on the same page. This is the standing item on Commission’s regular meeting for updates about what’s happening within each committee.
There are six focus groups: A. Culture & Events – Commissioner PutneyB. Economy & Jobs – Commissioner PetranekC. Children & Families – not assignedD. Human Services – not assignedE. Food System Resiliency – Commissioner PetranekF. Broadband – Commissioner Putney
45
PORT OF PORT TOWNSEND AGENDA COVER SHEET
MEETING DATE August 26, 2020
AGENDA ITEM ☐ Consent ☐ 1st Reading ☐ 2nd Reading ☐ Regular Business ☒ Informational
AGENDA TITLE Informational Items
STAFF LEAD
REQUESTED ☒ Information ☐ Motion/Action ☐ Discussion
ATTACHMENTS 1. Port Contracts Update2. July 2020 Operations Report
46
PORT OF PORT TOWNSEND INFORMATIONAL MEMO
DATE: August 20, 2020
TO: Commissioners
FROM: Sue Nelson, Lease & Contracts Administrator
CC: Eron Berg, Executive Director
SUBJECT: August 26, 2020 Commission Meeting – Commission Update: Current Contracts Under $25,000 Approved by Executive Director Eron Berg, per Delegation of Authority Resolution No. 713-20
Name Dates Description Amount
All City Autobody & Towing 8/5/20 – 8/5/21 On-call towing; includes towing of 2 unwanted vehicles
$140.00/annual
Jen-Jay Diving, Inc. 8/7/20 – 10/30/20 Point Hudson Eelgrass Habitat Survey
not to exceed $25,000
CP Communications (Jim Pivarnik) 8/10/20 – 7/31/21 Tasks as specified: Operations, Management, Projects
not to exceed $20,000
47
Port of Port TownsendFive Year Comparisons
POINT HUDSON RV PARK ‐ Nightly Count
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOT
2015 304 291 244 652 955 1036 1202 1287 1072 771 403 269 8486
2016 286 281 392 634 806 963 1256 1276 1137 645 492 293 8461
2017 211 253 349 491 833 1015 1368 1314 1022 770 312 243 8181
2018 204 294 430 498 868 1258 1396 1369 1001 828 352 226 8724
2019 225 96 389 552 843 1098 1312 1307 928 788 419 220 8177
2020 205 246 213 0 0 418 1156 2238
POINT HUDSON MARINA ‐ Nightly Count
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOT
2015 83 104 101 163 619 537 1018 1033 958 221 73 60 4970
2016 70 92 56 235 594 706 1015 1026 950 122 51 44 4961
2017 25 60 65 138 540 729 1131 990 839 99 48 45 4709
2018 27 28 104 154 489 703 1013 1019 683 123 96 62 4501
2019 37 33 88 198 504 590 995 1011 609 127 65 66 43232020 22 64 72 10 17 502 1093 1780
0
200
400
600
800
1000
1200
1400
1600
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Point Hudson RV Nightly
2015 2016 2017 2018 2019 2020
0
200
400
600
800
1000
1200
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Point Hudson Moorage Nightly
2015 2016 2017 2018 2019 2020
48
Port of Port TownsendFive Year Comparisons
BOAT HAVEN MARINA ‐ Nightly Count
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOT
2015 132 188 271 249 605 497 799 795 920 206 287 87 5036
2016 100 251 196 251 261 548 759 623 927 211 156 129 4412
2017 64 141 420 190 479 511 757 704 757 202 61 150 4436
2018 86 103 228 137 427 399 753 711 658 236 131 116 3985
2019 89 76 286 314 567 563 1034 842 827 347 230 126 5301
2020 150 174 278 48 125 486 994 2255
0
200
400
600
800
1000
1200
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Boat Haven Moorage Nightly
2015 2016 2017 2018 2019 2020
49
Port of Port TownsendFive Year Comparisons
WORKYARD ‐ 75T Haul Outs
JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC TOT
2015 26 37 81 84 95 93 78 74 71 41 34 24 738
2016 19 34 62 76 87 86 78 82 65 61 32 21 703
2017 24 32 61 75 78 100 73 74 62 57 24 16 676
2018 25 29 81 91 99 88 86 72 60 57 44 23 755
2019 42 29 73 73 84 78 86 82 83 74 31 23 758
2020 18 34 46 31 44 85 82 340
SHIPYARD ‐ 300T ‐ Haul OutsJAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC TOT
2015 10 2 13 14 16 18 5 10 13 12 6 2 121
2016 9 6 21 12 16 14 6 10 13 19 3 8 137
2017 11 12 7 15 16 13 7 9 11 13 6 6 126
2018 9 10 13 14 19 17 8 13 14 21 9 4 151
2019 5 7 16 16 20 10 7 8 14 15 6 5 129
2020 12 11 10 16 13 16 7 85
0
20
40
60
80
100
120
JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC
Workyard 75T Haul Outs
2015 2016 2017 2018 2019 2020
0
5
10
15
20
25
JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC
Shipyard 300T Haul Outs
2015 2016 2017 2018 2019 2020
50
MOORAGE & RV'S Total Units Units
93% 278 93% 277 94% 281 92% 277 96% 287 97% 290 97% 290 0 0 0 0 0 299 SLIPS
77% 2070 83% 2231 71% 1908 65% 1747 77% 2070 67% 1801 56% 1505 0 0 0 0 0 2,688 FT
19% 130 19% 130 16% 109 20% 137 22% 150 30% 205 35% 239 0 0 0 0 0 683 FT
65% 20 63% 19 68% 20 65% 20 74% 22 66% 20 94% 28 0 0 0 0 0 30 SLIPS
111% 511 129% 593 122% 561 123% 566 101% 465 104% 478 78% 359 0 0 0 0 0 460 FT
59% 499 61% 512 72% 604 63% 533 35% 295 42% 357 73% 614 0 0 0 0 0 840 FT
82% 16 87% 17 89% 18 76% 15 43% 9 48% 10 84% 17 0 0 0 0 0 20 SLIPS
104% 879 100% 850 101% 856 100% 846 87% 736 86% 729 91% 768 0 0 0 0 0 848 FT
49% 573 51% 596 60% 701 60% 701 76% 888 75% 881 80% 931 0 0 0 0 0 1,169 FT
63% 25 58% 23 60% 24 68% 27 84% 33 89% 36 90% 36 0 0 0 0 0 40 SLIPS
55% 25 57% 26 60% 27 40% 18 39% 18 26% 12 85% 39 0 0 0 0 0 46 SITES
45% 14 44% 14 44% 14 47% 15 48% 15 83% 27 93% 30 0 0 0 0 0 32 SLIPS
42% 88 42% 88 54% 113 41% 86 41% 86 51% 107 67% 141 0 0 0 0 0 210 FT
0% 0 0% 0 0% 0 0% 0 0% 0 29% 56 58% 109 0 0 0 0 0 190 FT
82% 98 91% 109 97% 116 82% 98 76% 91 75% 90 75% 90 0 0 0 0 0 120 SLIPS
82% 18 88% 19 92% 20 122% 27 115% 25 116% 26 89% 20 0 0 0 0 0 22 SLIPS
92% 32 96% 34 91% 32 88% 31 84% 29 84% 29 72% 25 0 0 0 0 0 35 SLIPS
*Percentages reflect monthly averages. Averages are calculated from a combination of lineal feet or slips/spaces occupied compared to the overall capacity of feet/space.
Monthly Counts
POINT HUDSON BOAT HAVEN QUILCENE YARD
Permanent/Business 11 Permanent 309 Permanent 34 One way Lifts 0
Limited Access 38 Monthly Moorage 54 Nightly 20 Re‐blocks 2
Winter RV Monthlies 0 Credit System 34 Annual Ramp 5 Work Yard OPP 19.8
Monthly Moorage 1 Annual Ramp 73 Daily Ramp 68 Ship Yard OPP 2.7
Reservation Fees 541 Daily Ramp 350 0 (OPP ‐ Vessels off port property)
OPERATIONS & OCCUPANCY REPORT
PTBH ‐ COM. RAFTING
PH ‐ SLIPS 13‐32
QUIL ‐ LIMITED
QUIL ‐LINEAL
QUIL ‐ SLIPS
PH ‐ RV
PH ‐ KAYAK
PH ‐ LIMITED
PH ‐ LINEAL
PH‐ SLIPS 1‐12
DECFEB MAR APR MAY
LONGTERM
SHIPYARD
PTBH ‐ LINEAL
WORKYARD
NOV
PTBH ‐ CONSTRAINED
PTBH ‐ LIMITED
PTBH ‐ SLIPS
JUN JUL AUG SEPT OCTJAN
51
Port of Port Townsend Monthly Counts - 2020 2019
LIMITED RV MONTHLY RES. FEES LIMITED RV MONTHLY RES. FEES
JAN 21 18 11 30 238 JAN 26 21 11 32 265
FEB 21 19 11 33 249 FEB 28 21 11 31 145
MAR 23 21 11 31 24 MAR 30 20 11 31 287
APRIL 28 17 11 30 ‐183 APRIL 37 16 11 30 369
MAY 35 17 11 13 15 MAY 38 10 11 1 435
JUNE 39 0 11 1 371 JUNE 40 0 11 1 462
JULY 38 0 11 2 541 JULY 43 0 11 1 622
AUG AUG 40 0 11 1 529
SEPT SEPT 37 0 11 1 356
OCT OCT 27 10 11 26 213
NOV NOV 26 10 11 35 169
DEC DEC 21 17 11 33 96
PERMANENT A ‐ RAMP D ‐ RAMP PERMANENT A ‐ RAMP D ‐ RAMP
JAN 307 43 8 48 6 JAN 301 49 6 59 64
FEB 300 39 8 52 36 FEB 293 47 7 14 20
MAR 305 39 22 20 15 MAR 294 52 23 13 98
APRIL 304 39 6 3 8 APRIL 302 53 20 19 57
MAY 310 46 9 31 119 MAY 307 59 36 39 160
JUNE 308 54 18 54 152 JUNE 306 64 40 31 185
JULY 309 54 34 73 350 JULY 308 68 59 51 365
AUG AUG 314 72 66 11 165
SEPT SEPT 310 67 55 6 182
OCT OCT 317 53 13 2 71
NOV NOV 311 46 11 0 26
DEC DEC 300 46 8 11 23
A‐ RAMP DAILY RAMP A‐ RAMP DAILY RAMP
JAN 16 0 5 6 JAN 12 6 6 3
FEB 15 1 3 0 FEB 13 0 1 11
MAR 16 1 0 2 MAR 13 0 6 4
APRIL 17 0 2 5 APRIL 18 40 5 39
MAY 17 5 13 39 MAY 37 21 15 195
JUNE 28 16 5 214 JUNE 27 49 4 121
JULY 34 20 5 68 JULY 36 43 6 89
AUG AUG 36 22 6 102
SEPT SEPT 30 17 0 28
OCT OCT 15 0 0 3
NOV NOV 13 0 0 1
DEC DEC 13 0 0 6
MOORAGE
MONTHLY
MOORAGE
NIGHTLY
BUSINESS/
PERMANENT
MOORAGE
MONTHLY
CREDIT
SYSTEM
BUSINESS/
PERMANENT
MOORAGE
NIGHTLYQUILCENE
POINT HUDSON BUSINESS/
PERMANENT
BOAT HAVEN MOORAGE
MONTHLY
CREDIT
SYSTEM
QUILCENE
BOAT HAVEN
POINT HUDSON
MOORAGE
MONTHLY
BUSINESS/
PERMANENT
52