DESIGN RISK OF

GENERATOR GENYEM HYDRO POWERPLANT PROJECT

Page 2: plta genyem jusey

ELECTRICITY PATH IN HYDROPOWERPLANT

Page 3: plta genyem jusey

Used for Generated Electricity

Used for Increased Voltage

Used for Transmitted

Electricity

Used for DecreaseVoltage

Page 4: plta genyem jusey

HOW HYDRO PLANT WORK

Page 5: plta genyem jusey

HOW HYDRO PLANT WORK

Page 6: plta genyem jusey

GENERATOR_________________

Generator is an electrical equipment which is used to

change the primer energy (water) into

electrical energy

Page 7: plta genyem jusey

GENERATOR DIAGRAM

(1)The powerhouse(2) The exciter(3)The rotor (4) The stator (5)The main thrust

bearing on the shaft (6)The wicket gates (7)The turbine

Page 8: plta genyem jusey

CONSTRUCTION OF GENERATOR

Page 9: plta genyem jusey

COMPONENT OF GENERATOR

Page 10: plta genyem jusey

Diagram Work Of Generator

Page 11: plta genyem jusey

GENERATOR EFFICIENCY

Generator Efficiency is ratio between power output and power . Efficiency can be written as :

Page 12: plta genyem jusey

LOSSES TYPE

1COPPE

R LOSSE

S

2IRON LOSS

ES

1HYSTER

ESIS LOSSES

2EDDY

CURRENT LOSSES

Page 13: plta genyem jusey

LOSSES IN GENERATOR

Copper Losses is the power lost in the form of heat in the armature winding of a generator

Iron Losses is the power lost in the form of heat in iron core of a generator

Iron Losses divide into : 1.Hysteresis Losses is a heat loss caused

by the magnetic properties of iron core2. Eddy Current Losses is a heat loss

caused by current conductor of iron core

Page 14: plta genyem jusey

RISK MANAGEMENT FLOWCHART

Risk Identificatio

n

Risk Responding

Risk Management Planning

Risk Analysis

Risk acceptable

New Risks

Risk Monitoring

and Control

yes

yes

no

no

Page 15: plta genyem jusey

INADEQUATE DATA SUPPORTING

HAZARD

CAUSED

DESIGN FAILURE

RISK IDENTIFICATION

INAPPROPRIATE TOOLS ANALYSIS

LOW SKILL RESOURCES AND FACILITIES

INAPPROPRIATE PUIL

Page 16: plta genyem jusey

RISK ANALYSIS

Page 17: plta genyem jusey

RISK ANALYSIS

PREVENTIVE Provide Adequate Pre-

Design Data Provide Experience People

which expert to design generator Provide Design appropriate

with Owner request Follow the PUIL

Page 18: plta genyem jusey

RISK ANALYSIS

preventive

Page 19: plta genyem jusey

RISK ANALYSIS

MITIGATION Hire expert design

consultant Re analysis using several

software to compare the result Design Insurance

Page 20: plta genyem jusey

RISK ANALYSISRISK ANALYSIS

mitigation

Page 21: plta genyem jusey

THANKYOU

Page 22: plta genyem jusey
Page 23: plta genyem jusey

RISK ANALYSIS

preventive