3
Office: (877) 474-5525 Mobile: 252.571.3311 www.coc-aerospace.com [email protected] CASE STUDY – LANDING GEAR COC Aerospace’s Official Cold Spray Provider 1 PLATFORM: F-5 E / F PROGRAM PRODUCT: Nose and Main Landing Gear, Northrop F-5E / F Landing Gear Reconstruction using Cold Spray Technology CHALLENGE: With the F-5E & F AIRCRAFT flying more than twice their expected service life of the major components of the main and nose landing gear are beginning to require complete replacement of the costly components – pistons and cylinders. The costs of procuring newly manufactured main landing gear results in high costs and long lead times. SOLUTION: Through research at COC Aerospace, we discovered MIL-STD-3021 Materials Deposition, Cold Spray. This standard develops the manufacturing process controls for a cold spray operation utilizing a high-velocity jet of solid-phase particles. The jet temperatures are below the melting thresholds of many engineering materials. This allows the process to be used to apply deposits on a wide variety of substrates, such as, alloys, ceramics, and plastics. Moreover, the deleterious effects of deposit oxidation, evaporation, and residual stresses are avoided. The cold spray deposition process has significant differences from thermal spray coating technologies such as high velocity oxy-fuel (HVOF), detonation gun, plasma spray, flame spray, and arc spray. All Cold Spray is performed through our Partner MOOG and their Cold Spray Center of Excellence. COC Aerospace landing gear reconstruction is certified to MIL-STD-3012 and AS9100 Rev ’C’.

PLATFORM: F-5 E / F PROGRAM PRODUCT: Nose and · PDF fileCold Spray is performed with MOOG FAA Part 145 Repair Station, ISO9001 and AS9100 Significant amounts of material can be Cold

  • Upload
    ngodung

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Office:(877)474-5525Mobile:252.571.3311

[email protected]

CASE STUDY – LANDING GEAR

COCAerospace’sOfficialColdSprayProvider

1

PLATFORM:F-5E/FPROGRAMPRODUCT:NoseandMainLandingGear,NorthropF-5E/F

LandingGearReconstructionusingColdSprayTechnology

CHALLENGE: With the F-5E & F AIRCRAFT flying more than twice their expected service life of the major components of the main and nose landing gear are beginning to require complete replacement of the costly components – pistons and cylinders. The costs of procuring newly manufacturedmain landing gear results in high costs and long lead times.

SOLUTION: Through research at COC Aerospace, we discovered MIL-STD-3021 Materials Deposition, Cold Spray. This standard develops the manufacturing process controls for a cold spray operation utilizing a high-velocity jet of solid-phase particles. The jet temperatures are below the melting thresholds of many engineering materials. This allows the process to be used to apply deposits on a wide variety of substrates, such as, alloys, ceramics, and plastics. Moreover, the deleterious effects of deposit oxidation, evaporation, and residual stresses are avoided. The cold spray deposition process has significant differences from thermal spray coating technologies such as high velocity oxy-fuel (HVOF), detonation gun, plasma spray, flame spray, and arc spray.

All Cold Spray is performed through our Partner MOOG and their Cold Spray Center of Excellence. COC Aerospace landing gear reconstruction is certified to MIL-STD-3012 and AS9100 Rev ’C’.

Office:(877)474-5525Mobile:252.571.3311

[email protected]

CASE STUDY – LANDING GEAR

COCAerospace’sOfficialColdSprayProvider

2

Benefits of Cold Spray

◊ Significant cost savings over replacement of parts◊ Repair time turn around is months faster than new

component replacement◊ Can repair small to large defects and damage on wide

range of materialso Aluminumo Steelo Magnesiumo Titanium and other alloys

◊ No thermal stresses develop when repairing with ColdSpray

◊ Approved Process developed and tested at US ArmyResearch Lab, the DoD’s Cold Spray Experts

◊ Currently approved by:o Boeingo Bello Sikorsky and others

◊ Cold Spray is performed with MOOG FAA Part 145Repair Station, ISO9001 and AS9100

SignificantamountsofmaterialcanbeColdSprayedtoreconstructthewornanddamagedpartsofthelanding gear.

Office:(877)474-5525Mobile:252.571.3311

[email protected]

CASE STUDY – LANDING GEAR

COCAerospace’sOfficialColdSprayProvider

3

MainLandingGearReconstruction

F!5"Main"Landing"Gear"–!Re!Manufacture*and*Repair'Complete(Landing(Gear!!

!!!!!!!!

Replaceable(items!

!

Re!Manufacture!

F!5"Main"Landing"Gear"–!Re!Manufacture*and*Repair'Complete(Landing(Gear!!

!

!

Replaceable!Items!

Re!manufacture!

WithCOCAerospaceLandingGearReconstructionProgram,wetakethelarge,durableforgedandmachinedcomponentsandreapplythematerialtorepaircracks,gouges,corrodedsurfaces,damagedthreadsandotherdefects.Wemachineofforgrindoffthedamagedmaterialstoensurewehaveacleanandcompletesurfacestorepair.

Thehigheruse,smallercomponentparts.Likerings,seals,collarsandhardwarearereplacedwithnewcomponents.

Theresultisanewlyconstructedlandinggearthatisassembledandcompletelycalibratedandtestedfordampening,reboundandfunctionality,readytobereinstalledontheaircraft.

Ourreconstructionismonthsfasterthanconventionalreplacementofpartswithnewcomponentsandatafractionofthecost!