44
Plans for QTT —Overall Introduction Wang Na Xinjiang Astronomical Observatory, CAS May 19-21,2014 Green Bank

Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Plans for QTT —Overall Introduction

Wang Na

Xinjiang Astronomical Observatory, CAS

May 19-21,2014 Green Bank

Page 2: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Outline • Background • General Plan • QTT Site • Science Goal • Technique Schemes • Progress

2 3rd US-China Meeting 2014-5-19

Page 3: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Background

3 3rd US-China Meeting 2014-5-19

Almost all of our knowledge about the universe are based on the received electromagnetic radiation by the observer, only a small part are from real material (such as meteor)

The transmission window of the atmosphere for radio frequency: 10MHz ~ 1THz(30m ~ 0.3mm)

Radio wavelength spanning: λmax/λmin ~ 3×104 Optical: λmax/λmin ~ 2

Page 4: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

SKA,低频阵列,预研 GMRT低频阵列,印度,1998 ALMA,高频阵列,美国,2010年

Background Giant single telescopes

2014-5-19 3rd US-China Meeting 4

中国,FAST 500米,在建 美国 305米,1963年

Arrays

Page 5: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

英国76米,1958年

澳大利亚 64米,1961年

德国100米,1972年

美国100× 110米,2000年

Fully steerable telescopes

Background

2014-5-19 3rd US-China Meeting 5

Page 6: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Background

6 3rd US-China Meeting 2014-5-19

佘山25米,1987年 南山25米,1993年

密云50米,2005年 昆明40米,2006年 上海65,2012年

Page 7: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

• QiTai radio Telescope (QTT) – Steerable 110m radio telescope

7 3rd US-China Meeting 2014-5-19

General Plan

Page 8: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

General Plan

• Features

– Prime/Gregorian paraboloid, Az/El

– Aperture: 110 m

– Fully Steerable

– Active Surface

– Freq Range 150 MHz – 115 GHz

8 3rd US-China Meeting 2014-5-19

Page 9: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

General Plan

• China VLBI (CVN): astrometry, space exploration

CVN+QTT: sensitivity increases 1.8 times

CVN+QTT+65m: sensitivity increases 3 times

• EVN

9 3rd US-China Meeting 2014-5-19

Band (cm) EVN

Available Tele SEFD (Jy) (NS 25m)

SEFD (Jy) (QTT)

Ratio improvement

18 10 13 9 30%

13 8 61 17 71%

6 10 14 12 16%

3.6 8 31 21 34%

1.3 6 149 101 33%

Page 10: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

General Plan

• Surface Accuracy (rms): – main reflector:

≤0.6mm (no active surface) ≤0.3mm (active surface, long term ≤0.2mm) single panel:≤ 0.07mm

– sub-reflector: ≤0.1mm single panel:≤0.05mm

3rd US-China Meeting 2014-5-19 10

Page 11: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

General Plan

• Pointing Accuracy @ 6mm wave length with wind speed≤4m/s, temperature drift≤2℃/h, observation time: 69.5% – blind pointing≤5arcs – repeatability precision≤2.5arcs

• QTT Electric Performances

3rd US-China Meeting 2014-5-19 11

Band 100cm 30cm 5cm 1cm 6mm 3mm

Efficiency

(Optimum El.) 60% 63% 63%

60%

~50%

54%

~30%

30%

~12%

System Noise (K) 30 25 20 20 45 100

Page 12: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

General Plan

3rd US-China Meeting 2014-5-19

Type

Band (cm)

RF Freq (GHz)

Focus Feed Poln Science Goals

Single Pixel

100 0.15 – 0.6 Primary Kildal Linear Pulsar, RRT

30 0.6 – 4 Primary Horn Linear Pulsar, RRT, HI, OH, Galaxies

5 2 – 12 Greg. Horn Linear Molecular spectrum, Galaxies; VLBI

1 12 – 36 Greg. Horn Linear Pulsar, H2O, NH3, VLBI

0.6 36 – 50 Greg. Horn Linear Molecular spectrum, High-z CO

0.3 72 – 115 Greg. Horn Linear Molecular spectrum, Galaxies

Dual- Band

13/3.6 2.2 – 2.5

8 – 9 Greg. Horn Circular

VLBI, space exploration, System measurement (3.6cm)

3.6/0.9 8 – 9

30 – 34 Greg. Horn Circular

VLBI, space exploration

Multi- Pixel

15 1 – 2 Primary PAF Linear Pulsar, RRT, HI, OH, Galaxies

0.6 36 – 50 Greg. Horn

(multi Beam) Linear

Molecular spectrum, Galaxies

12

Page 13: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

QTT Site

13 3rd US-China Meeting 2014-5-19

Shihezi Village

Qitai

Nanshan

Urumqi

Ulastai

Page 14: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

QTT Site

14 3rd US-China Meeting 2014-5-19

• 1.5 km ×2 km basin

• Altitude range from 1730 m to 2250 m

• Surrounding ridges form an isolated layer with outside region

Page 15: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

• Elevation of mountain shelter

QTT Site

3rd US-China Meeting 2014-5-19 15

Page 16: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

QTT Site

16 3rd US-China Meeting 2014-5-19

• Average annual rainfall of area: – 180 to 200 mm

• Average evaporation capacity of Xinjiang area: – ~2000mm

• Atmospheric water vapour content: – Summer: ~19 mm – Spring and Autumn: ~9mm – Winter: ~3 mm

Page 17: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

QTT Site

17 3rd US-China Meeting 2014-5-19

• Temperature range:

– max +29.3 °, min-26.6 °

• Temperature drifting:

Temperature

drifting Ratio

≤ 5 ℃/hr 99.0% ≤ 3 ℃/hr 92.7% ≤ 2 ℃/hr 82.7%

Page 18: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

QTT Site

18 3rd US-China Meeting 2014-5-19

Roses diagram

• Frequency distribution of max. wind speed:

Wind speed Ratio

Qitai_Day Qitai_Night Qitai_Average GBT ≤4m/s (3 beaufort scale) 48.9% 83.0% 65.9% 45.9% ≤6m/s (4 beaufort scale) 74.3% 92.9% 83.6% 64.5% ≤8m/s (5 beaufort scale) 91.0% 96.6% 93.7% 79.2% ≤10m/s (6 beaufort scale) 96.7% 98.3% 97.5% 88.9%

≥17m/s (8 beaufort scale) 0.21% 0.06% 0.14% 0.5%

Page 19: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

QTT Site

19 3rd US-China Meeting 2014-5-19

• RFI: SKA-FAST measurement and processing standards

• Most interference are recognizable: − Measured 150 MHz ─ 13 GHz − 2 or 3-G mobile wireless communication (UHF, L, S band) − broadcast television (analog digital, VHF, UHF band) − differential rotation system of wireless satellite television (UHF, C

band) − satellite navigations

Page 20: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

3rd US-China Meeting 2014-5-19 20

Science Goal Astronomy

• Molecular spectra observations • High precision pulsar timing • Active galactic nuclei • Dark matter • VLBI astrometry, astro-dynamics and space

VLBI • Sky survey: detecting organic molecule and

sulphur chain molecule Application

• VLBI orbit measurement for space exploration • Pulsar time standard • Deep space pulsar autonomous navigation

NASA/GSFC

Page 21: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Science Goal

21 3rd US-China Meeting 2014-5-19

(Lyne, 2010)

High precision pulsar timing

Page 22: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Science Goal Gravitational wave detection

22 3rd US-China Meeting 2014-5-19

PSR J1045-4509, DM correction, reduces residual by ~50%

20cm

50cm

PSR J1744-1134, polarization correction, residual reduces from 487 to 195ns

NANOGrav, IPTA, PPTA

Best: ~50 ns

Page 23: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Science Goal • Follow up obs. of FAST pulsar survey • Spectrum survey at 6mm & 3mm

23 3rd US-China Meeting 2014-5-19

Page 24: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

24 3rd US-China Meeting 2014-5-19

General • Structure design: high antenna efficiency • Servo control: accurate pointing • Active surface: quasi closed-loop control • Track: welded track + heavy load • Structure and electronics: temp under -30℃ • Rx: wide band feed • Multi-beam / PAF

15°

ring1…… ring22

15°

5m2, 2856 12.5m2, 888

Technique Schemes

Page 25: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Technique Schemes Telescope efficiency

– Conformal design – Homology design – Active surface

25 3rd US-China Meeting 2014-5-19

Frequency (GHz)

Ape

rture

effi

cien

cy

Gai

n (K

/Jy)

Page 26: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Technique Schemes Active surface

• Deformation: – Gravity, thermal, temperature drifting, wind load

• FEM to Quick measurement: OOF • Closed-loop control

26 3rd US-China Meeting 2014-5-19 GBT:25mins at Q-band 25m

Presenter
Presentation Notes
FEM: Finite Element Model
Page 27: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Technique Schemes

Wheel-track antenna mount: 4 or 6 feet support

Max. load

2014-5-19 3rd US-China Meeting 27

Page 28: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

0 10 20 30 40 50 600

10

20

30

40

50

60Technique Schemes

Segmented main surface – Single joint, 27 rings, ~4000@4m2 – Secondary joint

28 3rd US-China Meeting 2014-5-19

1x2 strut

2x2-1 strut

2x2-2 strut

1x3 strut

Panel : Back sub-truss 1:1.53 1:1.27

Page 29: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Technique Schemes

Pointing correction • Thermal deformation • Temperature deformation • Wind load

29 3rd US-China Meeting 2014-5-19

Page 30: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Technique Schemes

2014-5-19 3rd US-China Meeting 30

Increase the resonance frequency

Increase the rigidity, reduce structure transmission impassable range

Reduce the systematic and random error of servo system

PI regulator+

Front feed compound control(FF)+

LQG

Digital control sys

Compound control

technique

Low speed large torque

drive

Telescope control

Presenter
Presentation Notes
伺服控制系统的控制通道或反馈通道若采用模拟器件或模拟信号传输,伺服放大器零点偏移和死区、伺服放大器零漂和噪声、编码器噪声、跟踪接收机噪声等误差项就可能超标,无法满足大型射电天线系统分配给伺服的系统误差和随机误差指标要求。
Page 31: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Technique schemes

Welded wheel track – Heavy load: ~5000 ton – Temperature range-30—+30℃

31 3rd US-China Meeting 2014-5-19

Page 32: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Technique Schemes

Sub-reflector

– carbon fiber

– 6-pole adjust system

– Rotate to change Rx

32 3rd US-China Meeting 2014-5-19

Page 33: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

33 3rd US-China Meeting 2014-5-19

Technique schemes

Four ridge feedBW: 10 octave band • Better radiation pattern • High-pass filter

ELEVEN feed • Simplify structure • Compact, low cost • Stable phase center • Constant beam width

Ultra-wideband feed – Increase S/N – Simultaneous multi spectrum line obs.

Page 34: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Technique Scemes

34 3rd US-China Meeting 2014-5-19

Software

Page 35: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Progress

• Leading group by Nuer Baikeli (Chairman of XJ) Bai Chunli (President of CAS)

• Leading group office / Site headquarters Liu Hua (secretary of XJ government)

35 3rd US-China Meeting 2014-5-19

Page 36: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Progress

36 3rd US-China Meeting 2014-5-19

• Evaluations organized by CAS & NAO • Ceremony for laying foundation • Manufactures involved • Design

Page 37: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Progress

37 3rd US-China Meeting 2014-5-19

2012 Nov. 29—Dec. 1 QTT International Advisory Workshop

Suggestions about conceptual design, 3mm science, operating, cost

Page 38: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

International collaboration:

– NRAO: Memorandum of Agreement for Scientific and Technical Consultation on the Planned Qi-Tai Radio Telescope (QTT)

– KASI, NAOJ, MPIfR

Progress

2014-5-19 3rd US-China Meeting 38

Page 39: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Progress Infrastructure

– Land acquisition: approved – Herdsman relocate: 130 families, move in 3 years – Classified road: build this year – Power: satisfy the infrastructure requirement – Water supply plan: assessed – Fiber connection: done for construction period – RFI & meterological daily monitoring

3rd US-China Meeting 2014-5-19 39

Page 40: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Progress Site planning

40 3rd US-China Meeting 2014-5-19

Page 41: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

QTT Site - Radio Protection Area

3rd US-China Meeting 2014-5-19

radio quiet zones @different protection levels: – core area – restricted area – coordination area

41

Page 42: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Progress

Recent

– Project Approval Intension: Qitai Station for Astronomical

Observation and Popular Science Education

– Funding from XJ this year

2014-5-19 3rd US-China Meeting 42

Page 43: Plans for QTT —Overall Introduction · —Overall Introduction Wang Na . Xinjiang Astronomical Observatory, CAS . May 19-21,2014 Green Bank . Outline • Background • General

Summary

• QTT: general purpose telescope

• Site is good for 6mm and above

• Engineering specifications: 6mm

• Design aimed to 3mm

• Technique challenges: structure, pointing control, surface

accuracy, active surface adjust, wideband Rx

• Science: pulsars, spectrum line, AGN, VLBI

• Present: infrastructure construction moving on

• Pursue for approving by 13th 5-year plan

43 3rd US-China Meeting 2014-5-19