21
PLANS AND PROGRAMS OF RIVER BASIN CONTROL OFFICE RELATIVE TO WATER RESOURCES MANAGEMENT AND RIVER MANAGEMENT AND RIVER BASIN MANAGEMENT

PLANS AND PROGRAMS OF RIVER BASIN CONTROL · PDF fileplans and programs of river basin control office relative to water resources management and rivermanagement and river basin

  • Upload
    vutruc

  • View
    223

  • Download
    2

Embed Size (px)

Citation preview

PLANS AND PROGRAMS OFRIVER BASIN CONTROL OFFICE

RELATIVE TOWATER RESOURCES

MANAGEMENT AND RIVERMANAGEMENT AND RIVERBASIN MANAGEMENT

FUNCTIONS FUNCTIONS

RIVER BASIN CONTROL OFFICERIVER BASIN CONTROL OFFICE(RBCO)(RBCO)

BASED ON THE E.O. 510 AND THE APPROVED INTEGRATED RIVER BASIN DEVELOPMENT AND MANAGEMENT MASTER PLAN

DevelopDevelop aa NationalNational MasterMaster PlanPlanforfor FloodFlood ControlControl bybyIntegratingIntegrating thethe variousvarious ExistingExistingRiverRiver BasinBasin ProjectsProjects andandjjdevelopingdeveloping additionaladditional planplancomponentscomponents asas neededneeded..

RationalizeRationalize andand prioritizeprioritizereforestationreforestation inin watershedswatersheds

DevelopDevelop aa MasterMaster PlanPlan ononIntegratedIntegrated RiverRiver BasinBasinManagementManagement andand DevelopmentDevelopment

ActAct asas waterwater bodybody thatthat shallshallcoordinatecoordinate allall governmentgovernment projectsprojectswithinwithin thethe riverriver basinsbasinsI l tI l t tt l t dl t dImplementImplement waterwater--relatedrelatedprojectsprojects suchsuch asas riverriverrehabilitation,rehabilitation, lakelake management,management,groundwatergroundwater management,management, andandotherother waterwater resourcesresourcesotherother waterwater resourcesresourcesManagementManagement andand developmentdevelopment

TEN POINT AGENDA TO BEAT THE ODDS UNDER  THE ARROYO ADMINISTRATION:ADMINISTRATION:

ELECTRICITY AND WATER FOR ALL BARANGAYS

AGENDA 2: Manage the Major River Basins to generate water resources that are free from contamination, provide more economic opportunities, and mitigate flooding

MEDIUM TERM PHILIPPINEDEVELOPMENT PLAN (MTPDP)

(2004-2010)

THRUST NO. 4

CREATE HEALTHIER ENVIRONMENT FOR THE POPULATION

II. WATER RESOURCES

Water Resource Water Resource Management Management FrameworkFramework

Watershed Managementframework

INTEGRATED RIVER BASIN MANAGEMENT AND DEVELOPMENTINTEGRATED RIVER BASIN MANAGEMENT AND DEVELOPMENTFRAMEWORK PLANFRAMEWORK PLAN

Integrated River Integrated River Basin Basin

Management and Management and DevelopmentDevelopmentFrameworkFramework

Plan Plan Fl d Mi i iFl d Mi i i Wetland ManagementFlood MitigationFlood Mitigationframeworkframework

Wetland Management Framework

INTEGRATED RIVER BASIN MANAGEMENT AND DEVELOPMENTINTEGRATED RIVER BASIN MANAGEMENT AND DEVELOPMENTFRAMEWORK PLANFRAMEWORK PLAN

SUPPLEMENTAL FRAMEWORKS:SUPPLEMENTAL FRAMEWORKS:

--RIVER PROTECTION AND REHABILITATIONRIVER PROTECTION AND REHABILITATION

--WATER QUALITY PROTECTION AND MONITORINGWATER QUALITY PROTECTION AND MONITORING

INFORMATION MANAGEMENT AND DECISION SUPPORT SYSTEMINFORMATION MANAGEMENT AND DECISION SUPPORT SYSTEM--INFORMATION MANAGEMENT AND DECISION SUPPORT SYSTEMINFORMATION MANAGEMENT AND DECISION SUPPORT SYSTEM

• .

FORE S T E C OS YS T E MZONE

Strategies:

+

ZONE

UP L AND E C OS YS T E M

ZONE `

URBAN ecosystem zone

Coastal ecosystem zone

L and uses and land use managementL and uses and land use managementIntegrated and interac tive governanc eIntegrated and interac tive governanc e

Capac iyCapac iy buildngbuildng and Ins titutional supportand Ins titutional support

S oc ial mobilizationS oc ial mobilization

INTEGRATED WATERRESOURCES

THE RIVER BASIN:River Basin is defined as an area of land that drains water, sediment and dissolved materials to a common outlet at some point along the a river or RESOURCES

MANAGEMENTMODEL IN THEPHILIPPINES:

THE TIGUM

p gstream channel. The term river basin is used synonymously with watershed in American usage and with catchment basin in other countries.

In the Philippines river basin is defined asTIGUM-AGANANRIVER BASIN

In the Philippines, river basin is defined as watershed with land area greater than 1,000 square kilometers. Management includes the land and the coastal reach of the basin.

INTEGRATED WATERRESOURCESRESOURCES MANAGEMENTMODEL IN THEPHILIPPINES:

THE TIGUMTIGUM-AGANANRIVER BASIN

River basin is like a bucket or glass of water

INTEGRATED WATERRESOURCES

INTEGRATED RIVER BASIN MANAGEMENT

RESOURCES MANAGEMENTMODEL IN THEPHILIPPINES:

THE TIGUM

It is a process of coordinating, conservation,management, and development of water, landand related resources across sectors within agiven river basin, in order to maximize the

i d i l b fit d i d f tTIGUM-AGANANRIVER BASIN

economic and social benefits derived from waterresources in an equitable manner whilepreserving, and where necessary, restoringfreshwater ecosystems. (Global WaterPartnership, 2000)

INTEGRATED WATERRESOURCESRESOURCES MANAGEMENTMODEL IN THEPHILIPPINES:

THE TIGUMTIGUM-AGANANRIVER BASIN

THE PHILIPPINE RICE TERRACES: A SYMBOL OF FILIPINO ENGINUITY AND CONCERN FOR WATER RESOURCES

THE 20 MAJOR RIVER BASINS ARE CONSIDEREDCONSIDERED AS THE LIFEBLOOD AND DRIVER OF THE PHILIPPINEECONOMY

PLANS AND DIRECTIONS 2007PLANS AND DIRECTIONS 2007‐‐20102010ADOPTION OF THE RIVER BASIN INTEGRATED MANAGEMENT AND

O ODEVELOPMENT FRAMEWORK PLAN

FOCUS ON THE 6 PRIORITY MAJOR RIVER BASIN

1. Pampanga River Basin2. Bicol River Basin3 Cagayan River Basin3. Cagayan River Basin4. Manila Bay River Basins (Pasig-Laguna RB other

small basin in Bataan & Cavite)5. Agusan River Basin6. Agus River Basin (Lake Lanao)

DEVELOPMENT OF INTEGRATED RIVER BASIN MASTER PLAN FOR THE FOLLOWING BASINS:

PLANS AND DIRECTIONS 2007PLANS AND DIRECTIONS 2007‐‐20102010

1. Cagayan River Basin2. Agus River Basin3. Cebu River Basins4. Cagayan de Oro River Basin5. Pasig-Laguna de Bay River Basin – updating6. Agno River Basin - updating

IDENTIFY/ESTABLISH WATERSHED MANAGEMENT COUNCIL/RIVER BASIN ORGANIZATION (RBO’S) FOR PRIORITY RIVER BASINS/SUB BASINS

PLANS AND DIRECTIONS 2007PLANS AND DIRECTIONS 2007‐‐20102010

PRIORITY RIVER BASINS/SUB-BASINS

‐Manila Bay RB Council/RBOcovered basins – Pampanga RB & Laguna de Bay

River Basin‐ Bicol RB Council/RBO‐ Agus RB Council (Lake Lanao RB council )‐ Agusan RB Council/RBO

PLANS AND DIRECTIONS 2007PLANS AND DIRECTIONS 2007‐‐20102010

Organization/Strengthening of River Basin Organization

Specifice Activities:

Organization/Strengthening of River Basin Organization

- Approval of Policy Issuance (DAO, EOs)- Conduct Study through ADB support- Strengthening RBOs such as Manila Bay River Basin Council- Organization of Agusan RBOg g- Strengthening of Lake Lanao Coordinating Council

PLANS AND DIRECTIONS 2007PLANS AND DIRECTIONS 2007‐‐20102010

SUPERVISE RIVER BASIN DEVELOPMENT PROJECT IMPLEMENTATION FOR THE FOLLOWINGPROJECT IMPLEMENTATION FOR THE FOLLOWING BASIN:

1.Bicol River Basin – Feasibility Report Completed2.Agusan River Basin – Master Plan Completed3.Manila Bay River Basins covering Pampanga River Basin – Focus sub-basin in Marilao Sub-Basin andBasin Focus sub basin in Marilao Sub Basin and Laguna de bay River Basin4.Agus River Basin (Lake Lanao Watershed)5.Tigum-Aganan River Basin

CAPACITY BUILDINGCAPACITY BUILDING-- TRAINING OF RBCO TECHNICAL PERSONNELTRAINING OF RBCO TECHNICAL PERSONNEL-- GIS application trainingGIS application training-- water quality monitoring and classificationwater quality monitoring and classification-- watershed characterizationwatershed characterizationwatershed characterization watershed characterization -- constructed wetland design and managementconstructed wetland design and management-- River rehabilitation and InformationRiver rehabilitation and Information

--Database development and MgtDatabase development and Mgt..

-- STANDARDIZATION OF METHODOLOGY STANDARDIZATION OF METHODOLOGY AND PROCEDURESAND PROCEDURES

-- UPGRADING OF SUPPORT FACILITIESUPGRADING OF SUPPORT FACILITIES

Development of Information ManagementDevelopment of Information Managementand Decision Support Systemand Decision Support System

-- Completion of the River Basin Integrated Information Management Completion of the River Basin Integrated Information Management System (RBIIMS)System (RBIIMS)

-- Completion of the Base maps of the 20 major River Basins Completion of the Base maps of the 20 major River Basins

Pilot Testing of Rainwater Harvesting Technology Pilot Testing of Rainwater Harvesting Technology g g gyg g gyand Possible Policy Recommendation and and Possible Policy Recommendation and Formulation on its useFormulation on its use

-- Pilot Area Pilot Area –– Tigum Tigum –– Aganan River Basin (ILOILO Aganan River Basin (ILOILO RIVER BASIN)RIVER BASIN)

Establishment of bioEstablishment of bio‐‐eco engineering structures:eco engineering structures:

‐‐Flood mitigation measures for Bicol River BasinFlood mitigation measures for Bicol River Basin

Planning process is onPlanning process is on‐‐going with RBCO as lead going with RBCO as lead agency in coordination with DPWH and NIA, and agency in coordination with DPWH and NIA, and DENR Region 5, FASPO, MGB and FMBDENR Region 5, FASPO, MGB and FMB

SOCIAL MOBILIZATION, ADVOCACY AND SOCIAL MOBILIZATION, ADVOCACY AND COMMUNICATION PLANS:COMMUNICATION PLANS:

‐‐DEVELOPMENT OF ADCOM PLAN TO CATER TODEVELOPMENT OF ADCOM PLAN TO CATER TORIVER BASINS SOCIAL PARTICIPATION NEEDSRIVER BASINS SOCIAL PARTICIPATION NEEDS

‐‐ IMPLEMENTATION OF ADCOM PLAN FOR MANILA IMPLEMENTATION OF ADCOM PLAN FOR MANILA BAY RIVER BASINBAY RIVER BASIN‐‐ THE PASIG RIVER/ CIVIL THE PASIG RIVER/ CIVIL SOCIETY PARTICIPATION, AND SOCIETY PARTICIPATION, AND ADVOCACY CAMPAIGNADVOCACY CAMPAIGN

‐‐DEVELOPMENT OF COMMUNICATION AND DEVELOPMENT OF COMMUNICATION AND ADVOCACY MATERIALSADVOCACY MATERIALS

OTHER PRIORITY PLANS:OTHER PRIORITY PLANS:

Conduct of Environmental Risk assessment and Conduct of Environmental Risk assessment and vulnerability Study for Priority river Basins needed vulnerability Study for Priority river Basins needed for hazard management and mitigationfor hazard management and mitigation

R and D on water resources development and R and D on water resources development and fl d dfl d dwater conservation, flood  and erosion mitigation,  water conservation, flood  and erosion mitigation,  

soil conservation, and water pricingsoil conservation, and water pricing

OTHER PRIORITY PLANS:OTHER PRIORITY PLANS:

River Basin Characterization and Profiling (Other River Basin Characterization and Profiling (Other important principal river basin supporting domestic  important principal river basin supporting domestic  important principal river basin supporting domestic, important principal river basin supporting domestic, irrigation and hydroirrigation and hydro‐‐power)power)

Policy review and development on water use, water Policy review and development on water use, water pricing and distributionpricing and distribution

Development of atlas of the priority River BasinsDevelopment of atlas of the priority River Basinsp p yp p y

Integrated Development and     Management of  6 priority river basins:

‐ Cagayan River Basin(25,649 sq. km)

‐ Manila Bay Catchment Basin covering Pampanga River Basin  and Pasig Laguna De Bay River River Basin, and Pasig‐Laguna De Bay River Basin(9,759 sq. km)

‐ Agusan River Basin (10,921 sq. km)

‐ Bicol River Basin (3,174 sq. km)

‐ Agus River Basin including Lake Lanao(1,645 sq. Km)

‐ Agno River Basin (6,215 sq. km)

#Y

APAYAO

CAGAYANTUGUEGARAO CITY

CAGAYAN RIVER BASIN

#Y

KALINGA

IFUGAO

QUIRINONUEVA VIZCAYA

ISABELA

AURORA

MOUNTAIN PROVINCE

TOTAL DRAINAGE AREA = 27,779 km2

Source: DENR‐FMB

COVERED REGION 

Region 2, CAR and small parts of Region 3

QUIRINO AURORA

Provinces covered:

Cagayan, Apayao, Kalinga, Mt. Province, Ifugao, Isabela, Nueva Vizcaya, Quirino & Aurora

MANILA BAY RIVER BASINS

PAMPANGA RIVER BASIN

PASIG‐LAGUNA DE BAY RIVER BASIN

EASTERN BATAAN RIVER BASIN (Talisay Watershed, etc.)

WATERSHEDS IN CAVITE PROVINCE

MANILA BAY RIVER BASINS

TOTAL DRAINAGE AREA = 1,110,904 kmTOTAL DRAINAGE AREA = 1,110,904 km22

Source: DENRSource: DENR‐‐FMBFMB

PAMPANGA RIVER BASINCOVERED REGION 

Region 3 and small parts of Region IV‐A

Provinces covered:

Pampanga, Nueva Ecija, Tarlac, Bulacan and small parts of Zambales, Bataan, Rizal, Aurora, Pangasinan & N. Vizcaya

MANILA BAY RIVER BASINS

TOTAL DRAINAGE AREA = 4,081 kmTOTAL DRAINAGE AREA = 4,081 km22

Source: DENRSource: DENR‐‐FMBFMB

COVERED REGION 

NCR & Region IV‐A

Cities/Provinces covered:

All Cities in NCR, Rizal, Cavite, and Laguna

PASIG‐LAGUNA BAY

RIVER BASIN

S Mi l B

BICOL RIVER BASIN

TOTAL DRAINAGE AREA = 317,435 HECTARES

San Miguel Bay

Lagunoy GulfRagay Gulf

$ZMt. Isarog

#Y Naga City

Lake BuhiLake Baao

COVERED REGION – REGION 5

COVERED PROVINCES:

ALBAY, CAMARINES SUR AND

CAMARINES NORTE

Mayon Volcano $Z

#Y Legaspi City

Lake Bato

AGUSAN RIVER BASIN

TOTAL DRAINAGE AREA

Area = 11,486 km2 or 1,148,622 hectares,4 , 4 ,

COVERED REGION:

Region 13 and Region 11

PROVINCES COVERED:

‐ AGUSAN DEL NORTE

‐ AGUSAN DEL SUR

‐ COMPOSTELA VALLEY

Linamon

Maigo

Kauswagan

BacolodTagoloan

Pantar

Balo-i

Kalambugan

Poona Piagapo Matungao

Pantao Ragat

Tagoloan II

Kapai Talakag

Island, Tudela

Island, Kolambugan

#Y ILIGAN CITYI L I G A N B A Y

AGUS RIVER BASIN

TOTAL DRAINAGE AREA = 189,495 HECTARES

Nusa IslandSalungan Island

West Balut IslandEast Balut Island

Balutmato Island

Kalilangan

Tubod

Baroy

Magsaysay

MunaiTangkal

Sapad

Piagapo

g

Marawi City

Saguiaran

Ditsaan-Ramain

Salvador

GanassiMasui

Poona Bayabao

Tamparan

TarakaLumba-Bayabao (Maguing)

Molundo

Buadipuso BuntongMarantao

BalindongTugaya

Bacolod-Kalawi (Bacolod GrandeMadambaMadalum

Bubong

Nunungan Paulas

#YMARAWI CITY

LAKE LANAO

COVERED REGION – ARMM and REGION 12

COVERED PROVINCES:

‐ LANAO DEL NORTE

‐ LANAO DEL SURKalilangan

Pangantu

Sultan Gumander

PagayawanBinidayan

Bayang

Tubaran

Marogong

Lumbatan

LumbayanagueMaguing

Butig

Malabang

Wao

Ibus Island, Sultan Gumander

BumbaranCalanogas

“We can then be sure that we canbequeath to our EARTH in

much better shape than when we inherited it”inherited it

FOR OUR CHILDREN AND OUR CHILDREN’S CHILDREN…

THANK YOU!YOU!