Missouri River Basin Inter-Agency Proposal for an Expanded Plains Snow and Basin Conditions Network. National Water and Climate Center - NRCS. Hydrologic Engineering Center. Kevin Stamm, USACE MRBIR , Feb 21, 2013. Proposal for a Missouri River Basin Interagency - PowerPoint PPT Presentation
Citation preview
Missouri River BasinInter-Agency Proposal for an Expanded
Plains Snow and Basin Conditions Network
National Water and Climate Center - NRCS
Kevin Stamm, USACEMRBIR, Feb 21, 2013
Hydrologic Engineering Center
Proposal for a Missouri River Basin InteragencyExpanded Plains Snow and Basin Condition
NetworkIndependent Technical Review (ITR) - (Recommendation #5):Studies to enhance data collection, forecasting, and resulting runoff from
plains snow. Suggested activities include establishment of additional permanent plains snow measurement stations (using already established snow measurement standards), focused on the development of improved historical record at permanent stations; and research on the effects of prairie soils, geomorphology, and hydrology on snowmelt runoff. Also, the Corps should work to improve collaboration with other groups that collect and analyze snow data, for example, the Community Collaborative Rain, Hail and Snow (CoCoRaHS) network.
March 2012:
"An expanded Plains snowpack monitoring system needs to be set up while memories of the floods are fresh and everyone is willing to spend the money, (SD Governor) Daugaard told top officials of the U.S. Army Corps of Engineers,"
“(USACE NWD Commander) McMahon said the corps is working with other agencies to determine how to create and fund an expanded plains snowpack monitoring system, one of the recommendations made by an expert panel that studied last summer's flooding. A more extensive system is already in place for monitoring the snowpack in the northern Rocky Mountains, he said." 2
Proposal for a Missouri River Basin Interagency
Expanded Plains Snow and Basin Condition Network
Purpose:The goal of this proposal is to present a framework for the establishment of an interagency, usable and sustainable network that will enhance the forecasting of runoff during the plains snowmelt period. This proposal is not intended to be a final plan, rather a launching point for additional discussion to include appropriate subject matter experts into developing the final plan.
Approach:This proposal involved consultation with subject matter experts from various agencies. Establishment of the plains snow network in the same manner as the mountain snow network could be established over a period of time. Initially, use of near real-time, on-the-ground snow depth and snow water equivalent (SWE) measurements made manually at regular intervals would provide necessary information in the short-term and also be extremely useful in determining long-term, possibly automated, network needs. 3
Mar-Apr (2012) – Project Initialization/Team Formation Apr-Jul – Development of Initial Proposal/Framework July 25 – Proposal Presented to MRBIR (Omaha, NE) Jul-Sep – Refinement of Initial Proposal September 18-19 – Face-to-Face Meeting (Bismarck, ND) September 20 – Proposal Presented to MoRAST (Bismarck, ND) Sep-Jan (2013)
◦ Formation of Instrumentation and Inventory Sub-Team◦ Development of Instrumentation Recommendation◦ Refinement of Final Proposal
January 24 - Proposal Presented to MRBIR (Kansas City, MO) Jan-Mar – Proposal informally vetted through upper states March 4-5 – Proposal Presented to MoRAST (Rapid City, SD)
Timeline
4
Inventory of existing federal, state and volunteer networks – climate, snowpack and soil moisture … leverage what is available.
Gap Assessment in monitoring, geographic areas and data acquired … what is missing?
Monitoring Recommendations to identify what will be needed to meet short-term and long-term forecasting and monitoring goals.
Technical Review Process
5
Automated Measurements
Aerial Snow Surveys
Manual Snow Sampling
Monitoring Proposal
6
Automated Measurements7
Aerial Snow Surveys
8
USACE State of ND
Manual Snow Sampling
9
Current Soil
USACE HEC-HMS Snowmelt Runoff Models
USACE Spring Snowmelt/Rainfall Runoff Modeling – End State
NWS NOHRSC Snow Model
USACE CRREL Snow Grid
Forecast Precipitation
Observed Precipitation
Observed Temperature
Forecast Temperature
Current Snow Water
Equivalent
NWS MBRFC Precipitation
NWS/USACE Temperature
NWS/NRCS/State/USACESoil Moisture
Current Soil
Current Soil Moisture
25 cm50 cm
100 cm
10 cm
10
BudgetPhas
eDescription Capital Annual/
O&M1 Upgrade Existing AWDN Sites (67) $1,628,100 $301,5002 Upgrade Existing NRCS SCAN Sites
(10)$56,000 $35,000
3 Upgrade Existing NOAA USCRN Sites (15)
$31,500 $52,500
4 Install New AWDN Sites in SD (3) $88,500 $13,5005 Install New SCAN Sites in WY and
MT (26)$969,800 $91,000
6 Enhance Aerial Gamma Measurements
$2,550,000 $150,000
7 Add State Manual Snow Sampler Coordinator in WY, MT, SD, ND and NE
$618,750 $618,750
8 Add Collateral Duty Manual Snow Surveyors (5)
$302,500 $193,600
$6,245,150
$1,455,85011
Long-Term Investment
Better understanding of basin … during flood, normal and drought conditions
Consistency throughout the basin regarding instrumentation, standards, QA/QC
Data collected real-time, quality controlled, archived and available to everyone
12
Rome, Italy
Managing Expectations
13
Moving Forward
Solicit Feedback from Decision-Makers
Evaluate Priorities / Assess
Manage Resources and Needs
Continue Moving Forward …
14
Missouri River BasinInter-Agency Proposal for an Expanded
Plains Snow and Basin Conditions Network
National Water and Climate Center - NRCS
Kevin Stamm, USACEMRBIR, Feb 21, 2013
Hydrologic Engineering Center