62
Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Pipe User Group

Tuesday March 14, 2017

Walnut Creek, CA

Matt Wassam720-333-4500

Page 2: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Agenda• AWWA M-28 liner definitions brief overview• What information is required to bid a project?• Technology Overview

– Transmission Mains: Compressive Fit– Distribution: CIPP

• Trenchless vs. Open Cut Economics

Page 3: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

• Two categories of pressure pipe liners– Independent – liner is

designed for all applicable loads independent of the host pipe

– Interactive – semi-structural liner relies on radial support from host pipe to handle internal loads without failing

INDEPENDENTloose-fitting and close-fitting

INTERACTIVE

Pressure Liner Classifications

Page 4: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Design Liner Classification (AWWA M 28 Manual)

Class I Linings Non Structural

Class II Linings Semi Structural

Class III Linings Semi Structural

Class IV Linings* Fully Structural or Structurally Independent

1. A long term (50-year) internal burst strength, when tested independently from the host pipe, equal to or greater than the MAOP of the pipe to be rehabilitated

2. The ability to survive any dynamic loading or other short-term effects associated with sudden failure of the host pipe due to internal pressure loads

*

Page 5: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Why are you considering a trenchless project?

• Economics– Pipe depth? – Host pipe material? AC pipe?– Surface restoration cost? – Traffic disruption? – Environmental? Wetlands? Contaminated

soil?– Construction timing?

Page 6: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Questions to ask

• Is your product 3rd party verified– Psi rating / material properties / safety

• Detailed instructions for installing future repairs / taps / connections

• Long-term performance testing

Page 7: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

What information is needed?

Pipe Diameter (exact?)

Pipe materialInternal corrosion (cleaning requirements)

Service connection detailsTemp bypass requirements

• Adjacent utilities• Pit locations and

sizes• Traffic control • Process water

discharge requirements

• Permitting

Page 8: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Procurement / Bidding

• Pilot Project: Sole Source• Bid against other competing technologies• Bid against conventional open cut• Design Build

Page 9: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Plans for bidding project

• Standard Utility Drawings

• Adjacent Utilities• Bypass

Requirements

Page 10: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Project Plans #2

Page 11: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Lining Project Economics

• Pit Frequency– 300’ for CIPP– 800’ for CFPE

• Construction restrictions– Work hours / days?

• Internal Corrosion

• Bypass requirements– Commercial

bypass?– Impact envelope

• Surface Restoration

Page 12: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Compressive Fitting HDPE

• 6”-48” Transmission Mains

• Very Long Pulls: 2,000’-3500’

• Hazen-Williams= 150• Over 10 million feet

installed • Class IV or Class III

• Large access pits• Service connections

require excavation• Must know exact ID• Future connections

Page 13: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

History of Compressed Fit Lining

• Method originally developed by British Gas in 1970’s• Partnership with industry to advance the technology with

companies such as DuPont• Widely used in the oil, gas and mining industries• Over 10,000,000’ installed globally over the past 40

years• Numerous recent advancements and patents (end

fittings, flange connections, monitoring, industry specific, etc.)

Page 14: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500
Page 15: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Engineering and Design HDPE Pipe

• Methods of Joining•Butt fusion - Butt fused joint 20% stronger than rest of pipe

–Electrofusion–Mechanical joints

Page 16: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Liner Pipe Fusion

• PE pipe is manufactured in joint lengths of up to 60’

• Smaller diameters can be provided on reels

• Butt fusion process

Page 17: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Host Pipeline Cleaning and Calibration

MAXIMUM PENETRATION 1/16”

Page 18: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Liner Pipe Installation

• Cable strung through pipeline

• Sizing plate pulled• Cable attached to pulling

head• Pipe pulled through

reduction rollers and host pipe

Page 19: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

HDPE Engineering – Pulling

• “Yield strength”• Closely monitored

and logged

Page 20: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Termination End Fittings Installed

• Stub Ends• Bolt Up• Compression Rings

Page 21: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Fittings

Page 22: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Termination Fittings

• Mechanical• www.isco-pipe.com

Page 23: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Fittings

Page 24: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Ft. Collins, Colorado 6,000 x 27”

Page 25: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Ft. Collins, Colorado 6,000 x 27”

• 2,400 x 27” in a single pull

• DR 26 Fully Structural pressure rated replacement

Page 26: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Ft. Collins, Colorado 2,400 x 27”

Page 27: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Ft. Collins, Colorado 6,000 x 27”

Page 28: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Ft. Collins, Colorado 6,000 x 27”

Page 29: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Amarillo, TX Case Study

Challenge 3,100 feet of 30” Cast Iron Water

Transmission Main installed in 1927 Leaking lead joints Tight easement, close to homes and

through busy roads Shut down limited to dry weather

conditions Flow capacity needed to be

maintained

Page 30: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Solution Several Methods Analyzed –

with CFPE selected to maximize flow capacity, limit excavation, follow the existing utility path and speed of installation

Liner System Design 32” Outside Diameter DR

32.5 HDPE DR 4710 1,200 feet pull distances to

minimize connections

Amarillo, TX Case Study

Page 31: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

HDPE layout

Page 32: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

3,100’ installed in 2 days Total project cost 50% of

open cut estimate Project design completed in

less than a month 4 joints in 3,100 feet of pipe

Amarillo, TX Case Study

Page 33: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Project Scope

• 525’ of 24” Ductile Iron Pipe at 180 psi.

• Lined with 24” DR 26 HDPE PE3408

Page 34: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Project Scope

• 540’ of 19” Steel Pipe at 180 psi. • Lined with 19.13” DR 26

Page 35: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Case Studies• Mississippi

– 45,000 ft– 3 inch to 12 inch steel pipe– 2,250 psi– CO2 injection

Page 36: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Case Studies

• Colorado– 72,000 ft– 12 inch steel – 2220 PSI– Produced water

Page 37: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Case Studies• PHMSA Regulated Pipeline

– 55 miles 8” steel pipe– 70 year old pipeline– Oil transmission– Heavy urban setting– 500 psi

Page 38: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Case Studies• Mexico

– 8” – 12” steel pipe– 27,000 ft– <1,000 psi

Page 39: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

CIPP For Distribution Mains• 6”-18”• 2.5 million feet

installed• Services

reconnected robotically

• Temp bypass installed

• Relatively short runs: 300-500’

• Must know the exact ID and internal condition

Page 40: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Class IV CIPP Water Main Renewal

1. Locate the pipe2. Excavate access pits3. Clean the pipe4. CCTV inspection5. Install service connection plugs6. Install the structural CIPP7. Hydrostatic pressure test8. Robotically reinstate services9. Reconnection & civil work10. Disinfect the pipe11. Site restoration

Page 41: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Temporary Bypass

Page 42: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Water Main RenewalBasic Project Steps

Clean to bare metal Dry surface

Pipe Cleaning:

Page 43: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Water Main RenewalLiner installation

Polyester woven liner impregnated with epoxy resin Cured with hot water @ 65°C (150°F)

Page 44: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Water Main RenewalLiner installation

Pulled-in-place

Page 45: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Water Main Renewal Liner installation

Pig ReceiverPig Launcher

Page 46: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500
Page 47: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Reconnection

Page 48: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Breckenridge, CO

• 5,100’ x 6 and 8 inch• Cast Iron Pipe• 9-11 feet deep• History of circumferential beam

breaks

Page 49: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Breckenridge, COCOS T

EA $0.00EA $12,589.50EA $3,503.16EA $0.00EA $0.00EA $0.00EA $0.00EA $955.80EA $4,421.10EA $0.00EA $0.00EA $0.00EA $99,833.69LF $1,188.64EA $1,453.48EA $1,629.48LF $6,320.45LF $125,464.47EA $0.00EA $0.00EA $0.00EA $15,650.52LF $320,549.90LF $12,298.56

# # # # # # # #1.24 Sewer Main Replacement 0 $0.00 $0.00 92 $133.68

S UBTOTAL $ 4 8 0 , 0 7 8 . 0 6

1.21 Reconnect t o Exist ing Fire Hydrant 1 $5,263.16 $5,263.16 0 $0.001.22 Tie int o Exist ing Main 0 $0.00 $0.00 4 $3,912.631.23 Cure- in-Place 2940 $145.29 $427,152.60 2165 $148.06

1.18 8" DIP 0 $0.00 $0.00 1437 $87.311.19 6" Plug 0 $0.00 $0.00 0 $0.001.20 8" Plug 0 $0.00 $0.00 0 $0.00

1.15 8" Bend 0 $0.00 $0.00 4 $363.371.16 8" 900 Bend 0 $0.00 $0.00 3 $543.161.17 6" DIP 0 $0.00 $0.00 83 $76.15

1.12 6" MJ Cap 0 $0.00 $0.00 0 $0.001.13 Fire Hydrant Assembly 3 $11,141.05 $33,423.15 11 $9,075.791.14 Insulat ion 0 $0.00 $0.00 68 $17.48

1.9 6"x6" Tee 5 $652.63 $3,263.15 10 $442.111.10 8"x6" Tee 0 $0.00 $0.00 0 $0.001.11 8"x8" Tee 0 $0.00 $0.00 0 $0.00

1.6 Vert ical Bends 0 $0.00 $0.00 0 $0.001.7 8"x4" Reducer 0 $0.00 $0.00 0 $0.001.8 8"x6" Reducer 0 $0.00 $0.00 4 $238.95

$0.00 $0.00 2 $1,751.581.4 4" Solid Sleeve 0 $0.00 $0.00 0 $0.001.5 6" Solid Sleeve 0 $0.00 $0.00 0 $0.00

Aqua - P i peBAS E BI D ALT B ADDI TI ON TO BAS E B I D ALT B

BI D I TEM

I TEM DES CRI P TI ONUNI T QUANTI TY

UNI T COS T

COS TQUANTI TY

UNI T COS T

Wat er Main

1.1 4" Gat e Valve 0 $0.00 $0.00 0 $0.001.2 6" Gat e Valve 7 $1,568.00 $10,976.00 10 $1,258.951.3 8" Gat e Valve 0

Page 50: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Breckenridge, CO

Page 51: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Breckenridge, CO

Page 52: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Breckenridge, CO

Page 53: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Loveland, CO

• 6,400’ of 6-12”• 1,500’ of open cut• Public bid against open

cut• Project Completion July

2016

Page 54: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Loveland, CO

Page 55: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Loveland, CO

Page 56: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Loveland, CO

• $747,740 savings over open cut

• 6,200’ of lining completed in 6 weeks

• $177,008 savings in asphalt fees

Page 57: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Loveland, CO

Page 58: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500
Page 59: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Old Market Project

Page 60: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Old Market Project

Specifics: Lined over 2500’ of 10” and 12” CILJ water main 20% less than bursting and open cut Eliminated 20 (18) service reconnection

excavations. (2 had to be dug up after lining.) Avoided about 10,000 ft2 of brick removal 24 calendar days to clean and line ½ mile of

mains (including small service reinstatements).- 86 calendar days total on-site- vs. 145 days (est.) for replacement

Page 61: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Old Market Project

Page 62: Pipe User Group - WordPress.com · Pipe User Group Tuesday March 14, 2017 Walnut Creek, CA Matt Wassam 720-333-4500

Old Market Project