Solitaire Upgrades 2005
7/28/2019 Pipe Lay Barge - Solitaire
3/50
3
Introduction
Elongated stinger
Operational benefit
Rollerbox design Aft ship reinforcements
Tension and A&R upgrade Fabrication photos
Contents
7/28/2019 Pipe Lay Barge - Solitaire
4/50
4
Introduction
7/28/2019 Pipe Lay Barge - Solitaire
5/50
5
Solitaire Picture
SolitaireSolitaire
7/28/2019 Pipe Lay Barge - Solitaire
6/506
Configuration December 2004
stinger length : 110m
tension capacity : 3 * 175mT
A&R capacity : 420mT
7/28/2019 Pipe Lay Barge - Solitaire
7/507
stinger elongation 110 m --> 140 m
tension upgrade 525 mT --> 1050 mT
A&R upgrade 420 mT --> 1000 mT
Solitaire capacity upgrade
7/28/2019 Pipe Lay Barge - Solitaire
8/508
Solitaire capabilityDeepwater Capability
Wall Thickness based on X70 Steel and DNV Hydrostatic Collapse
1000
1500
2000
2500
3000
3500
4000
4500
5000
12 16 20 24 28 32 36 40 44 48OD [inch]
WD[m]
Solitaire, Stinger Length: 110m; Tension: 420mt
Solitaire, Stinger Length: 140m; Tension: 420mt
Solitaire, Stinger Length: 140m; Tension: 800mt
Fabrication Limits of Pipe Mills
7/28/2019 Pipe Lay Barge - Solitaire
9/509
2005
Independence Trail(Gulf of Mexico)
Solitaire - S-lay
2750 metres
Increase in water depth
7/28/2019 Pipe Lay Barge - Solitaire
10/5010
wa
terdepth(me
tres)
World-wide pipelay depth records
(per year, per installation method )
3000
2500
2000
1500
1000
500
0
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
R
S
S
S
S
S
S
S
S
S
S
SS
RR
RR
R
J
JJ
J
J
J
JJ
J
R
1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
7/28/2019 Pipe Lay Barge - Solitaire
11/5011
3000
2500
2000
1500
1000
500
0
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007
S-lay Reeled J-lay
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
Mensa
Independence Trail
Canyon Express Atwater Valley
Ram Powell
Diana
Ursa
Devil's Tower
Blue Stream
DianaDiana
Atwater ValleyAtwater Valley
Pipelines in water depths greater
than 900 m
waterdepth(metres)
7/28/2019 Pipe Lay Barge - Solitaire
12/5012
Elongated stinger
7/28/2019 Pipe Lay Barge - Solitaire
13/5013
Stinger elongation
Enables optimum departure angles
for large pipes in deep water.
stinger length : 140m
installation date : Q1 2005 present status : Installation
7/28/2019 Pipe Lay Barge - Solitaire
14/5014
tension upgrade to 1050mT
classification by Lloyds
preserve high vessel workability
preserve operational stinger radii
preserve stinger radius adjustment system
Design premises
7/28/2019 Pipe Lay Barge - Solitaire
15/5015
Current stinger
7/28/2019 Pipe Lay Barge - Solitaire
16/5016
110m stinger
7/28/2019 Pipe Lay Barge - Solitaire
17/5017
New 140m stinger
7/28/2019 Pipe Lay Barge - Solitaire
18/5018
New 140m stinger
7/28/2019 Pipe Lay Barge - Solitaire
19/5019
Operational benefit
7/28/2019 Pipe Lay Barge - Solitaire
20/5020
Operational benefit
radius:
120m
length:
110m
dep. angle:
58
7/28/2019 Pipe Lay Barge - Solitaire
21/50
21
Operational benefit
radius:
120m
length:
140m
dep. angle:
75
tension:
app. -25%
7/28/2019 Pipe Lay Barge - Solitaire
22/50
22
Rollerbox design
7/28/2019 Pipe Lay Barge - Solitaire
23/50
23
Rollerbox design
height adjustment 10mm
centre to centre ~8m
4 pairs of V-rollers
steel roller for A&R cable
double seesaw
7/28/2019 Pipe Lay Barge - Solitaire
24/50
24
Rollerbox design
height adjustment 10mm
centre to centre ~8m
4 pairs of V-rollers
steel roller for A&R cable
double seesaw
7/28/2019 Pipe Lay Barge - Solitaire
25/50
25
Aft ship reinforcements
7/28/2019 Pipe Lay Barge - Solitaire
26/50
26
Aft ship reinforcements
Increases structural strength for planned upgrades.
added buoyancy : 4000mT
installation date : Q1 2005
present status : installation
7/28/2019 Pipe Lay Barge - Solitaire
27/50
27
Solitaire outrigger buoyancy
required steel : 1600mT
added buoyancy : 4000mT (nett)extra advantage : less pitch motion
disadvantage : more resistance
7/28/2019 Pipe Lay Barge - Solitaire
28/50
28
7/28/2019 Pipe Lay Barge - Solitaire
29/50
29
Tension and A&R upgrade
7/28/2019 Pipe Lay Barge - Solitaire
30/50
30
Tension upgrade
Enables installation of large pipes in deep water.
tension capacity : 3 * 350mT
installation date : Q4 2005
present status : design & fabrication(contract awarded to SAS)
7/28/2019 Pipe Lay Barge - Solitaire
31/50
31
A&R upgrade
Enables laydown of large pipes in deep water.
A&R capacity : 1000mT
installation date : September 2005
(structural work in Q1 2005)
present status : detailed engineering
(winches and HPU alreadyinstalled this dock period)
p
Existing 420mT A&R winch remains operational
7/28/2019 Pipe Lay Barge - Solitaire
32/50
32
Powerpack & Winches
7/28/2019 Pipe Lay Barge - Solitaire
33/50
33
Overview
7/28/2019 Pipe Lay Barge - Solitaire
34/50
34
7/28/2019 Pipe Lay Barge - Solitaire
35/50
35
Fabrication & Installationphotos
7/28/2019 Pipe Lay Barge - Solitaire
36/50
36
fabrication of new stinger sections
at De Boer
fabrication of new stinger sectionsat De Boer
7/28/2019 Pipe Lay Barge - Solitaire
37/50
37
fabrication of new stinger sections
at De Boer
fabrication of new stinger sectionsat De Boer
30/1130/11
7/28/2019 Pipe Lay Barge - Solitaire
38/50
38
fabrication of new stinger sections
at De Boer
fabrication of new stinger sectionsat De Boer
7/28/2019 Pipe Lay Barge - Solitaire
39/50
39
arrival of new stinger section 1 at
Keppel Verolme
arrival of new stinger section 1 atKeppel Verolme
7/28/2019 Pipe Lay Barge - Solitaire
40/50
4010/1110/11fabrication of stinger winches at Bodewesfabrication of stinger winches at Bodewes
7/28/2019 Pipe Lay Barge - Solitaire
41/50
4117/1217/12coating of rollers at Lucolancoating of rollers at Lucolan
7/28/2019 Pipe Lay Barge - Solitaire
42/50
4216/1216/12fabrication of new rollerboxes at Schaapfabrication of new rollerboxes at Schaap
7/28/2019 Pipe Lay Barge - Solitaire
43/50
43 21/1221/12fabrication of sheaves at Soester Gieterijfabrication of sheaves at Soester Gieterij
7/28/2019 Pipe Lay Barge - Solitaire
44/50
44
front view of one of the four A&R 250 ttraction winchesfront view of one of the four A&R 250 ttraction winches
7/28/2019 Pipe Lay Barge - Solitaire
45/50
45
one of the four A&R storage drums(4000 m wire capacity 3 5/8 wire)one of the four A&R storage drums(4000 m wire capacity 3 5/8 wire)
7/28/2019 Pipe Lay Barge - Solitaire
46/50
46
installation of one of the four A&Rinstallation of one of the four A&R
7/28/2019 Pipe Lay Barge - Solitaire
47/50
47
newly built power pack forstorage winchesnewly built power pack forstorage winches
7/28/2019 Pipe Lay Barge - Solitaire
48/50
48
cantilever on transportcantilever on transport
7/28/2019 Pipe Lay Barge - Solitaire
49/50
49
Overview of Dock 7th of March 2005Overview of Dock 7th of March 2005
7/28/2019 Pipe Lay Barge - Solitaire
50/50
Questions ?
www.allseas.com