PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
1974 BARGE
Three 60 tons pipe Tensioners
Castoro Sei
CUSTOMERS
Saipem (Italy)
2013 ed. 1
1974 BARGE
Line-up station and pipe Handling Equipment for DJ pipe
Castoro Sei
CUSTOMERS
Saipem (Italy)
1974 BARGE
Two pipe lifting systems
Castoro Sei
CUSTOMERS
Saipem (Italy)
1974 BARGE
The internal ramp handling system
Castoro Sei
CUSTOMERS
Saipem (Italy)
1975 BARGE
Ramp rollers
Castoro Sei
CUSTOMERS
Saipem (Italy)
1984 BARGE
Two 45 tons pipe Tensioners
Castoro Sei
CUSTOMERS
Saipem (Italy)
1988 BARGE
Two 68 tons pipe Tensioners
Israfil Guseinov
CUSTOMERS
Rauma Repola (Finland)
1990 BARGE
Modification of three existing 68 tons hydraulic pipe Tensioners and one A/R winch manufactured by Western Gear(conversion from hydraulic to electrical driving system)
Semac I
CUSTOMERS
EMC (England)
1992 BARGE
Two 30 tons pipe Tensioners
Castoro Dieci
CUSTOMERS
EMC (England)
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
1993 BARGE
Upgrade of 64 tons pipe Tensioners to 110 tons capacity
Castoro Sei
CUSTOMERS
EMC (England)
2013 ed. 2
1993 BARGE
Two pipe tracks for the firing line
Castoro Sei
CUSTOMERS
EMC (England)
1994 BARGE
Upgrade of the external ramp handling systemup to 1.000 tons capacity
Castoro Sei
CUSTOMERS
EMC (England)
1994 BARGE
Two pipe rollers and two stern rollersfor ramp extension
Castoro Sei
CUSTOMERS
EMC (England)
1994 BARGE
Upgrade of the external ramp boomsup to 1.000 tons capacity
Castoro Sei
CUSTOMERS
EMC (England)
1994 BARGE
One 40 tons pipe Tensioner
ODS Mariner
CUSTOMERS
Rana (Italy)
1994 BARGE
Two 40 tons pipe Tensioners
Various
CUSTOMERS
GMC (USA/ Uk)
1994 BARGE
One 80 tons A/R winch
Various
CUSTOMERS
GMC (USA/ Uk)
1996 BARGE
Upgrade of two 68 tons pipe Tensioners
Israfil Guseinov
CUSTOMERS
AIOC (Azerbaijan Rep.)
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 3
1996 BARGE
Upgrade of one 160 tons A/R winch
Israfil Guseinov
CUSTOMERS
AIOC (Azerbaijan Rep.)
1997 BARGE
Integrated pipe-lay system consisting of three40 tons pipe Tensioners and one 120 tons A/R winch
Semac I
CUSTOMERS
EMC (England)
1997 BARGE
One 60 tons pipe Tensioner
Castoro Dieci
CUSTOMERS
EMC (England)
1997 BARGE
One 100 tons A/R winch
Castoro Dieci
CUSTOMERS
EMC (England)
1998 BARGE
Two 25 tons pipe Tensioners and one 50 tons A/R winch
Yamashiro
CUSTOMERS
VANOORD (The Netherlands)
1998 BARGE
One 60 tons pipe Tensioner and one 60 tons A/R winch
Java Constr.
CUSTOMERS
CLOUGH (Australia)
1998 BARGE
Three 175 tons pipe Tensionersfor J-lay tower
Saipem 7000
CUSTOMERS
SAIPEM (Italy)
1998 BARGE
DJ Nesting System
Semac I
CUSTOMERS
EMC (England)
1999 BARGE
Firing Line System
FDS1
CUSTOMERS
SAIBOS (France)
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 4
1999 BARGE
Two 40 tons pipe tensioners
Lone Star
CUSTOMERS
HORIZON OFFSHORE (USA)
2000 BARGE
Internal line up clamps from 6” to 48”electrical or pneumatic driven
CUSTOMERS
SAIPEM GROUP
2000 BARGE
One 25 tons pipe tensioners, one 50 tons A/R winch, line-up system and firing line rollers
Saibos 230
CUSTOMERS
SAIBOS (France)
2000 BARGE
One 40 tons pipe tensioner
Gulf Horizon
CUSTOMERS
HORIZON OFFSHORE (USA)
1990from
to
2000 BARGE
Different size and Lay configuration ILUCs
Saipem 7000
CUSTOMERS
SAIPEM (Italy)
2000 BARGE
Two 4 tracks 90 tons pipe tensioner
Fds
CUSTOMERS
SAIBOS (France)
2000 BARGE
One overhead welding carouselfor J-lay tower
Fds
CUSTOMERS
SAIBOS (France)
2001 BARGE
Two 25 tons pipe tensioners, one 50 tons A/Rwinch, line-up system and firing line rollers
Pecos Horizon
CUSTOMERS
HORIZON OFFSHORE (USA)
2001 BARGE
No. 4 Internal line up clamps from 12” to 16”for J-Lay and Double joint
Fds
CUSTOMERS
SAIBOS (France)
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 5
24” 60 Tons Anode clamp
2001 BARGE
One welding carousel for J-lay tower
Saipem 7000
CUSTOMERS
SAIPEM (Italy)
2001 BARGE
Two 80 tons pipe tensioner, one 180 tonsA/R winch and firing ramp track supports
CUSTOMERS
IOEC (Iran)
2001 BARGE
Saipem 7000
CUSTOMERS
SAIPEM (France)
Abouzar
2002 BARGE
No. 23 radio controlled Internal line up clampsfrom 8” to 28” for J-Lay and Double joint
Balder
CUSTOMERS
HEEREMA (Holland)
2002 BARGE
Modification of no. 4 Pennant Wire Winches
Castoro Sei
CUSTOMERS
SAIPEM (Italy)
2002 BARGE
New umbilical System for Internal line up clamps
Semac I
CUSTOMERS
SAIPEM (Italy)
2002 BARGE
New umbilical System for Internal line up clamps
Castoro Sei
CUSTOMERS
SAIPEM (Italy)
2002 BARGE
Renew of Internal ramp handling system with HPP
Castoro Sei
CUSTOMERS
SAIPEM (Italy)
2002 BARGE
No. 2 Internal line up clamps 30”-32” umbilical driven
CUSTOMERS
NPCC (Uae)
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 6
2002 BARGE
Two 90 tons pipe Tensioner, one 180 tonsA/R winch A/C driven
Israfil Guseinov
CUSTOMERS
MCDERMOTT/AIOC (Azerbaijan)
2003 BARGE
Modification of no. 1 Tensioner REMACUT 40 tons andno. 1 Carmoy A/R Winch with supply of integrated control system
Castoro Sei
CUSTOMERS
SAIPEM (Italy)
2003 BARGE
A Load, Speed, footage measuring systemfor Anchor Winches
Abouzar 1200
CUSTOMERS
IOEC (Iran)
2003 BARGE
No. 4 radio controlled Internal line up clamps
Balder
CUSTOMERS
HEEREMA (Holland)
2003 BARGE
Upgrade of pipe Handling Equipment system
Israfil Guseinov
CUSTOMERS
MCDERMOTT/AIOC (Azerbaijan)
2003 BARGE
Inert material handling system
Castoro Sei
CUSTOMERS
SAIPEM (Italy)
2004 BARGE
Two 75 tons pipe Tensioner, one 180 tonsA/R winch A/C driven
Plbg136
CUSTOMERS
SADRA (Iran)
2004 BARGE
Umbilical Winches
Plbg136
CUSTOMERS
SADRA (Iran)
2004 BARGE
Tensioner & A/R Winch Control System UpgradeCUSTOMERS
SAIPEM (Italy)Castoro Otto
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 7
2004 BARGE
One 60 ton pipe TensionerCUSTOMERS
MICOPERI (Italy)
2004 BARGE
No. 4 Pipe Davits
Tofiq
CUSTOMERS
MCDERMOTT (Azerbaijan)
2004 BARGE
No1 Launch and Recovery System (LARS)for Divers
Tofiq
CUSTOMERS
MCDERMOTT (Azerbaijan)
2004 BARGE
No1 Launch and Recovery System (LARS)for ROV
Tofiq
CUSTOMERS
MCDERMOTT (Azerbaijan)
2004 BARGE
Pipe Handling System
Sb270
CUSTOMERS
SAIBOS (France)
2004 BARGE
Stinger Jacking System Upgrade
Israfil Guseinov
CUSTOMERS
MCDERMOTT/AIOC (Azerbaijan)
2004 BARGE
No. 2 Stinger Winches
Israfil Guseinov
CUSTOMERS
MCDERMOTT/AIOC (Azerbaijan)
2004 BARGE
Tensioners and A/R Winch Control system
Castoro Sei
CUSTOMERS
SAIPEM (Italy)
2004 BARGE
140 tons pipe track supportCUSTOMERS
SAIPEM (Italy)Castoro Sei
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 8
2004 BARGE
50 tons pipe Elevator refurbishment and upgrade
Castoro Sei
CUSTOMERS
SAIPEM (Italy)
2004 BARGE
Cranes electrical upgradinf including new loadmeasuring system
Castoro Sei
CUSTOMERS
SAIPEM (Italy)
2004 BARGE
Internal Line Up Clamps equipped with a newgeneration closed circuit inspection camera
Castoro Sei
CUSTOMERS
SAIPEM (Italy)
2005 BARGE
No. 4 Capstan Mooring winches 120KN
Derrick BargeAzerbaijan
CUSTOMERS
SAIPEM (Azerbaijan)
2005 BARGE
2500 tons Crane upgrade: Control and Drives upgrade, hook replacement, winches and submergable swiwel hook supply
Derrick BargeAzerbaijan
CUSTOMERS
SAIPEM (Azerbaijan)
2005 BARGE
Two 60 tons pipe Tensioner,one 120 tons A/R winch A/C driven
Dlb332
CUSTOMERS
GLOBAL IND. (USA)
2005 BARGE
Integrated Tensioning system composed by no. 1Pipe Tensioner 6 tons cap. and no. 1 A/R winch A/C driven 60 tons cap.
Mahesh
CUSTOMERS
PUNJ LLOYD (India)
2005 BARGE
New DC drives unit for Barge main CraneCUSTOMERS
NPCC (UAE)
2006 BARGE
Two 125 tons pipe Tensioners,one 250 tons A/R Winch A/C driven
CUSTOMERS
NPCC (UAE)
Dlb 750
Dlb 750
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 9
2006 BARGE
Firing Line Handling Equipment
Dlb 750
CUSTOMERS
NPCC (UAE)
2006 BARGE
New control system for no. 8 Skagit Winches
Castoro Otto
CUSTOMERS
SAIPEM (Indonesia)
2006 BARGE
New Firing Line Equipment System
Fds
CUSTOMERS
SAIPEM SA (France)
2006 BARGE
No. 1 each 90 tons pipe Tensioner 4 tracks
Normand Cutter
CUSTOMERS
SONSUB (UK)
2006 BARGE
No. 2 each 125 tons cap. pipe Tensioners AC driven
Db30
CUSTOMERS
MCDERMOTT (Australia)
2006 BARGE
No. 1 each pipe Tensioners 60 tons cap
Gabarra
CUSTOMERS
Z&P (Venezuela)
2007 BARGE
Integrated Tensioning System 240 tons cap.Including Tensioners and A/R Winch
Dlv 4400
CUSTOMERS
ZPMC (China)
2007 BARGE
Pipe Handling system for bevelling areawith Pipe Elevators 40 tons capacity
CUSTOMERS
SAIPEM (Italy)
2007 BARGE
No. 3 Pipe Tensioners 90 tons cap. eachCUSTOMERS
SAIPEM (Italy)
Semac I
Castoro Otto
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 10
2007 BARGE
Control and Drives System for Main Cranes7000+7000 ton Lifting Capacity
Saipem 7000
CUSTOMERS
SAIPEM (Italy)
2007 BARGE
Integrated Tensioning System 375/300 tons cap.Composed by no. 3 each Tensioners 125 tons cap.And no. 1 A/R Capstan Winch 300 tons cap.
Goliath I
CUSTOMERS
OCEANOGRAFIA (Mexico)
2007 BARGE
Complete pipe Handling System able to handle 4”-60”pipe, 35 tons per DJ fabrication
Goliath I
CUSTOMERS
OCEANOGRAFIA (Mexico)
2007 BARGE
Complete pipe Handling System able to handle 4”-60”pipe, 35 tons per joint
Dlv 4400
CUSTOMERS
ZPMC (China)
2007 BARGE
Integrated Tensioning System composed by no. 2 Tensioners60 tons cap. each and no. 1 A/R Winch 120 tons cap.
Java Constructor
CUSTOMERS
CLOUGH OIL&GAS (Australia)
2008 BARGE
No. 3 Tensioners 250 tons cap. each c/w integratedControl System with A/R WInch
CastorONE
CUSTOMERS
SAIPEM (Italy)
2008 BARGE
Internal Line Up Clamps from 6” to 48”upgrade and new construction
CUSTOMERS
SAIPEM (Portugal)
2008 BARGE
No. 1 each pipe Tensioner 90 tons cap.CUSTOMERS
GLOBAL (USA)
2008 BARGE
No. 3 Tensioners 125 tons cap. each c/wintegrated Control System
CUSTOMERS
GLOBAL (USA)
Cheyenne
G1200
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 11
2008 BARGE
Integrated Flexible lay system composed by no. 1each pipe Tensioner four tracks type 60 tons cap, no. 1each Winch 75 tons cap., no. 1 Reel drive system 350 tons cap.
Challenger
CUSTOMERS
GLOBAL (USA)
2008 BARGE
Integrated Tensioning System with no. 2 Tensioners60 tons cap. each and no. 1 A/R Winch 120 tons cap.
LB32
CUSTOMERS
MCDERMOTT (USA)
2008 BARGE
Integrated Tensioning System with no. 2 Tensioners 90 tons cap. each and no. 1 A/R Winch 180 tons cap.
CUSTOMERS
BUMI ARMADA (Malaysia)
2008 BARGE
No. two each Tensioners 90 tons cap. each
FDS
CUSTOMERS
SAIPEM SA (France)
2008 BARGE
Integrated Tensioning System with no. 2 each Tensioners 90 tons cap. and no. 1 A/R Winch 200 tons cap.
Castoro 10
CUSTOMERS
SAIPEM (Italy)
2008 BARGE
No. three Tensioners 125 tons cap. each c/wintegrated Control System
G1201
CUSTOMERS
GLOBAL (USA)
2008 BARGE
Integrated System composed by no. 2 Pipe Tensioners100 tons cap. each and no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)
2008 BARGE
Control and Drives System for main CranesCUSTOMERS
SAIPEM
2008 BARGE
Control and Drives System for Skagit WinchesCUSTOMERS
SAIPEM
Saipem 7000
Castoro 8
HONGKONG 2
ARMADA INST.
BARGE
Integrated System composed by no. 2 Pipe Tensioners100 tons cap. each and no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)HONGKONG 1
2008
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE
No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)
2009 BARGE
Integrated Tensioning Systwem composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
Quad joint production line
Fds2
CUSTOMERS
SAIPEM
2009 BARGE
No. one pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS
SONSUB
2009 BARGE
Supply of Internal Line up Clamps c/w new generationweld inspection system
CUSTOMERS
SUBSEA 7
2009 BARGE
No. three Tensioners 130 tons cap. each c/w integratedControl System
Castoro Sei
CUSTOMERS
SAIPEM
2009 BARGE
Of no. five Internal line up clamps 42”-48” forNordstream project
CUSTOMERS
SAIPEM
2009 BARGE
Upgrade of Stinger Handling SystemCUSTOMERS
SAIPEMCastoro Sei
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE
No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)
2009 BARGE
Integrated Tensioning Systwem composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
Quad joint production line
Fds2
CUSTOMERS
SAIPEM
2009 BARGE
No. one pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS
SONSUB
2009 BARGE
Supply of Internal Line up Clamps c/w new generationweld inspection system
CUSTOMERS
SUBSEA 7
2009 BARGE
No. three Tensioners 130 tons cap. each c/w integratedControl System
Castoro Sei
CUSTOMERS
SAIPEM
2009 BARGE
Of no. five Internal line up clamps 42”-48” forNordstream project
CUSTOMERS
SAIPEM
2009 BARGE
Upgrade of Stinger Handling SystemCUSTOMERS
SAIPEMCastoro Sei
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE
No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)
2009 BARGE
Integrated Tensioning Systwem composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
Quad joint production line
Fds2
CUSTOMERS
SAIPEM
2009 BARGE
No. one pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS
SONSUB
2009 BARGE
Supply of Internal Line up Clamps c/w new generationweld inspection system
CUSTOMERS
SUBSEA 7
2009 BARGE
No. three Tensioners 130 tons cap. each c/w integratedControl System
Castoro Sei
CUSTOMERS
SAIPEM
2009 BARGE
Of no. five Internal line up clamps 42”-48” forNordstream project
CUSTOMERS
SAIPEM
2009 BARGE
Upgrade of Stinger Handling SystemCUSTOMERS
SAIPEMCastoro Sei
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE
No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)
2009 BARGE
Integrated Tensioning Systwem composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
Quad joint production line
Fds2
CUSTOMERS
SAIPEM
2009 BARGE
No. one pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS
SONSUB
2009 BARGE
Supply of Internal Line up Clamps c/w new generationweld inspection system
CUSTOMERS
SUBSEA 7
2009 BARGE
No. three Tensioners 130 tons cap. each c/w integratedControl System
Castoro Sei
CUSTOMERS
SAIPEM
2009 BARGE
Of no. five Internal line up clamps 42”-48” forNordstream project
CUSTOMERS
SAIPEM
2009 BARGE
Upgrade of Stinger Handling SystemCUSTOMERS
SAIPEMCastoro Sei
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 12
2009 BARGE
Integrated System composed by no. 2 Pipe Tensioners100 tons cap. each and no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)
2009 BARGE
Integrated Tensioning System composed by no.2pipe Tensioners 125 tons cap. Each and no. 1 A/RWinch 250 tons cap.
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
No.3 Pipe track supports for Firing Line
Db27
CUSTOMERS
MCDERMOTT
20092010 BARGE
Quad joints production line System composed by about 130 pipe machines integrated with Control and Working stations Safety System
Fds2
CUSTOMERS
SAIPEM
2010 BARGE
No. 1 Pipe Tensioner 4 tracks 60 tons cap.CUSTOMERS
SAIPEM UK
2009 BARGE
Supply of Internal Line up Clamps c/w new generationweld inspection system
CUSTOMERS
SUBSEA 7
2009 BARGE
No. 3 Tensioners 130 tons cap. each c/w integratedControl System
Castoro Sei
CUSTOMERS
SAIPEM
2009 BARGE
Of no. 5 Internal line up clamps 42”-48” forNordstream project
CUSTOMERS
SAIPEM
2009 BARGE
Upgrade of Stinger Handling System for Internaland External ramp
CUSTOMERS
SAIPEMCastoro Sei
2009 BARGE
Integrated System composed by no. 2 Pipe Tensioners100 tons cap. each and no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)2009200920092009
HONGKONG 4
HONGKONG 3
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE
No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
Quad joint production line
Fds2
CUSTOMERS
SAIPEM
2009 BARGE
Supply of Internal Line up Clamps c/w new generationweld inspection systemCUSTOMERS
SUBSEA 7
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE
No. two Integrated Tensioning System 200 tons cap. Composedby no. 2 each Tensioners 100 tons cap. And no. 1 A/R Winch 200 tons cap.
CUSTOMERS
ZPMC (China)
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
Quad joint production line
Fds2
CUSTOMERS
SAIPEM
2009 BARGE
Supply of Internal Line up Clamps c/w new generationweld inspection systemCUSTOMERS
SUBSEA 7
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE CUSTOMERS
ZPMC (China)
Complete Firing line system composed of about 130 pipe handling
machines and integrated control and safety system
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
Quad joint production line
Fds2
CUSTOMERS
SAIPEM
2009 BARGE
Supply of Internal Line up Clamps c/w new generationweld inspection systemCUSTOMERS
SUBSEA 7
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE
N .
CUSTOMERS
ZPMC (China)
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
2009 BARGE
Quad joint production line
Fds2
CUSTOMERS
SAIPEM
2009 BARGE
Supply of Internal Line up Clamps c/w new generationweld inspection systemCUSTOMERS
SUBSEA 7
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 13
BARGE CUSTOMERS
No. one 2 track 5 tons Pipe Tensioner for Flexible lay completed with HPU system on a single structure.
2010
Integrated System composed by no.2pipe Tensioners 100 tons cap. each and no. 1 A/RWinch 200 tons cap.
SEMINOLE MICOPERI
2010 BARGE
Supply of complete Firing Line equipment and Stinger Rollers
SEMINOLE
CUSTOMERS
MICOPERI
2010 BARGE
CASPIAN SPIDER
CUSTOMERS
SES
2010 BARGE
Overhead Welding Carousel for J-Lay TowerCUSTOMERS
SAIPEM (Italy)FDS2
2010 BARGE CUSTOMERS
GLOBAL
2009 BARGE
Supply of no. 3 Pipe Tensioners of 130 tons capacity
CUSTOMERS
SAIPEM PORTUGAL
2010
Supply no. 1 Pipe Tensioner 125 tons capacity and control system upgrade to (4) Pipe Tensioner units
G1201
SEMAC1
2009 BARGE200920092009
No. one 2 track 10 tons Pipe Tensioner for Flexible lay completed with HPU system on a single structure.
2011 CUSTOMERS
KIZOMBA SATELLITEPROJECT
SAIPEM SA
2009 BARGE200920092009
No. 1 Internal Line Up Clamp model ILUC 24”-26” and No. 5 Internal Line Up Clamps model ILUC 30”-36” for S-lay process.
2011 CUSTOMERS
ALLSEAS
2009 BARGE200920092009
No. one 2 track 10 tons Pipe Tensioner for Flexible lay completed with HPU system on a single structure.
2011 CUSTOMERS
MICOPERI
2009 BARGE200920092009
No. 2 Internal Line Up Clamps model ILUC 24”-26” for S-lay process.
2011 CUSTOMERS
ALLSEASSOLITAIRE
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE CUSTOMERS
Db27 MCDERMOTT
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE CUSTOMERS
Db27 MCDERMOTT
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE CUSTOMERS
Db27 MCDERMOTT
2009 BARGE
No.3 track supports
Db27
CUSTOMERS
MCDERMOTT
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2010 ed. 12
2009 BARGE CUSTOMERS
2009 BARGE CUSTOMERS
Sum
mar
y of
maj
or p
roje
cts
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 14
2011 BARGE CUSTOMERS
SAIPEM (Italy)
2011 BARGE CUSTOMERS
Integrated system composed by No. 13 Horizontal, No. 2 Vertical Stinger Rollers, No. 1 End Roller for Internal and External ramps
Stinger handling system for the Internal and External Ramps, completed with HPU and EPU shelters and A/C Unit
CastorONE
CastorONE
2009 BARGE
HD 423
CUSTOMERS
HYUNDAI HEAVY INDUSTRIES
2011 BARGE CUSTOMERS
OU ABM TRADE
2009 BARGE
Supply of various ILUC for J-lay, S-lay for differentpipe OD range.
CUSTOMERS
SAIPEM
2009
2011
20092009
Integrated System composed by no.3 Pipe Tensioners 68tons cap. each and A/R Winch control system.
2011
Stand alone Integrated system composed by No. 1 Pipe Tensioner 60 tons cap., EPU container with A/C chiller Unit.
H1450
2009 BARGE CUSTOMERS
LOCAR (BRASIL)
200920092009
Integrated System composed by no.2 Pipe Tensioners 60 tons cap. each and 120 A/R Winch + complete pipe handling system for main deck and firing line.
2011
2009 BARGE CUSTOMERS
2009 BARGE CUSTOMERS
2009 BARGE
2009
2009 BARGE
2009
2012 BARGE
2009
Integrated Pipe Handling System for DJ production composed by No. 580 equipment for A-deck, No. 26 equipment for Firing Line, No. 15 equipment for Pipe Elevator area and (7) SAW Equipment Supports.
BARGE
2011PIETER SCHELTE ALLSEAS
Additional Horizontal 9A for Stinger ramps
SAIPEM SINGAPORECastorONE
2009 BARGE
Supply of various ILUCs for J-lay, S-lay for differentpipes OD ranges.
CUSTOMERS
SAIPEM
2012
BARGE CUSTOMERS2011
Conversion of Main Crane (7100 tons cap.): scope of work consists of design, engineering, fabrication and installation of the new control system of the Main Cranes.
HEEREMA MARINE CONTRACTORSTHIALF
PIPER
SAIPEM PORTUGAL
2009 BARGE CUSTOMER
SAIPEM PORTUGAL
2009200920092012Design and Supply of No. 2 Boom Extension Installation and Handling Tools for STINGER HANDLING SYSTEM
2009
200
Sum
mar
y of
maj
or p
roje
cts
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 12
Sum
mar
y of
maj
or p
roje
cts
RE
MA
CU
T
EX
PE
RI
EN
CE
12
Sum
mar
y of
maj
or p
roje
cts
RE
MA
CU
T
EX
PE
RI
EN
CE
12
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
12
BARGES
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
15
Integrated and modular Multi Joint Pipe Handling System composed by No. 275 machines, No. 1 Gantry Crane 40 tons cap., Working station for Welding and Beveling Skid, Bridge Skid with E-room shelter (400 tons structure)
CUSTOMER
HEEREMA OFFSHORE SERVICEAEGIR
BARGE CUSTOMERS
McDermott
Stand alone Integrated system composed by no. 1 Vertical Traction Winch 250 ton cap., Level winder 90 degrees, Storage Winch and Mobile Instrumented sheave.
DB30
2011
BARGE CUSTOMERS
TL OFFSHORE
Integrated System composed by no. 4 Pipe Tensioners 130 tons cap. each, 1 Traction Winch 500 ton cap and 150A/R Winch + complete with Storage winch and Sheaves
BARGE CUSTOMER
SAIPEM PORTUGAL
Design of No. 1 CLA Clamp, No. 1 Transfer Arm and No. TC2 Clamp for J-Lay tower
CastorONE
N448
BARGE CUSTOMERS
TL OFFSHORE
Integrated System composed by no. 3 Pipe Tensioners 130 tons cap. each, 1 Traction Winch 400 ton cap and 150A/R Winch + complete with Storage winch and Sheaves
N449
BARGE
Supply of various ILUCs for J-lay, S-lay for differentpipes OD ranges.
CUSTOMERS
SAIPEM -NPCC
BARGE CUSTOMERS
Pipe Lay System composed by no. 2 Pipe Tensioners 75 ton cap. each, no. 1 Traction Winch 180 ton cap., n. 6 Pipe Davits 60 tons cap each and Pipe handling system
2013DLB GUARAV
BARGE CUSTOMER
SAIPEM SA
Upgrade of Line-Up area of Pipe Handling system2013FDS2
Refurbishment of 4 track Pipe Tensioners 90 ton capacity for Flexible Lay system
BARGE CUSTOMER
SAIPEM SA
Umbilical Winding system for Line-Up Clamp2013 BARGE CUSTOMER
SAIPEM PORTUGAL
FDS1
Castoro 7
2012
2011
2012
2011
2011
2013
ESSAR OFFSHORE
2009
Sum
mar
y of
maj
or p
roje
cts
RE
MA
CU
T
EX
PE
RI
EN
CE
12
Sum
mar
y of
maj
or p
roje
cts
RE
MA
CU
T
EX
PE
RI
EN
CE
12
Sum
mar
y of
maj
or p
roje
cts
RE
MA
CU
T
EX
PE
RI
EN
CE
12
PIPE
LAY
EQ
UIP
MEN
TS
umm
ary
of m
ajor
pro
ject
s
RE
MA
CU
T
EX
PE
RI
EN
CE
2013 ed. 12
BARGE
Sum
mar
y of
maj
or p
roje
cts
RE
MA
CU
T
EX
PE
RI
EN
CE
16
CUSTOMER
ONGOING PROJECTS
BARGE CUSTOMERS
SWIBER
Integrated System composed by no. 3 Pipe Tensioners 100 tons cap. each, n. 1 A&R Winch 300 ton cap and Pipe Handling System
KAIZEN 4000
KEPPEL SINGMARINE-McDERMOTT
Pipe Lay composed by Pipe handling with 96 machines, no. 3 Pipe Tensioners 150 ton cap. each, no. 1 Traction Winch 500 ton cap. and no. 1 Traction Winch 250 ton cap. complete with Storage winches, Level winder, Instrumented Sheaves, Flip Sheaves, ILUCWinch system2013
DLV2000
2013