Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan. Mariya Genina, The Regional Environmental Centre for Central Asia (CAREC) 13 March, 2012. - PowerPoint PPT Presentation

Citation preview

Page 1: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Pilot PES scheme in the Chon-Aksuu watershed,

Kyrgyzstan

Mariya Genina, The Regional Environmental Centre for Central Asia (CAREC)

13 March, 2012

Page 2: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

PES – contractual transaction

between buyer and seller of an ecosystem service or land use/management practice likely to secure that service.

Payments can be: Monetary, In-kind, Service, Reward

Payment for ecosystem services (PES)

Page 3: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

The Chon Aksuu watershed

Downstream activities: Irrigated crop growing – Water Users Association

Upstream activities:

Forestry – Forest administration

Livestock breeding – Pasture Committee Mushroom/medicinal plants picking – Individual businesses

Tourism – Individual businesses

Page 4: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Project goal

To introduce PES and «reward for carbon storage» to ensure long-term sustainable use of the local ecosystem services

of the Chon-Aksuu river watershed thereby improving

livelihood of local communities.

Page 5: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Main issues in the watershed

1. Forest degradation:- Deforestation- Soil degradation in the forest- Weak natural regeneration

2. Overgrazing of pastures

Water quality and quantity for irrigation use – high level of suspended sediments, water shortages

Erosion

Decrease of water storage in the soil

Soil conservation upstreamReforestation

Better water quality for irrigation

Page 6: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Managing the problems through PES

Ecosystem services flow

Payment flow

Water Users Association

Forest administration

Pasture committee

Tourists

Mushroom pickers

4 contracts:- 1 multilateral- 3 bilateral

Page 7: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

The payment1. The Water Users Association pays in

labourThe Forest Administration: 10 man/day a year to help in tree plantation, fencing, etc;

The Pasture Committee: 20 man/day a year for pasture quality improvement.

2. The Mushroom Pickers Association pays in labour the Forest Administration: 30 man/day a year to help in soil preparation, tree plantation, etc.

3. Tourists pay in cash the Forest Administration the entrance fee in the valley: 20soms/person (0,5 USD), 50soms/car (1 USD).

Page 8: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

The conditionality

The Forest administration must:- Allocate 10% of the fee collected among tourists to tree

plantation;- Fence new plantations;- Fence important places for natural regeneration;- Work together with the Pasture Committee and the village

administration.

The Pasture Committees must:- Prepare a Pasture Management plan;- Follow recommendations on maximum pasture load, repare

key infrastructures to enable the access to remote pastures, fence temporary some pastures for regeneration;

- Limit and control grazing in the forest areas.

Page 9: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Key point for the sustainability of the overall mechanism – monitoring

Coordination Committee

Monitoring and Evaluation (M&E) plan/group

Monitoring of water quality by water users

Page 10: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Next steps To improve the present PES scheme – by including

other users (medicinal plants pickers, bee keepers, etc), targeting, further research, monitoring and evaluation;

To facilitate the development of national policies and regulations on PES in Kyrgyzstan – complementary PES contracts in Chon Aksu, involvement of Biosphere Reserve;

Reward for carbon storage - in discussion with the National Agency for Environmental Protection and considering involvement of national industries;

Learn from other experiences – study tour to Vietnam, side events and regional conferences;

Replicate the experience and conduct new pilot projects in Central Asia – interview-based surveys, spread the experience on various contract conditions, payment types, scheme designs, sustainability and potential benefits.

Page 11: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Current and expected benefits of PES scheme

Ecosystems•Improved health of water-related ecosystem services;•Conservation of forest exosystems;•Improved water efficiency in irrigation (in future).

Community.• Increased environmental

awareness;• New and voluntary bond

between local communities.

ES sellers• Improved pastures and

livestock health;• Improved efficiency of

reforestation, soil conservation and water management programs.

ES buyers• Improved crop yields and

reduced filtration costs;• Avoided conflicts

between forest units and mushroom pickers;

• Better mushroom yields;• Landscape beauty.

Page 12: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Scalability of solution

The solution is scalable, however there is need for…

Stronger local NGOs/associations as intermediaries; Commitment of the government at all levels toward PES through policy making and involvement (e.g. as buyers);Efforts to improve the population's trust to public authorities (e.g. allowing the creation of public funds managing cash payments in a transparent way).

A wider awareness on PES at all levels;Diverse local experience on various aspects of PES;Advocacy and learning from international experience (e.g. Vietnam).

Page 13: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

Replicability and factors for success

A strong intermediary organization;

Well-defined land ownership/long-term rent rights;

Sufficient time for awareness raising;

Clear scientific data and assessments on the status of ecosystems and necessary activities;

The size and form of payment is accessible to the ‘buyers’ and is interesting for ‘sellers’;

A monitoring plan, reconciled with all the stakeholders, to ensure the sustainability.

Page 14: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

References:

Simon Charre presentation, Chon Aksu project manager, CAREC (9 Dec, 2011)Some lessons learnt from the study tour to Vietnam (Feb 2012)Leimona Beria presentation, RUPES coordinator (8 Sept 2011, Astana) Sibylle Vermont presentation, FOEN, (21 Sept 2011, Astana) Perelet R.A. presentation (3-4 May 2011, Astana)National expert assessments on PES in Kazakhstan (Nugumanova L. and Kaliaskarova Z. 2011

Page 15: Pilot PES scheme in the Chon - Aksuu watershed, Kyrgyzstan

worldwaterforum6.org

solutionsforwater.org

MERCI / THANK YOU

CooperationCommunicationLink to ecosystems

Direct benefits for livelihood and ecosystems

Key messages:

Mariya Genina, CAREC