2

Click here to load reader

Physical Training Risk Assessment

Embed Size (px)

Citation preview

Page 1: Physical Training Risk Assessment

RISK MANAGEMENT WORKSHEET1. Organization and Unit Location:710th ASMC, IL ARNG, North Riverside Armory

2. Page:1 of 1

3. Mission/Task:

Classroom Instruction4. Begin Date / Time Group:(DDTTTTRMMMYY)

5. End Date / Time Group: (DDTTTTRMMMYY)

6. Date Prepared:

7. Tasks 8. Identify Hazards 9. Initial Risk Level 10. Develop Controls 11. Residual

Risk Level 12. Implement Controls (“How To”) 13. Who/How Supervised

Conduct Physical Training (PT)

Terrain

Hot Weather / Dehydration

Wild Life

Physical Injury

Profiles and Special Populations

Inclement Weather

M

M

M

M

M

M

Carefully examine PT area prior to conducting activities;

Drink water and monitor intensity;

Practice awareness, look prior to sitting down;

Conduct proper warm-up;

Stay within profile limits;

Read weather report; Dress appropriately;

L

L

L

L

L

L

Warn participants about uneven terrain; Conduct PT on the best site available

Enforce regular hydration; Participants bring full canteens or water hydration systems to PT;

Brief participants;

Brief participants;

Brief participants;

Brief participants;

SGL and PT Instructor

SGL and PT Instructor

SGL and PT Instructor

SGL and PT Instructor

SGL and PT Instructor

SGL and PT Instructor

14. Overall Mission/Task Risk Level After Countermeasures are Implemented: (Circle Highest Remaining Risk Level) LOW (L) MODERATE (M) HIGH (H) EXTREMELY HIGH (E)

Page 2: Physical Training Risk Assessment

15. Prepared By: 16. Authority: