Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County
Photograph of Existing Conditions - Looking West from Greenway Figure 1
Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County
Perspective Rendering of Proposed Bridge Reconstruction - Looking West from Greenway Figure 2
FREMONT AVENUE
Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County
Photograph of Existing Conditions - Looking South from Bridge Deck Figure 3
Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County
Perspective Rendering of Proposed Bridge Reconstruction - Looking South from Bridge Deck Figure 4
2019
Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County
41’-0”
99’-0”Approx. Overall Bridge Length
19’-0” +/- Existing BlackChain Link Fence
Precast Arch Fascia Panel with Masked Interior 27” Concrete Beams
Existing Modular Block Wall
2’-0” Typical
14’-6” +/-
Non-Structural Pier
Corner Overlook
Fremont Ave Sign
Existing Retaining Wall
Existing Fence
Existing VegetationAbutment Face
2’-0” Typical
29’-0”
TrailWalk
29’-0”10’-0” +/-
Embankment
Abutment Face
Wing Wall w/ Shallow Arch Relief
Corner Overlook
Concrete Parapet w/ Inset Panels
Pipe and Cable Railing
Pilaster
19’-0” +/-
East Elevation - Looking West Figure 5
0’ 10’ 5’ 20’
FREMONT AVENUE
Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County
Parapet Pilaster
Steel Pipe and Cable Railing
Concrete Parapet
Bridge Deck
Arched Precast Concrete Fascia Panel
Precast Concrete Beams
3’-6”
1’-
1”
4’-6”
2’-1”
49’ -4”Overall Bridge Deck Width
10’ Sidewalk 26’- 0” Roadway 10’ Sidewalk
11’ Drive Lane 11’ Drive Lane
1’-8”
2’-0” C.G. 2’-0” C.G.
1’-8”
Figure 6Bridge Cross Section - Looking North
0’ 2.5’ 5’ 10’ 20’
Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County
Figure 7Arched Pier Elevation - Looking North
0’ 2.5’ 5’ 10’ 20’
Non Structural Arched Concrete Pier
Midtown Greenway
Arched Precast Concrete Fascia Panel
Solid Concrete Diaphragm Typ.13
’-5’’
9’-6”Typical
2’-0”Typical
1’- 1”
3’ - 6
”
49’4”Overall Bridge Deck Width
1’ -1
”Ty
pica
l
Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County
Figure 8
4’- 8”To Face of
Coping
North Abutment Elevation
0’ 2.5’ 5’ 10’ 20’
Existing Adjacent Concrete Wall and Railing
1-1/2” Coping Relief
Midtown Greenway
Parapet Pilaster
Steel Pipe and Cable RailingConcrete Parapet Wall
14’-6
” +/-
3’ -6
”
1’ -1
”Co
ping
47’ - 10”
4’- 8”To Face of
Coping 49’- 4”Overall Deck Width
Oct 19, 2018Fremont Avenue Bridge, Minneapolis, MNHennepin County
Figure 9
4’- 8”To Face of
Coping 49’- 4”Overall Deck Width
South Abutment Elevation - 3” Arch Relief
0’ 2.5’ 5’ 10’ 20’
Existing Concrete Wall and Railing
3” Arched Relief
Abutment Face
Trench
2’Typical
9’ - 6”Typical
19’ +
/-3’
-6”
1’ -1
”Ty
pica
l