ENVIRONMENTAL MANAGEMENT PLAN PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur, Andhra Pradesh Prepared by Flat no: 7-3, Dhruvatara Apartments, Amrutha Estates, Somajiguda, Hyderabad - 500 082; Ph: 040- 23314270 /271.

PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Embed Size (px)

Citation preview

Page 1: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

ENVIRONMENTAL MANAGEMENT PLAN

PHOENIX MULTIPLEX PVT. LTD.

(Retail cum Multiplex Complex)

Town Sy. No. # 506, Ward No. 20, Block No. 17,

Nagarampalem ward,

G.T. Road, Guntur,

Andhra Pradesh

Prepared by

Flat no: 7-3, Dhruvatara Apartments, Amrutha Estates, Somajiguda,

Hyderabad - 500 082; Ph: 040- 23314270 /271.

Page 2: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

1

1.0 INTRODUCTION

Phoenix is a corporate conglomerate with business interests in Realty, Automobiles, Power

and Mining.

Our roots firmly entrench the larger context of deep-seated knowledge about the domains

we operate in. Though we have our presence in varied industries, we see realty as our

primary growth engine. Our projects are staggering testimonies to luxury and comfort. We

are working towards creating a unique world of our own. From blueprint to execution,

Phoenix leaves its predominantly identifiable legacy on each project.

Now Phoenix Multiplex Pvt. Ltd., has proposed to construct an Retail cum Multiplex

Complex in an area of 2.1 Acres with built-up area of 33,150.72 Sq.m. at Town Sy. No. #

506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur, Andhra Pradesh

This report furnishes the details of location of Site, Description of the project, and

Environmental Management Plan to be followed during the Construction and Operation of

the Retail cum Multiplex building.

2.0 DETAILS ABOUT THE PROJECT SITE

1. The location of the proposed cconstruction of Retail cum Multiplex complex is at Town

Sy. No. # 506, Ward No. 20, Block No. 17, Nagarpalem ward, G.T. Road, Guntur,

Andhra Pradesh

2. The project site for the proposed Retail cum Multiplex complex is located in prime

commercial activity area.

3. The site of the proposed Retail cum Multiplex complex is surrounded by the following in

all the directions.

North – Road

East – private buildings

South – private buildings

West – open land 4. The topography of the site is more or less flat without many undulations.

5. Water required for the proposed Retail cum Multiplex complex will be met from

Municipality supply and ground water resources.

Page 3: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

2

6. Total land acquired for proposed Retail cum Multiplex complex is 2.17 acres (8,765.7

Sq.m). Net land available after deducting road affected area 2.1 acres (8,348.15 Sq.m)

7. The nearest railway station is Guntur Railway station situated at a distance of 1.2 Kms.

from the proposed site.

8. Topographical map showing the location of the Project site is shown in Fig 1.1

Page 4: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

3

TOPOGRAPHICAL MAP SHOWING THE LOCATION OF THE PROJECT SITE

Proposed Project site

Page 5: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

4 4

3.0 DETAILS OF THE PROJECT

The following are the brief details of the proposed Retail cum Multiplex complex

S.No Details Description

I. Total Land Area Total land acquired for proposed Retail cum Multiplex

complex is 2.17 acres (8,765.7 Sq.m). Net land

available after deducting road affected area 2.1 acres

(8,348.15 Sq.m)

II. Survey nos. Town Sy. No. # 506, Ward No. 20, Block No. 17,

III. Expected project cost Rs. 40 Crores

IV. Total built-up area Total Built up area – 33,150.72 Sq.m

(which includes building with 2 basements + ground

floor + 3 upper floors + terrace)

V. Built up area statement Kindly refer to Table 1.1

VI. Water Requirement Total water demand is about 10 KLD during

Construction of Retail cum Multiplex complex & 200

KLD during the operation of Retail cum Multiplex

complex

Fresh water consumption : 74 KLD

Recycled water : 126 KLD

VII. Source of supply Municipal supply / Ground water

VIII. Waste water generation 185 KLD

IX. Capacity of STP proposed 200 KLD

X. Greenbelt area proposed 570 Sq.m

XI. Power requirement 4000 kVa (Maximum peak demand)

XII. Solid waste generation During operational phase:

Municipal solid waste : 2.2 MT/day

XIII. Connectivity The site is well connected by Guntur – Sattenapalli

road

XIV. Additional facilities DG Sets

Sewage Treatment Plant

Page 6: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

5 5

XV. Back up supply 3 x 2000 kVA

XVI. Parking facilities Total parking area : 14,122 Sq. mts

BUILT-UP AREA STATEMENT

TABLE 1.1

S.NO FLOORS TOTAL AREA IN SQ.M

1. Ground Floor 4757.18

2. First Floor 4757.18

3.

Second Floor

(Theater Lobby

Level)

4757.18

4. Third Floor

(Theater Exit Level) 4757.18

Sub- Total (A) 19,028.72

5. Basement floor - 1 7061.00

6. Basement floor - 2 7061.00

Sub- Total (B) 14,122.00

Total (A + B) 33,150.72

3.1 RAW MATERIALS Raw materials are required for constructing walls, roofs, openings, panels, super structure

and paving purpose.

Walls: Fly ash-based lightweight aerated concrete blocks will be used for construction of

walls and rattrap bond method will be followed. This system of bonding saves 25% of the

total number of bricks and 40% of the mortar

Roof: pre-cast / aerated cellular concrete roofing slabs are proposed for constructing roof

structures. These structures have high rating to fire resistance and provide better

insulation.

Openings: Precast RCC doors and window frames will be used for openings wherever it is

feasible. These are cheaper, stronger, fire resistant, and termite resistant, sustain

temperature and humidity variations and are effective substitutes to timber / wood.

Page 7: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

6 6

Super structure: Light weight concrete will be made and mixed with conventional mix for

constructing super structure. Aluminum powder when added to lime reacts and form

hydrogen bubbles and light weight cementitious material is formed. This material is high

strength to weight ratio and an insulation value of R-10 in a 20.32 cm thick wall.

Paving of roads: Grass pavers will be used on the road, parking and pedestrian areas.

Grass pavers will

Reduce heat island effect

Minimize storm water runoff

Beneficial for localized aquifer recharge

Source of Raw materials

All the raw materials required for the Retail cum Multiplex complex will be sourced from in

and around Guntur

3.2 WATER REQUIREMENT

The total water required for the proposed Retail cum Multiplex complex will be met from

ground water resources & Municipal water supply. The total water requirement for

proposed Retail cum Multiplex complex will be 200 KLD and 10 KLD will be the water

requirement during construction period.

The following is the break-up of the total water consumption for project.

Water Requirement for Domestic and flushing:

S.No. Description Capacity Basis (L) Water Requirement (LPD)

Domestic

(LPD)

Flushing

(LPD)

Total

(LPD)

A. MALL:

Theatres

No. of Persons 7500 15 37500 75000 112500

(5 lpcd) (10 lpcd) (15 lpcd)

No. of Staffs 750 45 11250 22500 33750

(15 lpcd) (30 lpcd) (45 lpcd)

Total - A 48750 97500 146250

Page 8: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

7 7

S.No. Description Capacity Basis (L) Water Requirement (LPD)

Domestic

(LPD)

Flushing

(LPD)

Total

(LPD)

B. Hypermarket,

Fun centre,

Show rooms and

Anchor room

No. of Persons 1000 15 5000 10000 15000

(5 lpcd) (10 lpcd) (15 lpcd)

No. of Staffs 100 45 1500 3000 4500

(15 lpcd) (30 lpcd) (45 lpcd)

Total - B 6500 13000 19500

C. Food Court

No. of Persons 450 70 18000 13500 31500

(40 lpcd) (30 lpcd) (70 lpcd)

No. of Staffs 45 45 675 1350 2025

(15 lpcd) (30 lpcd) (45 lpcd)

Total - C 18675 14850 33525

Total (A + B +

C) 73925 125350 199275

Water Requirement for Landscaping:

Landscaping Area : 570 Sq.m

Total no. of plants : 60

Water required for each plant : 15 liters/plant

Total Water required for landscaping : 0.9 KLD

say 1 KLD

Page 9: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

8 8

Break-up of Water Requirement (in KLD)

Requirement Quantity, KLD Source

Domestic 74 Municipal water supply / ground

water /

Flushing 125 Treated wastewater

Greenbelt 1 Treated wastewater

Total Water Demand 200

3.3 WASTEWATER GENERATION

In the proposed project the waste water generated during construction will be sanitary

wastewater which will be treated in septic tank followed by soak pit. During the operation

of the Retail cum Multiplex complex, total waste water generation will be 185 KLD. The

waste water generated from Retail cum Multiplex complex will be treated in Sewage

Treatment Plant and treated waste water will be utilized partly for flushing operations,

HVAC and greenbelt development.

3.3.1 WATER BALANCE

Input in KLD Output in KLD

Fresh water 74 Treated wastewater will be reused for

non-potable purposes like flushing 125

Recycled water 126 Treated wastewater will be reused for

Greenbelt 1

Treated wastewater discharge into

sewer 59

Consumption / Evaporation 15

TOTAL 200 TOTAL 200

Page 10: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

9 9

3.4 CONSTRUCTION OF RETAIL CUM MULTIPLEX COMPLEX

In the construction process the following activities will be taken up phase wise manner.

The activities are summarized as below.

S. No. Type of Work

1. Construction of Compound wall

2. Greenbelt Development

3. Leveling of construction area

4. Excavation for Foundations

5. Foundation PCC, Concrete, Plinth Beam

6. Slab laying

7. Electrical works

8. Brick work

9. Plumbing & Drainage work

10. Stair case for all floors

11. Fixing of Doors & windows

12. Water Proofing works

13. Electrical wiring & Fixtures

14. Fixing of sanitary fittings

15. Plastering works

16. Painting work

17. STP Construction

18. Over head & Underground tank construction

19. Miscellaneous works & amenities development

20. Provision of Backup supply

4.0 ENVIRONMENTAL MANAGEMENT PLAN DURING CONSTRUCTION PHASE

Environmental pollution is inevitable during the construction phase. The project proponent

should take appropriate steps to control pollution during construction phase. The following

are the factors requiring control during construction phase.

4.1 SITE PREPARATION

The following control measures will be followed during the site preparation

Topsoil will be stripped to a depth of 200 mm from areas proposed to be occupied

by buildings, roads, paved areas and external services.

Top soil will be stockpiled to a height of 400 mm in pre - designated areas for

preservation and will be reapplied to site during plantation of the proposed

vegetation.

Measures will be applied to control erosion of preserved top soil.

Page 11: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

10 10

Top soil will be separated from sub-soil debris and stones larger than 50 mm

diameter.

To keep the damage to topsoil minimum, excavators will be used for construction.

Temporary seeding will be carried out to reduce erosion and sedimentation from

disturbed areas

Temporary seeding will be performed on areas which have been disturbed during

construction and which are likely to be disturbed after a few weeks. For this time

gap the top soil will be preserved from erosion through temporary measures like

temporary seeding.

4.1 AIR ENVIRONMENT

Dust is the major emission during the construction period. The following control

measures will be followed during the construction period

Application of dust suppressants will be done

Locally available gravel will be applied to the roads and lots, to prevent the dust

emanation

Measures will be taken to cover the stored materials to prevent the dust emission

during high winds

Speed of the vehicles in the project area will be limited 20 Kmph

Rescheduling the works during high speedy winds

Inspection will be done for use of covering sheet to prevent dust dispersion at

buildings site

4.2 WATER ENVIRONMENT

Water required during the construction the Retail cum Multiplex complex will be met from

the ground water resources. Total water requirement during construction period will be 10

KLD and construction period lasts for period of 36 months.

The following control measures will be taken to reduce the reduce the water requirement

during construction

Curing water will be sprayed on concrete structures; free flow of water will not be

done for curing.

After liberal curing on the first day, all concrete structures will be painted with

Page 12: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

11 11

curing chemical to save water. This will stop daily water curing hence save water.

Concrete structures will be covered with thick cloth/gunny bags and then water

will be sprayed on them. This will avoid water rebound and will ensure sustained

and complete curing.

Ponds will be made using cement and sand mortar to avoid water flowing away

from the flat surface while curing.

Waste water management during construction

Waste water generation will be minimized by following above control measures

Sanitary waste water generated during construction stage will be septic tank

followed by soak pit

4.3 NOISE ENVIRONMENT

The main sources of noise in the process of construction activities will be cement concrete

mixing, welding, aluminum channel folding, drilling and DG sets etc.

Diesel generator sets will be provided with integral acoustic enclosure at the

manufacturing stage itself

Equipment like earmuffs, earplugs etc. will be used for hearing protection for

workers.

4.4 LAND ENVIRONMENT

4.4.1 Solid waste generation & Management Proper planning and management during construction period is very much vital. We

proposed to implement the following control measures to mitigate the waste generation

Delivery of material on site will be done over a durable, impervious and level

surface, so that first batch of material does not mix with the site surface. Availability

of covered storage will be assured.

The recyclable items like metal, plastic will be sent to recyclable industry, and rest of

this scrap will be stored in a covered area.

Page 13: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

12 12

Wherever materials (aggregates, sand, etc.) are more likely to generate fine

airborne particles during operations, nominal wetting by water will be practiced.

Workers / labour will be given proper air masks and helmets.

Skilled labour and good workmanship will be employed for judicial utilization of

materials and minimizing the waste.

Proper estimate of material will be done to minimize the undue wastage.

Contaminated runoff from storage will be captured in ditches or ponds with an oil

trap at the outlet.

Materials wasted on site will be reused at the same place.

4.4.2 Waste management & recycling

The construction waste includes debris, concrete (often recycled and reused at the site),

steel and other metals, pallets, packaging and paper products, fluorescent tubes, wood

beams, joists, studs, baseboards, cabinets and cupboards, railings, brick, doors and

casings, interior windows, bathroom fixtures, light fixtures, ceiling grid and tile, furnishings

etc.

Waste recycling Plan

Waste and recycling plans will be developed prior to beginning construction activity. The

plan aims at identifying wastes to be generated, and designate handling, recycling and

disposal method to be followed.

Handling Handling of waste material requires special precautions such as personal protective

equipment and special procedures to prevent the injury. Safe operating methods will be

developed for waste collection, storage, and disposal operations in a manner to protect the

health and safety of personnel, minimize environmental impact and promote material

recovery and recycling.

Page 14: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

13 13

Waste Segregation

Gross segregation of construction wastes into roadwork materials, structural building

material, salvaged building parts and site clearance wastes will be done and additional

segregation will be done to facilitate reuse/ recycling.

Storage Adequate provision will be made for storage of solid waste and for easy access to the

dustbins

• for labours from source to the place of storage, and

• from the place of storage to a collection point specified by the waste

collection authority and/or contractor

Three colours of wheeled bins:

o Dark grey for inert waste,

o Green for wood and ply waste and

o Blue for hazardous waste will be used.

A minimum of 4% of the total site area will be allocated for storage and pretreatment of

the waste. This storage area will be covered to prevent any impact on surrounding.

5.0 ENVIRONMENTAL MANAGEMENT PLAN DURING OPERATION PHASE

5.1 Air Emission Management

During operation of the proposed Retail cum Multiplex complex, the emissions will be

mainly from DG Sets which will be used for backup power supply and vehicles. Emissions

will be mainly Particulate matter, NHMC, CO and Nitrogen dioxide.

The following control measures will be taken up during the operation

All the internal roads will be grass paved. This will reduce the dust generation due to

the vehicular movement

Stack of adequate height will be provided to the DG Sets as per CPCB guidelines

Green belt will be developed in the premises of complex which will act as sink for air

emissions

Hence there will not be any impact on surrounding environment due to the air emissions

from the proposed Retail cum Multiplex complex.

Page 15: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

14 14

BASELINE DATA

Baseline data has been monitored at the site for particulate Matter (PM2.5), particulate

Matter (PM10), Sulphur dioxide (SO2) & Nitrogen oxides (NOx) concentrations. The following

table shows the baseline concentrations.

PARAMETER 98th Percentile CONCENTRATION

(g/m3)

PM(2.5) 25.1

PM(10) 41.6

SO2 13.1

NOx 19.2

CO 540

EMISSIONS:

The emission data from the stacks is shown in below Table.

Type of Stack Emission Rate (QS) in g/s

PM HC NOx CO

DG Sets

(3 x 2000 kVA)

0.2

per DG set

0.7

per DG set

5.1

per DG set

1.9

per DG set

Industrial Source Complex (ISC-3) Model has been applied for prediction of incremental rise

in Ground Level Concentrations of PM10, NOx & CO due to the proposed Project. The

maximum Ground Level Concentrations occur at a distance of 300 m from the stack in the

down wind direction. The emissions due to vehicular traffic are also considered in the

Modeling. The following table shows the Net resultant concentrations of PM10, NOx & CO.

NET RESULTANT MAXIMUM CONCENTRATIONS DUE TO THE PROJECT

Item PM10

µg/m3

NOx

µg/m3

CO

µg/m3

Maximum baseline

Concentration in the Project area 41.6 19.2 540

Maximum predicted incremental rise in concentration due to the project

0.8 2.5 9.5

Net Resultant concentration after occupancy of complex

42.4 21.7 549.5

Page 16: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

15 15

National Ambient Air Quality Standards vide order No. S.O. 826

dated 16-11-2009

100 80 2000

The net resultant concentration of PM10, NOx & CO are within the National Ambient Air

Quality Standards. Hence there will not be any adverse impact on air environment due to

the proposed project.

Recommendations

a. All the internal roads shall be grass paved to reduce the fugitive dust due to vehicle

movement.

b. Greenbelt shall be provided around the boundary and along the internal roads.

5.2 WATER POLLUTION MANAGEMENT

Water usage for applications such as flushing and washing will be as high as 93% of water

demand in any building. In view of the above, we proposed to adopt the following measures

to reduce this demand

Water meter conforming to ISO standards will be installed at the inlet point of water

uptake and at the discharge point to monitor the daily water consumption. This would

also enable the user to identify if there are any points of leakages.

Dual flush systems will be installed in order to allow different volume of water for

flushing liquids and solids.

Sensors based fixtures will be fitted which function only in presence of users. These

sensor-operated taps help in reducing water consumption and also result in

maintaining better hygiene

Tap aerators will be installed which facilitate cleaning through increasing the pressure

at which the water is delivered even at low flow rates.

Pressure reduction device will be installed which will affect the discharge rate and also

to maintain uniform flow at different levels.

Waste water generation

Only source of waste water generation will be sanitary waste water which will be treated in

STP with Moving bed bio-reactor. The treated waste water will be utilized for non-potable

Page 17: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

16 16

purposes like Toilet flushing & gardening. Remaining waste water will be discharged in to

the nearest drain.

During construction of Retail cum Multiplex complex Dual Plumbing system will be done.

Two separate water tanks will be provided for storingTreated wastewater & another for

fresh water. Separate pipeline system will be provided to treated wastewater tank to pump

the water for toilet flushing & gardening purposes. There by net water withdrawal will be

reduced.

The total Water Requirement - 200 KLD

Total Wastewater generated - 185 KLD

The Treated wastewater reused - 126 KLD

The net water requirement after reuse - 74 KLD

The following are the characteristics of Untreated Wastewater

Constituent Unit Range

pH --- 6.5-7.5

Dissolved mg/L 250-850

Volatile mg/L 100-300

Suspended mg/L 100-400

Settelable mg/L 50-200

BOD5 mg/L 100-400

COD mg/L 200-1,000

Total Nitrogen mg/L 15-90

Alkalinity mg/L 50-200

Grease mg/L 50-150

Total Coliform colonies/100 mL 106-108

5.3 SOLID WASTE

Waste, generated by Retail cum Multiplex complex will be generally from restaurants,

plastic & metal and dusting. In the proposed Retail cum Multiplex complex, waste

segregation will be done at the source by placing two types of the bins at all the strategic

locations.

Green: Bio-degradable waste (tissue paper, food waste etc)

Page 18: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

17 17

Blue : Non-biodegradable waste (plastic, metal waste etc)

The plastic waste will be disposed off to the waste recyclers and bio-degradable waste will

be disposed to the GMC bins. Exploration will be done to supply bio-degradable waste to

the agencies undertaking bio-composting activities.

The following will be the solid waste generation during operation of the Retail cum

Multiplex complex

S. No SOLID WASTE QUANTITY DISPOSAL

1. Municipal Solid

Waste

2.2 MT/day

The garbage will be segregated at

source through collection bins into Bio-

degradable waste and Non Bio-

degradable waste. Plastic waste will be

given to the waste recyclers and bio-

degradable waste will be disposed to

the GMC bins

2. Sludge from STP 18.5 Kg/day Stored in HDPE bags and will be used

as manure / given to farmers.

3. Waste oil 100 Lit /Annum Will be given to SPCB approved

vendors.

5.4 NOISE LEVEL MANAGEMENT

DG sets will be provided with acoustic enclosure, which would restrict the noise level to 75

dB(A) at a distance of l m from the acoustic enclosure. The DG sets would be mounted on

the anti vibration pads to restrict the vibration. There will be slight increase in traffic noise

due to the proposed project. However the Noise levels will be within the standards

prescribed by CPCB / SPCB. Hence there will not be any impact on Noise environment due

to the proposed project.

5.5 LAND ENVIRONMENT

All the pavements in the site area will be grass paved, which will mitigate the dust

generation from the vehicles. Vehicle speed in the complex area will be reduced which will

reduce the emissions. Greenbelt will be developed in the complex area which will acts as

sink for the emissions.

Page 19: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

18 18

Hence there will not be any deposition of pollutants in the surrounding area.

The sanitary waste water generated from the Retail cum Multiplex complex will be treated

in Moving Bed Bio Film reactor and treated waste water will be reused for non-potable

purposes like flushing and greenbelt development. No wastewater will be disposed to the

outside. Hence zero discharge system will be implemented.

The solid waste generated from the complex will be disposed as per norms.

Hence there will not be any impact on land environment due to the proposed Retail cum

Multiplex complex

Recommendations

a) Land scaping will be done along the periphery of the compound wall.

5.6 GREEN BELT DEVELOPMENT

Greenbelt will be developed all around the periphery of the compound wall along with some

part of the Greenbelt will be developed in Open spaces. The greenbelt shall be developed

simultaneously with the plant construction. This will further mitigate the pollution impacts.

Greenbelt plantation

Greenbelt is developed in a set of rows of trees planted in such a way that they form an

effective barrier between the plant and the surroundings. The main purpose of greenbelt

development is to contribute to the following factors.

To maintain the ecological homeostatus.

To attenuate the dust emissions and lower SO2 levels

To prevent the soil erosion.

To attenuate the noise levels.

To utilize the treated effluents.

Selection of species

The following main criteria will be followed for selection of plants:

• Trees, shrubs having dense foliage with a large surface area, as leaves absorb

pollutants.

• Evergreen trees as they are found to be more effective.

Page 20: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

19 19

• The species resistant to pollutants, particularly in the early stages of their growth.

The following species are planned to be selected for greenbelt development in the complex

premises

Spathodea campanulata

Delonix regia

Saraca asoca

Muntingia calabura

Jacaranda mimosifolia

Terminalia catapa

Mangifera indica

Azadirachta indica

Greenbelt development plan

Green belt will be developed all around the complex area

Out of the total site area 570 Sq.m of area will be allocated for greenbelt

development

The tree species to be selected for the plantation are pollutant tolerant, fast

growing, wind firm, deep rooted.

5.7. RAINWATER HARVESTING

In the proposed complex prior planning has been to construct a rain water harvesting pits

will be constructed to augment the precious rain water. Due to this impact on groundwater

table will be minimized.

Measures to ensure water quality

To ensure the good quality of rain water the following control measures are proposed

o Catchments such as roofs will be made accessible for regular cleaning and ensuring

no dead animals etc are present on the surface.

o The roof will be made of non- toxic material, having smooth, hard and dense surface

o All gutter ends will be fitted with a wire mesh screen and a first flush device will be

installed. Most of the debris carried by the water from the rooftop like leaves, plastic

Page 21: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

20 20

bags and paper pieces will be arrested by the mesh at the terrace outlet and

contamination will be prevented to a large extent by ensuring that the runoff from the

first 10-20 minutes of rainfall is flushed off. Remaining contaminants like silt and blow

dirt will be removed by installing appropriate filters.

o No sewage or wastewater will be admitted into the system.

o For runoff from parking lots and roads, grease filters etc. will be arranged to prevent

risk of contamination from chemical spillage.

Total Harvested Rainwater

Site is proposed to have rain water storage of 10 Cum. Excess rain water will be

diverted to recharging pits. A total 10 no's of recharging pits, each with 3 cum/day

capacity will be provided.

Total Harvested Rainwater

Rain water harvesting structures will be constructed to harvest the run-off water

from roof tops by laying a separate storm water drainage system for recharging of

ground water.

Ground rainwater harvesting system: Artificial recharge or ground water rainwater harvesting is a process by which the

rain water from paved areas will be collected through a storm water network. And

will be connected to Rainwater harvesting pit.

Rooftop rainwater harvesting system:

In rooftop harvesting, the roof becomes the catchments, and the rainwater will be

collected from the roof of the each building. Rainwater from roof or terrace will

transported using PVC gutters. Rainwater harvesting pits collect all the rainwater. So

that groundwater table will be recharged and utilized for future use.

Page 22: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

21 21

5.8 FIRE PROTECTION SYSTEM

As per the provisions of the Fire Service Act, 1999, we will obtain permission from A.P State

Disasters Response & Fire Services Department from fire safety point of view.

6.0 BUDGET ALLOCATION FOR ENVIRONMENTAL PROTECTION

The following table furnishes the cost for Environmental protection for each section

S. NO PURPOSE CAPITAL COST

(in Rs. Lakhs)

RECURRING COST

(in Rs. Lakhs/annum)

1. Air emission management

Paving of internal roads 29.57 4

Chimney for DG sets 9.00 0.1

Greenbelt development 0.48 1.6

2. Water & waste water

management

Water meters 0.45 0.03

Dual plumbing system 15.00 0.1

STP 60.00 18

3. Rain water harvesting

system

Rain water harvesting pits 1.00 0.1

Rain water storage tank 1.00 --

4 Solid waste management

Two bins at every 750

Sq.m 0.36 2.0

Organic waste convertor 15.00 1.0

5 Environmental monitoring --

6 Other energy conservation

measures like Solar

panels, LED etc

30.00 --

Total 161.86 26.93

The in charge who is experienced in environmental aspects will look after monitoring

schedules and will coordinate with the Govt. authorities.

Page 23: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

22 22

6.0 POST PROJECT MONITORING STRATEGY

The monitoring of various environmental parameters is necessary which forms part of the

environmental protection measures. Monitoring is an important feature because the

efficiency of control measures can only be determined by monitoring. A comprehensive

monitoring program is given under. Locations and frequency of monitoring as per the

guidelines of SPCB and MOEF are tabulated below.

MONITORING SCHEDULE FOR ENVIRONMENTAL PARAMETERS

S. No. Particulars Frequency of Monitoring

Duration of sampling

Parameters required to be

monitored

1. Water quality

A. Ground Water

quality in the

site

Once in a month

except for heavy

metals.

Grab sampling

(24 hourly)

As per IS: 10500

B. Wastewater Once in a month Grab sampling As per IS: 2490

2. Air Quality

A. Stack

Monitoring

Once in a month PM, NMHC, CO & NOX

Page 24: PHOENIX MULTIPLEX PVT. LTD. - … · PHOENIX MULTIPLEX PVT. LTD. (Retail cum Multiplex Complex) Town Sy. No. # 506, Ward No. 20, Block No. 17, Nagarampalem ward, G.T. Road, Guntur,

Environmental Management Plan PHOENIX MULTIPLEX PVT. LTD. RETAIL CUM MULTIPLEX

23 23

CONCLUSIONS

1. Dust curtains will be used to reduce the dust emissions during construction of proposed

project.

2. The flue gases from the D.G. Set will be let out through a stack of adequate height for

effective dispersion of emissions into the atmosphere. The resultant Ground Level

Concentrations of PM, NHMC, NOX & CO in the post project scenario are within the

National Ambient Air Quality Standards (NAAQS). Hence there will not be any adverse

impact on air environment due to the proposed project.

3. All Driveways & internal roads will be grass paved.

4. Wastewater generated from the apartment will be treated in sewage treatment plant

and will be utilized for non-potable purposes like Toilet flushing and gardening.

Remaining treated waste water will be discharged into the nearest drain

5. Rain Water Harvesting pits will be provided to augment the precious rain water and

ground water recharge

6. The Solid waste in the form of garbage will be segregated at source into bio-degradable

and non-bio-degradable waste. Plastic waste will be given to the authorized recyclers

and bio-degradable waste will be sent to GMC.

7. Greenbelt of 570 Sq.m will be developed all around the project site.

8. Adequate firefighting equipment’s will be implemented as per the National Building

Code.