Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
i
WOOTTON HALL PARK
TEMPORARY ACCOMMODATION NORTHAMPTONSHIRE, NN4 0JQ
32920
UNDERGROUND DRAINAGE REPORT
PUBLIC HEALTH ENGINEERING SERVICES
32920-XX-XX-SP-P-001
Mace Limited 155 Moorgate London EC2M 6XB Tel. +44 (0) 203522 3000 www.macegroup.com
Revision Date Description Made Checked
A 20.04.2016
Preliminary
NJ MF
B 09.06.2016
Preliminary
NJ MF
C 13.06.2016
Preliminary
NJ MF
ii
1. Public Health Engineering Services ........................................................................ 1
1.1. Design and Construction Standards .................................................................... 1
1.2. External Services ................................................................................................ 1
1.3. Below Ground Drainage ...................................................................................... 1
1.3.1. Foul Waste Drainage ....................................................................................... 2
1.3.1. Surface Water Drainage ................................................................................... 2
1.3.1.1. Design ........................................................................................................... 2
Appendices ................................................................................................................... 4
Mace Information Handling Classification – unrestricted
1
1. Public Health Engineering Services
The objective of this report is to present the strategy for the discharge of foul water and discharge of surface water from the temporary site.
1.1. Design and Construction Standards
The Design and Installation of the Public Health Services shall be carried out in compliance with the following but not limited to:
• Relevant British Standards and Codes of Practices issued by the British Standards Institution
• The current issue of The Building Regulations
• The current Health and Safety Regulations including the Construction (Design and Management) Regulations 2015
• CIBSE Guides, Codes of Practice, Application Manuals, Technical Memoranda and other similar publications
• The local planning requirements
• The current issue of the relevant DfES Building Bulletins
1.2. External Services
The new external services shall be provided as required. It is the Main Contractor’s responsibility to liaise with the utility suppliers for diversion of existing services and provision of new services serving the school’s temporary accommodation.
1.3. Below Ground Drainage
Design Parameters The below ground drainage installation shall be designed in accordance with BS EN 752, Northamponshire Local Floor Risk Management Strategy:2013 and Part H of the Building Regulations together with the following.
• Northamptonshire County Council requirement for the surface water network is to be designed based on a frequency of 1 in 200 years with 20% increase due to climate change.
• Surface water discharge into the sewer network is to be restricted
• Time of entry – 2 minutes
• Minimum self-cleansing velocity – 0.75 m/sec
• Roughness co-efficient 'ks' – 0.6 surface water, 1.5 foul water
• Foul water network designed on the discharge unit method
• Depth of flow – 100% surface water, 70% foul water
Mace Information Handling Classification – unrestricted
2
The surface water drainage network shall be designed in full at detail design stage, and shall comply with the guidance given in Sewers for Adoption 7th edition, which is:
• No surcharge of the pipe system in 1 year return period
• No surface flooding in 30 year return period
• No nuisance flooding in the 100 year period, plus climate change factor
In addition to this, the local authority requirement shall be adhered to. This is:
• No nuisance flooding in the 200 year period, plus climate change factor
A sensitivity assessment of a 1 in 200 year event plus 40% climate change has been conducted. See Appendix C.
1.3.1. Foul Waste Drainage
Foul drainage pipes shall connect the internal system to the sewer network at slopes in accordance with the Building Regulations AD Part H 2010. The main foul water drain is anticipated to be 100mm based on a flow of 6.25l/s and laid at a minimum slope of 1% to enable a suitable velocity for self-cleansing.
1.3.1. Surface Water Drainage
The flood risk assessment by RPS Health, Safety and Evironment, dated May 2016, provides that the proposed temporary school location is:
• Not at risk of coastal or tidal flooding
• Not at risk of fluvial flooding
• Not at risk of surface water flooding (under certain conditions)
• Not at risk of groundwater flooding
• Not a risk of flooding due to the sewers
1.3.1.1. Design
Anglian Water pre-devepment assessment report allows a maximum discharge of 6.53l/s into the existing local sewer network. A flow control manhole shall be installed to provide this maximum discharge from the site. The ground investigation report by Soiltechnics dated May 2016 provided that the soil was “dark brown, gravelly, clayey sand and sandly gravelly clay”. Gravels of chalk were also encountered during the survey. The infiltration rate on site was found to be approximately 1.52 x 10-6 m/s and 7.47 x 10-6 m/s or 0.005472m/hr and 0.0268956m/hr, at depths of 2.02m and 4m respectively. This infiltration rate (falling into the sandy clay loam region) is inkeeping with the SuDS manual:2007 determination of a satisfactory soil type (see Table 4.7) for infiltration systems.
Mace Information Handling Classification – unrestricted
3
As it is a requirement under H3 (3) of the Building Regulations to where possible discharge stormwater via local soakaways, the design follows this requirement. The following PIMP classification is used for calculations:
Impermeable factor %
Road/ Existing car park 90
Roof of school building 95
Permeable paths/ bike storage 40
Permeable hard play area/ courts 70
Permeable paving 40
Garden 10
Two rain gardens shall be built between the hard play area/ car park and sports field. Due to the slope of the site, the rain gardens shall serve to attenuate flows towards the school by capturing surface runoff and transporting it through pipework to a series of infiltration devices. From observations of digital data, it has been determined that the North sitting carpark has not been provided with any drainage. The South carpark design however, utilises permeable parking and is connected to a drainage network. Details of this network are not known. The contractor shall confirm these assumptions and conduct any required surveys and investigations. This report shall demonstrate that there is no increase in runoff from the proposed South carpark and the walkway through the park, into any drainage network, in a 1 in 1, 1 in 30, 1 in 100 and 1 in 200 year return event. Rainfall increase due to climate change is considered here. All additional bays to these car parks and footpaths shall be designed and installed with permeable components. All runoff from the North, East and South areas around the building are to be routed to the rain gardens to reduce the possible occurrence of flooding. This requirement for infiltration devices is inkeeping with the design want for maximum discharge into the soil. As a result flows are routed around the site (to maximise the occurance of onsite surface water retention). Site discharge is restricted by use of a hydrobrake to 6.53l/s.
Mace Information Handling Classification – unrestricted
4
Appendices
Appendix A – 32920-MAC-XX-XX-DR-P-001 _ Underground Drainage Layout Appendix B - 32920-XX-XX-SP-P-002 _ Underground Drainage Calculations Appendix C - 32920-XX-XX-SP-P-003 _ Underground Drainage Sensitivity
Assessment
SV
P
SV
P
Science
Classroom
83sqm
KS1 / Yr 1
55sqm
KS1 / Yr 1
55sqm
KS1 / Yr 2
55sqm
KS1 / Yr 2
55sqm
Reception Classroom
63sqm
Reception Classroom
62sqm
Core 2
38sqm
Core 1
16sqm
Boys WC
17sqm
Girls WC
17sqm
Business
Manager's
Office
11sqm
Reception
WCs
18sqm
Hall
136sqm
Reception Desk
Interview Room
8.2sqm
Lift
SVP
SVP
Circulation
112sqm
CLN
Store
1.2sqm
Reception/
Admin
21sqm
Boys Changing
28sqm
Hygiene Room
13sqm
Copier
5.5sqm
IT Server
8.5sqm
Kitchen
32sqm
Girls Changing
27sqm
WC
3.6sqm
Store
14.7sqm
200 seated
pupils
Lobby
26sqm
Science
Prep
10sqm
Disabled
WC
4sqm
WC
2.2sqm
Layout &
Requirements TBC
with Kitchen Specialist
23
22
16
15
17
24
8
20
21
5
4
7
6
9
103
2
1
B
T
B
T
99.22
99.24
PALISADE TIMBER GATE
WOOTTON HALL PARK ROAD
SENIOR STAFF PARKING
PEDESTRIAN ROUTE
MAIN
ENTRANCE
2.1M HIGH FENCE
SERVICE VEHICLE
PARKING
VISITOR BAYS
DISABLED PARKING
SCHOOL
BUILDING
2.1M HIGH SECURE FENCE LINE
GRASS PITCH
HARD COURT GAMES
HARD COURT GAMES
RECEPTION
YEAR PLAY
HARD PLAY SPACE
1.2M HIGH PALISADE TIMBER FENCE
COVERED
PLAY
BIN
STORE
DROP OFF ZONE
DROP OFF ZONE
DROP OFF ZONE
DROP OFF ZONE
DROP OFF ZONE
DROP OFF ZONE
CONSTRUCTION ACCESS
60 X STAFF & PARENT PARKING SPACES
SAFE WALKING ZONE
BIKE STORAGE
CLUB
ACCESS GATE
(LOCKABLE)
PEDESTRIAN / CYCLE ROUTE
EXISTING
GATE
ACCESS GATE
(LOCKABLE)
VISITOR BIKE
STORAGE
TRENCH SOAKWAY
TRENCH SOAKWAY
CL: 99.69IL: TBC
CL: 99.04IL: TBC
CL: 98.69IL: TBC
CL: 98.65IL: TBC
CL: 98.8IL: 97.5
CL: 99.150IL: TBC
CL: 99.210IL: 95.691
CL: 98.6IL: 94.889CL: 98.12
IL: 94.77
375mm
375mm
100mm
CL: 98.80IL: TBC
CL: 98.69IL: TBC
MAIN PROPOSED SURFACE WATER DRAINAGE ROUTES
PROPOSED LAND DRAINAGE AREA
MAIN PROPOSED FOUL WATER DRAINAGE ROUTES
RAIN GARDEN
DRAINAGE CHANNEL
PERMEABLE PARKING
MAIN PROPOSED SURFACE WATER DRAINAGE ROUTES -PERFORATED PIPE
TRENCH SOAKAWAY
MANHOLE
LEGEND
LAND DRAINAGE
NO DRAINAGE REQUIRED
DESIGN NOTES
SITE AREA = 1.85ha
TOTAL PROPOSED IMPERMEABLE AREA = 0.503ha
PROPOSED RESTRICTED SURFACE WATER DISCHARGE RATE = 6.53l/s
PROPOSED FOUL WATER DISCHARGE RATE = 0-6.25l/s
REV DATE DESCRIPTION DRAW CHK
1 13/06/2016 REVISED SITE PLAN JH NJ/MF
Safety, Health and Environmental Information
The significant unusual hazards / risks associated with this type of work are
noted as:
CONSTRUCTION
Ci NONE
Cii
OPERATION AND MAINTENANCE
Oi NONE
Oii
DISMANTLING/ DEMOLITION
Di NONE
Dii
NOTE - TO BE READ IN CONJUNCTION WITH THE CDM RISK REGISTER
REV.SHEET NO.
of
PROJECT NO.
DRAWN BY
DATECHK BY
DRAWING TITLE
PROJECT TITLE
CLIENT
PROJECT STATUS
155 Moorgate, London, EC2M 6XB
www.macegroup.com
KEYPLAN
INFORMATION HANDLING CLASSIFICATION
ORIG. SHEET SIZE
A1
SCALE
@
© COPYRIGHT Mace Group
· NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.
· BECAUSE OF POSSIBLE SCALING ERRORS IN ELECTRONIC AND HARDCOPY
REPRODUCTION DO NOT SCALE FOR CONSTRUCTION PURPOSES.
· ALL DIMENSIONS TO BE CHECKED & VERIFIED ON SITE PRIOR TO CONSTRUCTION.
APPD. BY
DATE
DATE
32920-MAC-XX-ZZ-M2-P-UG DRAINAGE.dwg
ORIGINATOR ZONE TYPE DWG. NO.DISC.
- - - - -
LEVEL
32920
WOTTON HALL PARK
TEMPORARY ACCOMMODATION
UNDERGROUND DRAINAGE
LAYOUT
MAC XX ZZ DR P 001
A 11:5001 1
JH 09.06.16
NJ 09.06.16
MF 09.06.16
PLANNING
RESTRICTED
Mace Ltd Page 1
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
STORM SEWER DESIGN by the Modified Rational Method
Design Criteria for Proposed_Revised
©1982-2014 XP Solutions
Pipe Sizes STANDARD Manhole Sizes STANDARD
FSR Rainfall Model - England and Wales
Return Period (years) 200 Add Flow / Climate Change (%) 0
M5-60 (mm) 20.700 Minimum Backdrop Height (m) 0.200
Ratio R 0.450 Maximum Backdrop Height (m) 1.500
Maximum Rainfall (mm/hr) 50 Min Design Depth for Optimisation (m) 1.200
Maximum Time of Concentration (mins) 30 Min Vel for Auto Design only (m/s) 1.00
Foul Sewage (l/s/ha) 0.000 Min Slope for Optimisation (1:X) 500
Volumetric Runoff Coeff. 0.750
Designed with Level Soffits
Time Area Diagram for Proposed_Revised at outfall S (pipe S5.003)
Time
(mins)
Area
(ha)
Time
(mins)
Area
(ha)
Time
(mins)
Area
(ha)
0-4 0.112 4-8 0.338 8-12 0.003
Total Area Contributing (ha) = 0.453
Total Pipe Volume (m³) = 31.803
Time Area Diagram at outfall S (pipe S8.001)
Time
(mins)
Area
(ha)
0-4 0.038
Total Area Contributing (ha) = 0.038
Total Pipe Volume (m³) = 0.065
Time Area Diagram at outfall S (pipe S9.001)
Time
(mins)
Area
(ha)
0-4 0.012
Total Area Contributing (ha) = 0.012
Total Pipe Volume (m³) = 0.062
Mace Ltd Page 2
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Network Design Table for Proposed_Revised
©1982-2014 XP Solutions
PN Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Auto
Design
S5.000 13.686 0.234 58.5 0.021 2.00 0.0 0.600 o 100
S5.001 15.719 0.228 69.1 0.008 0.00 0.0 0.600 o 300
S6.000 39.565 0.676 58.5 0.011 2.00 0.0 0.600 o 100
S6.001 41.297 0.706 58.5 0.019 0.00 0.0 0.600 o 100
S6.002 38.247 0.227 168.5 0.128 0.00 0.0 0.600 o 300
S7.000 31.714 0.319 99.4 0.076 2.00 0.0 0.600 o 225
S6.003 71.466 0.426 167.8 0.039 0.00 0.0 0.600 o 300
S6.004 85.293 0.226 377.4 0.127 0.00 0.0 0.600 o 450
S5.002 29.530 0.119 248.2 0.024 0.00 0.0 0.600 o 375
S5.003 37.183 0.118 315.1 0.000 0.00 0.0 0.600 o 375
S8.000 3.208 0.055 58.5 0.038 2.00 0.0 0.600 o 100
S8.001 1.013 0.017 59.6 0.000 0.00 0.0 0.600 o 225
S9.000 2.876 0.096 30.0 0.012 2.00 0.0 0.600 o 100
S9.001 1.003 0.050 20.0 0.000 0.00 0.0 0.600 o 225
Network Results Table
PN Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
S5.000 50.00 2.23 97.360 0.021 0.0 0.0 0.0 1.01 7.9 2.9
S5.001 50.00 2.36 96.926 0.029 0.0 0.0 0.0 1.89 133.9 3.9
S6.000 50.00 2.65 97.500 0.011 0.0 0.0 0.0 1.01 7.9 1.5
S6.001 50.00 3.34 96.824 0.030 0.0 0.0 0.0 1.01 7.9 4.1
S6.002 50.00 3.86 95.918 0.158 0.0 0.0 0.0 1.21 85.4 21.3
S7.000 50.00 2.40 97.600 0.076 0.0 0.0 0.0 1.31 52.1 10.2
S6.003 50.00 4.85 95.691 0.272 0.0 0.0 0.0 1.21 85.6 36.8
S6.004 50.00 6.21 95.115 0.399 0.0 0.0 0.0 1.04 165.5 54.0
S5.002 50.00 6.64 94.889 0.453 0.0 0.0 0.0 1.15 126.5 61.3
S5.003 50.00 7.25 94.798 0.453 0.0 0.0 0.0 1.02 112.1 61.3
S8.000 50.00 2.05 97.550 0.038 0.0 0.0 0.0 1.01 7.9 5.1
S8.001 50.00 2.06 97.370 0.038 0.0 0.0 0.0 1.70 67.5 5.1
S9.000 50.00 2.03 97.550 0.012 0.0 0.0 0.0 1.41 11.1 1.7
S9.001 50.00 2.04 97.329 0.012 0.0 0.0 0.0 2.94 116.9 1.7
Mace Ltd Page 3
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Manhole Schedules for Proposed_Revised
©1982-2014 XP Solutions
MH
Name
MH
CL (m)
MH
Depth
(m)
MH
Connection
MH
Diam.,L*W
(mm)
PN
Pipe Out
Invert
Level (m)
Diameter
(mm)
PN
Pipes In
Invert
Level (m)
Diameter
(mm)
Backdrop
(mm)
S18 98.660 1.300 Open Manhole 1200 S5.000 97.360 100
S19 98.580 1.654 Open Manhole 1200 S5.001 96.926 300 S5.000 97.126 100
S14 98.800 1.300 Open Manhole 1200 S6.000 97.500 100
S15 99.280 2.456 Open Manhole 1200 S6.001 96.824 100 S6.000 96.824 100
S16 99.250 3.332 Open Manhole 1200 S6.002 95.918 300 S6.001 96.118 100
S17 98.950 1.350 Open Manhole 1200 S7.000 97.600 225
S17 99.210 3.519 Open Manhole 1200 S6.003 95.691 300 S6.002 95.691 300
S7.000 97.281 225 1515
S9 98.040 2.925 Open Manhole 1350 S6.004 95.115 450 S6.003 95.265 300
S20 98.600 3.711 Open Manhole 1350 S5.002 94.889 375 S5.001 96.698 300 1735
S6.004 94.889 450
S11 98.120 3.350 Open Manhole 1350 S5.003 94.798 375 S5.002 94.770 375
S 96.670 1.990 Open Manhole 0 OUTFALL S5.003 94.680 375
S23 98.850 1.300 Open Manhole 1200 S8.000 97.550 100
S13 99.860 2.490 Open Manhole 1200 S8.001 97.370 225 S8.000 97.495 100
S 98.850 1.497 Open Manhole 0 OUTFALL S8.001 97.353 225
S16 98.850 1.300 Open Manhole 1200 S9.000 97.550 100
S17 98.850 1.521 Open Manhole 1200 S9.001 97.329 225 S9.000 97.454 100
S 99.850 2.571 Open Manhole 0 OUTFALL S9.001 97.279 225
Mace Ltd Page 4
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Area Summary for Proposed_Revised
©1982-2014 XP Solutions
Pipe
Number
PIMP
Type
PIMP
Name
PIMP
(%)
Gross
Area (ha)
Imp.
Area (ha)
Pipe Total
(ha)
5.000 Classification Roof 95 0.013 0.012 0.012
Classification Permeable paving 40 0.023 0.009 0.021
5.001 Classification Permeable paving 40 0.020 0.008 0.008
6.000 Classification Permeable paving 40 0.027 0.011 0.011
6.001 Classification Permeable paving 40 0.012 0.005 0.005
Classification Garden 10 0.145 0.015 0.019
6.002 Classification Garden 10 0.183 0.018 0.018
Classification Hard play 70 0.063 0.044 0.063
Classification Roof 95 0.068 0.065 0.128
7.000 Classification Hard play 70 0.108 0.076 0.076
6.003 Classification Garden 10 0.124 0.012 0.012
Classification Permeable paving 40 0.029 0.012 0.024
Classification Garden 10 0.127 0.013 0.037
Classification Garden 10 0.010 0.001 0.038
Classification Garden 10 0.009 0.001 0.039
6.004 Classification Hard play 70 0.148 0.104 0.104
User - 100 0.023 0.023 0.127
5.002 Classification Garden 10 0.244 0.024 0.024
5.003 - - 95 0.000 0.000 0.000
8.000 Classification Permeable paving 40 0.071 0.029 0.029
Classification Permeable paving 40 0.023 0.009 0.038
8.001 - - 95 0.000 0.000 0.000
9.000 Classification Permeable paving 40 0.027 0.011 0.011
Classification Permeable paving 40 0.004 0.002 0.012
9.001 - - 95 0.000 0.000 0.000
Total Total Total
1.504 0.503 0.503
Free Flowing Outfall Details for Proposed_Revised
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
S5.003 S 96.670 94.680 0.000 0 0
Free Flowing Outfall Details for Proposed_Revised
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
S8.001 S 98.850 97.353 0.000 0 0
Mace Ltd Page 5
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Free Flowing Outfall Details for Proposed_Revised
©1982-2014 XP Solutions
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
S9.001 S 99.850 97.279 0.000 0 0
Simulation Criteria for Proposed_Revised
Volumetric Runoff Coeff 0.750 Additional Flow - % of Total Flow 0.000
Areal Reduction Factor 1.000 MADD Factor * 10m³/ha Storage 2.000
Hot Start (mins) 2 Inlet Coeffiecient 0.800
Hot Start Level (mm) 0 Flow per Person per Day (l/per/day) 0.000
Manhole Headloss Coeff (Global) 0.500 Run Time (mins) 20160
Foul Sewage per hectare (l/s) 0.000 Output Interval (mins) 24
Number of Input Hydrographs 0 Number of Storage Structures 7
Number of Online Controls 3 Number of Time/Area Diagrams 0
Number of Offline Controls 0 Number of Real Time Controls 0
Synthetic Rainfall Details
Rainfall Model FSR Profile Type Summer
Return Period (years) 200 Cv (Summer) 0.750
Region England and Wales Cv (Winter) 0.840
M5-60 (mm) 20.800 Storm Duration (mins) 10080
Ratio R 0.450
Mace Ltd Page 6
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Online Controls for Proposed_Revised
©1982-2014 XP Solutions
Hydro-Brake Optimum® Manhole: S20, DS/PN: S5.002, Volume (m³): 19.7
Unit Reference MD-SHE-0089-6500-3972-6500
Design Head (m) 3.972
Design Flow (l/s) 6.5
Flush-Flo™ Calculated
Objective Minimise upstream storage
Diameter (mm) 89
Invert Level (m) 94.889
Minimum Outlet Pipe Diameter (mm) 150
Suggested Manhole Diameter (mm) 1200
Control Points Head (m) Flow (l/s)
Design Point (Calculated) 3.972 6.5
Flush-Flo™ 0.386 3.9
Kick-Flo® 0.796 3.1
Mean Flow over Head Range - 4.7
The hydrological calculations have been based on the Head/Discharge relationship for the
Hydro-Brake Optimum® as specified. Should another type of control device other than a
Hydro-Brake Optimum® be utilised then these storage routing calculations will be
invalidated
Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s)
0.100 2.7 1.200 3.7 3.000 5.7 7.000 8.5
0.200 3.6 1.400 4.0 3.500 6.1 7.500 8.8
0.300 3.8 1.600 4.2 4.000 6.5 8.000 9.1
0.400 3.9 1.800 4.5 4.500 6.9 8.500 9.3
0.500 3.8 2.000 4.7 5.000 7.2 9.000 9.6
0.600 3.7 2.200 4.9 5.500 7.6 9.500 9.8
0.800 3.1 2.400 5.1 6.000 7.9
1.000 3.4 2.600 5.3 6.500 8.2
Depth/Flow Relationship Manhole: S13, DS/PN: S8.001, Volume (m³): 2.8
Invert Level (m) 97.495
Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s)
1.000 0.0000 2.000 0.0000 3.000 0.0000
Depth/Flow Relationship Manhole: S17, DS/PN: S9.001, Volume (m³): 1.7
Invert Level (m) 97.423
Mace Ltd Page 7
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Depth/Flow Relationship Manhole: S17, DS/PN: S9.001, Volume (m³): 1.7
©1982-2014 XP Solutions
Depth (m) Flow (l/s) Depth (m) Flow (l/s)
1.000 0.0000 3.000 0.0000
Mace Ltd Page 8
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Storage Structures for Proposed_Revised
©1982-2014 XP Solutions
Bio-Retention Area Manhole: S15, DS/PN: S6.001
Invert Level (m) 96.461 Porosity 1.00
Depth (m) Area (m²) Depth (m) Area (m²)
0.000 14.0 2.819 14.0
Bio-Retention Area Manhole: S16, DS/PN: S6.002
Invert Level (m) 95.871 Porosity 1.00
Depth (m) Area (m²) Depth (m) Area (m²)
0.000 32.0 3.379 32.0
Bio-Retention Area Manhole: S17, DS/PN: S6.003
Invert Level (m) 95.413 Porosity 1.00
Depth (m) Area (m²) Depth (m) Area (m²)
0.000 140.0 3.797 140.0
Bio-Retention Area Manhole: S9, DS/PN: S6.004
Invert Level (m) 94.980 Porosity 1.00
Depth (m) Area (m²) Depth (m) Area (m²)
0.000 80.0 3.060 80.0
Filter Drain Manhole: S20, DS/PN: S5.002
Infiltration Coefficient Base (m/hr) 0.00274 Trench Length (m) 50.0
Infiltration Coefficient Side (m/hr) 0.00547 Pipe Diameter (m) 0.200
Safety Factor 2.0 Pipe Depth above Invert (m) 3.600
Porosity 0.30 Slope (1:X) 300.0
Invert Level (m) 94.739 Cap Volume Depth (m) 0.000
Trench Width (m) 1.0 Cap Infiltration Depth (m) 0.000
Mace Ltd Page 9
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Trench Soakaway Manhole: S23, DS/PN: S8.000
©1982-2014 XP Solutions
Infiltration Coefficient Base (m/hr) 0.00274 Trench Width (m) 1.0
Infiltration Coefficient Side (m/hr) 0.00547 Trench Length (m) 80.0
Safety Factor 2.0 Slope (1:X) 500.0
Porosity 0.30 Cap Volume Depth (m) 0.000
Invert Level (m) 96.850 Cap Infiltration Depth (m) 0.000
Trench Soakaway Manhole: S16, DS/PN: S9.000
Infiltration Coefficient Base (m/hr) 0.00274 Trench Width (m) 1.0
Infiltration Coefficient Side (m/hr) 0.00547 Trench Length (m) 80.0
Safety Factor 2.0 Slope (1:X) 500.0
Porosity 0.30 Cap Volume Depth (m) 0.000
Invert Level (m) 96.850 Cap Infiltration Depth (m) 0.000
Mace Ltd Page 10
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Summary of Critical Results by Maximum Level (Rank 1) for Proposed_Revised
©1982-2014 XP Solutions
Simulation Criteria
Areal Reduction Factor 1.000 Additional Flow - % of Total Flow 0.000
Hot Start (mins) 2 MADD Factor * 10m³/ha Storage 2.000
Hot Start Level (mm) 0 Inlet Coeffiecient 0.800
Manhole Headloss Coeff (Global) 0.500 Flow per Person per Day (l/per/day) 0.000
Foul Sewage per hectare (l/s) 0.000
Number of Input Hydrographs 0 Number of Storage Structures 7
Number of Online Controls 3 Number of Time/Area Diagrams 0
Number of Offline Controls 0 Number of Real Time Controls 0
Synthetic Rainfall Details
Rainfall Model FSR Ratio R 0.450
Region England and Wales Cv (Summer) 0.750
M5-60 (mm) 20.800 Cv (Winter) 0.840
Margin for Flood Risk Warning (mm) 300.0 DVD Status OFF
Analysis Timestep Fine Inertia Status OFF
DTS Status ON
Profile(s) Summer and Winter
Duration(s) (mins) 15, 30, 60, 120, 180, 240, 360, 480, 600,
720, 960, 1440, 2160, 2880, 4320, 5760,
7200, 8640, 10080
Return Period(s) (years) 1, 30, 100, 200
Climate Change (%) 20, 20, 20, 20
PN Storm
Return
Period
Climate
Change
First X
Surcharge
First Y
Flood
First Z
Overflow
O/F
Act.
Lvl
Exc.
S5.000 15 Summer 200 +20% 30/15 Summer
S5.001 15 Summer 200 +20%
S6.000 15 Summer 200 +20% 100/15 Summer
S6.001 30 Winter 200 +20% 200/15 Winter
S6.002 360 Winter 200 +20%
S7.000 15 Summer 200 +20% 100/15 Summer
S6.003 360 Winter 200 +20% 100/180 Winter
S6.004 360 Winter 200 +20% 30/60 Winter
S5.002 360 Winter 200 +20% 30/30 Summer
S5.003 4320 Winter 200 +20%
S8.000 960 Winter 200 +20% 100/180 Winter
S8.001 1440 Winter 200 +20% 30/600 Winter
S9.000 600 Winter 200 +20%
S9.001 360 Winter 30 +20%
PN
US/MH
Name
Water
Level
(m)
Surch'ed
Depth (m)
Flooded
Volume
(m³)
Flow /
Cap.
O'flow
(l/s)
Pipe
Flow
(l/s) Status
S5.000 S18 98.109 0.649 0.000 1.90 0.0 14.3 SURCHARGED
Mace Ltd Page 11
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-002_REV A.MDX Checked by M.F.
XP Solutions Network 2014.1.1
Summary of Critical Results by Maximum Level (Rank 1) for Proposed_Revised
©1982-2014 XP Solutions
S5.001 S19 97.011 -0.215 0.000 0.18 0.0 20.0 OK
S6.000 S14 97.718 0.118 0.000 1.07 0.0 8.4 SURCHARGED
S6.001 S15 96.965 0.041 0.000 1.03 0.0 8.0 SURCHARGED
S6.002 S16 96.189 -0.028 0.000 0.17 0.0 13.3 OK
S7.000 S17 98.101 0.276 0.000 1.31 0.0 63.9 SURCHARGED
S6.003 S17 96.187 0.197 0.000 0.27 0.0 22.3 SURCHARGED
S6.004 S9 96.183 0.618 0.000 0.06 0.0 9.5 SURCHARGED
S5.002 S20 96.181 0.917 0.000 0.03 0.0 3.9 SURCHARGED
S5.003 S11 94.845 -0.328 0.000 0.04 0.0 3.9 OK
S8.000 S23 97.979 0.329 0.000 0.04 0.0 0.3 SURCHARGED
S8.001 S13 98.081 0.486 0.000 0.00 0.0 0.0 SURCHARGED
S9.000 S16 97.253 -0.397 0.000 0.00 0.0 0.0 OK
S9.001 S17 97.329 -0.225 0.000 0.00 0.0 0.0 OK
PN
US/MH
Name
Water
Level
(m)
Surch'ed
Depth (m)
Flooded
Volume
(m³)
Flow /
Cap.
O'flow
(l/s)
Pipe
Flow
(l/s) Status
Mace Ltd Page 1
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
STORM SEWER DESIGN by the Modified Rational Method
Design Criteria for Proposed_Revised
©1982-2014 XP Solutions
Pipe Sizes STANDARD Manhole Sizes STANDARD
FSR Rainfall Model - England and Wales
Return Period (years) 200 Add Flow / Climate Change (%) 0
M5-60 (mm) 20.700 Minimum Backdrop Height (m) 0.200
Ratio R 0.450 Maximum Backdrop Height (m) 1.500
Maximum Rainfall (mm/hr) 50 Min Design Depth for Optimisation (m) 1.200
Maximum Time of Concentration (mins) 30 Min Vel for Auto Design only (m/s) 1.00
Foul Sewage (l/s/ha) 0.000 Min Slope for Optimisation (1:X) 500
Volumetric Runoff Coeff. 0.750
Designed with Level Soffits
Time Area Diagram for Proposed_Revised at outfall S (pipe S5.003)
Time
(mins)
Area
(ha)
Time
(mins)
Area
(ha)
Time
(mins)
Area
(ha)
0-4 0.112 4-8 0.338 8-12 0.003
Total Area Contributing (ha) = 0.453
Total Pipe Volume (m³) = 31.803
Time Area Diagram at outfall S (pipe S8.001)
Time
(mins)
Area
(ha)
0-4 0.038
Total Area Contributing (ha) = 0.038
Total Pipe Volume (m³) = 0.065
Time Area Diagram at outfall S (pipe S9.001)
Time
(mins)
Area
(ha)
0-4 0.012
Total Area Contributing (ha) = 0.012
Total Pipe Volume (m³) = 0.062
Mace Ltd Page 2
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Network Design Table for Proposed_Revised
©1982-2014 XP Solutions
PN Length
(m)
Fall
(m)
Slope
(1:X)
I.Area
(ha)
T.E.
(mins)
Base
Flow (l/s)
k
(mm)
HYD
SECT
DIA
(mm)
Auto
Design
S5.000 13.686 0.234 58.5 0.021 2.00 0.0 0.600 o 100
S5.001 15.719 0.228 69.1 0.008 0.00 0.0 0.600 o 300
S6.000 39.565 0.676 58.5 0.011 2.00 0.0 0.600 o 100
S6.001 41.297 0.706 58.5 0.019 0.00 0.0 0.600 o 100
S6.002 38.247 0.227 168.5 0.128 0.00 0.0 0.600 o 300
S7.000 31.714 0.319 99.4 0.076 2.00 0.0 0.600 o 225
S6.003 71.466 0.426 167.8 0.039 0.00 0.0 0.600 o 300
S6.004 85.293 0.226 377.4 0.127 0.00 0.0 0.600 o 450
S5.002 29.530 0.119 248.2 0.024 0.00 0.0 0.600 o 375
S5.003 37.183 0.118 315.1 0.000 0.00 0.0 0.600 o 375
S8.000 3.208 0.055 58.5 0.038 2.00 0.0 0.600 o 100
S8.001 1.013 0.017 59.6 0.000 0.00 0.0 0.600 o 225
S9.000 2.876 0.096 30.0 0.012 2.00 0.0 0.600 o 100
S9.001 1.003 0.050 20.0 0.000 0.00 0.0 0.600 o 225
Network Results Table
PN Rain
(mm/hr)
T.C.
(mins)
US/IL
(m)
Σ I.Area
(ha)
Σ Base
Flow (l/s)
Foul
(l/s)
Add Flow
(l/s)
Vel
(m/s)
Cap
(l/s)
Flow
(l/s)
S5.000 50.00 2.23 97.360 0.021 0.0 0.0 0.0 1.01 7.9 2.9
S5.001 50.00 2.36 96.926 0.029 0.0 0.0 0.0 1.89 133.9 3.9
S6.000 50.00 2.65 97.500 0.011 0.0 0.0 0.0 1.01 7.9 1.5
S6.001 50.00 3.34 96.824 0.030 0.0 0.0 0.0 1.01 7.9 4.1
S6.002 50.00 3.86 95.918 0.158 0.0 0.0 0.0 1.21 85.4 21.3
S7.000 50.00 2.40 97.600 0.076 0.0 0.0 0.0 1.31 52.1 10.2
S6.003 50.00 4.85 95.691 0.272 0.0 0.0 0.0 1.21 85.6 36.8
S6.004 50.00 6.21 95.115 0.399 0.0 0.0 0.0 1.04 165.5 54.0
S5.002 50.00 6.64 94.889 0.453 0.0 0.0 0.0 1.15 126.5 61.3
S5.003 50.00 7.25 94.798 0.453 0.0 0.0 0.0 1.02 112.1 61.3
S8.000 50.00 2.05 97.550 0.038 0.0 0.0 0.0 1.01 7.9 5.1
S8.001 50.00 2.06 97.370 0.038 0.0 0.0 0.0 1.70 67.5 5.1
S9.000 50.00 2.03 97.550 0.012 0.0 0.0 0.0 1.41 11.1 1.7
S9.001 50.00 2.04 97.329 0.012 0.0 0.0 0.0 2.94 116.9 1.7
Mace Ltd Page 3
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Manhole Schedules for Proposed_Revised
©1982-2014 XP Solutions
MH
Name
MH
CL (m)
MH
Depth
(m)
MH
Connection
MH
Diam.,L*W
(mm)
PN
Pipe Out
Invert
Level (m)
Diameter
(mm)
PN
Pipes In
Invert
Level (m)
Diameter
(mm)
Backdrop
(mm)
S18 98.660 1.300 Open Manhole 1200 S5.000 97.360 100
S19 98.580 1.654 Open Manhole 1200 S5.001 96.926 300 S5.000 97.126 100
S14 98.800 1.300 Open Manhole 1200 S6.000 97.500 100
S15 99.280 2.456 Open Manhole 1200 S6.001 96.824 100 S6.000 96.824 100
S16 99.250 3.332 Open Manhole 1200 S6.002 95.918 300 S6.001 96.118 100
S17 98.950 1.350 Open Manhole 1200 S7.000 97.600 225
S17 99.210 3.519 Open Manhole 1200 S6.003 95.691 300 S6.002 95.691 300
S7.000 97.281 225 1515
S9 98.040 2.925 Open Manhole 1350 S6.004 95.115 450 S6.003 95.265 300
S20 98.600 3.711 Open Manhole 1350 S5.002 94.889 375 S5.001 96.698 300 1735
S6.004 94.889 450
S11 98.120 3.350 Open Manhole 1350 S5.003 94.798 375 S5.002 94.770 375
S 96.670 1.990 Open Manhole 0 OUTFALL S5.003 94.680 375
S23 98.850 1.300 Open Manhole 1200 S8.000 97.550 100
S13 99.860 2.490 Open Manhole 1200 S8.001 97.370 225 S8.000 97.495 100
S 98.850 1.497 Open Manhole 0 OUTFALL S8.001 97.353 225
S16 98.850 1.300 Open Manhole 1200 S9.000 97.550 100
S17 98.850 1.521 Open Manhole 1200 S9.001 97.329 225 S9.000 97.454 100
S 99.850 2.571 Open Manhole 0 OUTFALL S9.001 97.279 225
Mace Ltd Page 4
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Area Summary for Proposed_Revised
©1982-2014 XP Solutions
Pipe
Number
PIMP
Type
PIMP
Name
PIMP
(%)
Gross
Area (ha)
Imp.
Area (ha)
Pipe Total
(ha)
5.000 Classification Roof 95 0.013 0.012 0.012
Classification Permeable paving 40 0.023 0.009 0.021
5.001 Classification Permeable paving 40 0.020 0.008 0.008
6.000 Classification Permeable paving 40 0.027 0.011 0.011
6.001 Classification Permeable paving 40 0.012 0.005 0.005
Classification Garden 10 0.145 0.015 0.019
6.002 Classification Garden 10 0.183 0.018 0.018
Classification Hard play 70 0.063 0.044 0.063
Classification Roof 95 0.068 0.065 0.128
7.000 Classification Hard play 70 0.108 0.076 0.076
6.003 Classification Garden 10 0.124 0.012 0.012
Classification Permeable paving 40 0.029 0.012 0.024
Classification Garden 10 0.127 0.013 0.037
Classification Garden 10 0.010 0.001 0.038
Classification Garden 10 0.009 0.001 0.039
6.004 Classification Hard play 70 0.148 0.104 0.104
User - 100 0.023 0.023 0.127
5.002 Classification Garden 10 0.244 0.024 0.024
5.003 - - 95 0.000 0.000 0.000
8.000 Classification Permeable paving 40 0.071 0.029 0.029
Classification Permeable paving 40 0.023 0.009 0.038
8.001 - - 95 0.000 0.000 0.000
9.000 Classification Permeable paving 40 0.027 0.011 0.011
Classification Permeable paving 40 0.004 0.002 0.012
9.001 - - 95 0.000 0.000 0.000
Total Total Total
1.504 0.503 0.503
Free Flowing Outfall Details for Proposed_Revised
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
S5.003 S 96.670 94.680 0.000 0 0
Free Flowing Outfall Details for Proposed_Revised
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
S8.001 S 98.850 97.353 0.000 0 0
Mace Ltd Page 5
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Free Flowing Outfall Details for Proposed_Revised
©1982-2014 XP Solutions
Outfall
Pipe Number
Outfall
Name
C. Level
(m)
I. Level
(m)
Min
I. Level
(m)
D,L
(mm)
W
(mm)
S9.001 S 99.850 97.279 0.000 0 0
Simulation Criteria for Proposed_Revised
Volumetric Runoff Coeff 0.750 Additional Flow - % of Total Flow 0.000
Areal Reduction Factor 1.000 MADD Factor * 10m³/ha Storage 2.000
Hot Start (mins) 2 Inlet Coeffiecient 0.800
Hot Start Level (mm) 0 Flow per Person per Day (l/per/day) 0.000
Manhole Headloss Coeff (Global) 0.500 Run Time (mins) 20160
Foul Sewage per hectare (l/s) 0.000 Output Interval (mins) 24
Number of Input Hydrographs 0 Number of Storage Structures 7
Number of Online Controls 3 Number of Time/Area Diagrams 0
Number of Offline Controls 0 Number of Real Time Controls 0
Synthetic Rainfall Details
Rainfall Model FSR Profile Type Summer
Return Period (years) 200 Cv (Summer) 0.750
Region England and Wales Cv (Winter) 0.840
M5-60 (mm) 20.800 Storm Duration (mins) 10080
Ratio R 0.450
Mace Ltd Page 6
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Online Controls for Proposed_Revised
©1982-2014 XP Solutions
Hydro-Brake Optimum® Manhole: S20, DS/PN: S5.002, Volume (m³): 19.7
Unit Reference MD-SHE-0089-6500-3972-6500
Design Head (m) 3.972
Design Flow (l/s) 6.5
Flush-Flo™ Calculated
Objective Minimise upstream storage
Diameter (mm) 89
Invert Level (m) 94.889
Minimum Outlet Pipe Diameter (mm) 150
Suggested Manhole Diameter (mm) 1200
Control Points Head (m) Flow (l/s)
Design Point (Calculated) 3.972 6.5
Flush-Flo™ 0.386 3.9
Kick-Flo® 0.796 3.1
Mean Flow over Head Range - 4.7
The hydrological calculations have been based on the Head/Discharge relationship for the
Hydro-Brake Optimum® as specified. Should another type of control device other than a
Hydro-Brake Optimum® be utilised then these storage routing calculations will be
invalidated
Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s)
0.100 2.7 1.200 3.7 3.000 5.7 7.000 8.5
0.200 3.6 1.400 4.0 3.500 6.1 7.500 8.8
0.300 3.8 1.600 4.2 4.000 6.5 8.000 9.1
0.400 3.9 1.800 4.5 4.500 6.9 8.500 9.3
0.500 3.8 2.000 4.7 5.000 7.2 9.000 9.6
0.600 3.7 2.200 4.9 5.500 7.6 9.500 9.8
0.800 3.1 2.400 5.1 6.000 7.9
1.000 3.4 2.600 5.3 6.500 8.2
Depth/Flow Relationship Manhole: S13, DS/PN: S8.001, Volume (m³): 2.8
Invert Level (m) 97.495
Depth (m) Flow (l/s) Depth (m) Flow (l/s) Depth (m) Flow (l/s)
1.000 0.0000 2.000 0.0000 3.000 0.0000
Depth/Flow Relationship Manhole: S17, DS/PN: S9.001, Volume (m³): 1.7
Invert Level (m) 97.423
Mace Ltd Page 7
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Depth/Flow Relationship Manhole: S17, DS/PN: S9.001, Volume (m³): 1.7
©1982-2014 XP Solutions
Depth (m) Flow (l/s) Depth (m) Flow (l/s)
1.000 0.0000 3.000 0.0000
Mace Ltd Page 8
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Storage Structures for Proposed_Revised
©1982-2014 XP Solutions
Bio-Retention Area Manhole: S15, DS/PN: S6.001
Invert Level (m) 96.461 Porosity 1.00
Depth (m) Area (m²) Depth (m) Area (m²)
0.000 14.0 2.819 14.0
Bio-Retention Area Manhole: S16, DS/PN: S6.002
Invert Level (m) 95.871 Porosity 1.00
Depth (m) Area (m²) Depth (m) Area (m²)
0.000 32.0 3.379 32.0
Bio-Retention Area Manhole: S17, DS/PN: S6.003
Invert Level (m) 95.413 Porosity 1.00
Depth (m) Area (m²) Depth (m) Area (m²)
0.000 140.0 3.797 140.0
Bio-Retention Area Manhole: S9, DS/PN: S6.004
Invert Level (m) 94.980 Porosity 1.00
Depth (m) Area (m²) Depth (m) Area (m²)
0.000 80.0 3.060 80.0
Filter Drain Manhole: S20, DS/PN: S5.002
Infiltration Coefficient Base (m/hr) 0.00274 Trench Length (m) 50.0
Infiltration Coefficient Side (m/hr) 0.00547 Pipe Diameter (m) 0.200
Safety Factor 2.0 Pipe Depth above Invert (m) 3.600
Porosity 0.30 Slope (1:X) 300.0
Invert Level (m) 94.739 Cap Volume Depth (m) 0.000
Trench Width (m) 1.0 Cap Infiltration Depth (m) 0.000
Mace Ltd Page 9
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Trench Soakaway Manhole: S23, DS/PN: S8.000
©1982-2014 XP Solutions
Infiltration Coefficient Base (m/hr) 0.00274 Trench Width (m) 1.0
Infiltration Coefficient Side (m/hr) 0.00547 Trench Length (m) 80.0
Safety Factor 2.0 Slope (1:X) 500.0
Porosity 0.30 Cap Volume Depth (m) 0.000
Invert Level (m) 96.850 Cap Infiltration Depth (m) 0.000
Trench Soakaway Manhole: S16, DS/PN: S9.000
Infiltration Coefficient Base (m/hr) 0.00274 Trench Width (m) 1.0
Infiltration Coefficient Side (m/hr) 0.00547 Trench Length (m) 80.0
Safety Factor 2.0 Slope (1:X) 500.0
Porosity 0.30 Cap Volume Depth (m) 0.000
Invert Level (m) 96.850 Cap Infiltration Depth (m) 0.000
Mace Ltd Page 10
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Summary of Critical Results by Maximum Level (Rank 1) for Proposed_Revised
©1982-2014 XP Solutions
Simulation Criteria
Areal Reduction Factor 1.000 Additional Flow - % of Total Flow 0.000
Hot Start (mins) 2 MADD Factor * 10m³/ha Storage 2.000
Hot Start Level (mm) 0 Inlet Coeffiecient 0.800
Manhole Headloss Coeff (Global) 0.500 Flow per Person per Day (l/per/day) 0.000
Foul Sewage per hectare (l/s) 0.000
Number of Input Hydrographs 0 Number of Storage Structures 7
Number of Online Controls 3 Number of Time/Area Diagrams 0
Number of Offline Controls 0 Number of Real Time Controls 0
Synthetic Rainfall Details
Rainfall Model FSR Ratio R 0.450
Region England and Wales Cv (Summer) 0.750
M5-60 (mm) 20.800 Cv (Winter) 0.840
Margin for Flood Risk Warning (mm) 300.0 DVD Status OFF
Analysis Timestep Fine Inertia Status OFF
DTS Status ON
Profile(s) Summer and Winter
Duration(s) (mins) 15, 30, 60, 120, 180, 240, 360, 480, 600,
720, 960, 1440, 2160, 2880, 4320, 5760,
7200, 8640, 10080
Return Period(s) (years) 100, 200
Climate Change (%) 40, 40
PN Storm
Return
Period
Climate
Change
First X
Surcharge
First Y
Flood
First Z
Overflow
O/F
Act.
Lvl
Exc.
S5.000 15 Summer 200 +40% 100/15 Summer
S5.001 15 Summer 200 +40%
S6.000 15 Summer 200 +40% 100/15 Summer
S6.001 30 Winter 200 +40% 100/15 Winter
S6.002 480 Winter 200 +40% 200/15 Summer
S7.000 15 Summer 200 +40% 100/15 Summer
S6.003 480 Winter 200 +40% 100/60 Winter
S6.004 480 Winter 200 +40% 100/15 Winter
S5.002 480 Winter 200 +40% 100/15 Summer
S5.003 480 Winter 200 +40%
S8.000 960 Winter 200 +40% 100/120 Summer
S8.001 1440 Winter 200 +40% 100/60 Winter
S9.000 720 Winter 200 +40%
S9.001 2160 Winter 100 +40%
PN
US/MH
Name
Water
Level
(m)
Surch'ed
Depth (m)
Flooded
Volume
(m³)
Flow /
Cap.
O'flow
(l/s)
Pipe
Flow
(l/s) Status
S5.000 S18 98.322 0.862 0.000 2.13 0.0 16.0 SURCHARGED
Mace Ltd Page 11
155 Moorgate Wootton Hall Park
London Temporary Accommodation
EC2M 6XB Northamptonshire, NN4 0JQ
Date 13/06/2016 Designed by N.J.
File 32920-XX-XX-SP-P-003_Rev A.mdx Checked by M.F.
XP Solutions Network 2014.1.1
Summary of Critical Results by Maximum Level (Rank 1) for Proposed_Revised
©1982-2014 XP Solutions
S5.001 S19 97.017 -0.209 0.000 0.20 0.0 22.6 OK
S6.000 S14 97.835 0.235 0.000 1.14 0.0 8.9 SURCHARGED
S6.001 S15 97.038 0.115 0.000 1.08 0.0 8.4 SURCHARGED
S6.002 S16 96.373 0.155 0.000 0.15 0.0 12.2 SURCHARGED
S7.000 S17 98.300 0.475 0.000 1.48 0.0 72.4 SURCHARGED
S6.003 S17 96.371 0.380 0.000 0.24 0.0 19.4 SURCHARGED
S6.004 S9 96.366 0.801 0.000 0.06 0.0 8.8 SURCHARGED
S5.002 S20 96.363 1.100 0.000 0.04 0.0 4.1 SURCHARGED
S5.003 S11 94.846 -0.327 0.000 0.04 0.0 4.1 OK
S8.000 S23 98.158 0.508 0.000 0.04 0.0 0.3 SURCHARGED
S8.001 S13 98.251 0.656 0.000 0.00 0.0 0.0 SURCHARGED
S9.000 S16 97.313 -0.337 0.000 0.00 0.0 0.0 OK
S9.001 S17 97.329 -0.225 0.000 0.00 0.0 0.0 OK
PN
US/MH
Name
Water
Level
(m)
Surch'ed
Depth (m)
Flooded
Volume
(m³)
Flow /
Cap.
O'flow
(l/s)
Pipe
Flow
(l/s) Status