PG&E Gas Operations
Gas Safety Excellence
API 1173
2PG&E Confidential
Gas Safety Excellence Framework
3
Our Strategic Drivers
• Provide a systematic framework to build world-class asset management capabilities.
• Proof of our progress as these international certifications can only be achieved through a rigorous, independent third party audit.
• Demonstration of growing strength of our safety culture, our rigorous approach to asset management and our commitment to gas safety excellence.
• Assurance to PG&E’s customers, regulators, and employees that the asset management policies and practices are effective in managing risk.
Why did PG&E Gas Operations launch and sustain Gas Safety Excellence?
4PG&E Confidential
API RP 1173
• Released in July 2015; is the American National Standard for pipeline safety management systems
• Developed to provide a framework for organizations that operate hazardous liquids and gas pipelines in response to major industry incidents
• API RP 1173 provides pipeline operators with safety management system requirements that when applied provide a framework to reveal and manage risk, promote a learning environment, and continuously improve pipeline safety and integrity.
• PG&E was on the American Petroleum Institute (API) advisory committee and helped co-author the standard.
5
Structure of Current Safety Management Systems
PAS 55 StructureAPI 1173 Structure
ISO 55001 Structure
6
Our Gas Safety Excellence Journey
February 2012
October 2012
February 2013
June2013
December2013
February 2014
April - May2014
November2014
February2015
August2015
November2015
Start of
our Program
Lloyds Pre-
AssessmentLloyds Visits
LloydsStage 1
Assessment
Lloyds Stage 2Assessment
Lloyds Surveillance
Visit
Lloyds Surveillance
Visit
Lloyds Surveillance
Visit
Lloyds Assessment
2012 20142013
Baseline Assessment
Progress Updates Full Review of the Asset
Management System
Field-Based Operational
Assessment & Verification
Progress Assessment and Review of Improvements
2015
API 1173PAS 55 and ISO 55001
Full Review and Field
Assessment
7PG&E Confidential
API RP 1173 AssessmentAPI RP 1173 Initial Assessment
Date: November 2015*Interviews Conducted: 30 Miles travelled: ~500Sites visited: 5
Areas of Strength:• Gas Control Center (use of data, tools and
technologies)• Stakeholder engagement – internal and
external• Safety Culture - Use of Corrective Action
Program• Emergency preparedness
Areas of Development:• Formalized collaboration between Integrity
management and Corrosion• Further enhancing the Asset Management
Plans• Competence assessments and QA/QC
incorporated into risk management process
*Annual surveillance assessment will take place in Q4 2016
8
Gas Safety Excellence Progress
Plan
Do
Check
Act
October 2012
4.2 Asset Management Policy
4.3.1 Asset Management Strategy
4.3.2 Asset Management Objectives
4.33 Asset Management Plans
4.4.1. Structure, Authority and Responsibility
4.4.2. Outsourcing
4.4.3 Training, Awareness and Competence
4.4.5 Asset Management System Documentation
4.4.6 Information Management
4.4.7 Risk Management
4.4.8. Legal and Other Requirements
4.4.9. Management of Change
4.5.1 Life Cycle Activities
4.7. Management Review
4.6.1 Performance and Condition Monitoring
4.6.2 Investigation of Asset-Related Failures
4.6.3 Evaluation of Compliance
4.6.4 Audit
4.6.5.1 Corrective and Preventative Action
4.3.4 Contingency Planning
4.5.2 Tools, Facilities and Equipment
4.6.6. Records
4.6.5.2 Continual Improvement
4.4.4 Communication, Participation and Consultation
4.2 Asset Management Policy
4.3.1 Asset Management Strategy
4.3.2 Asset Management Objectives
4.33 Asset Management Plans
4.4.1. Structure, Authority and Responsibility
4.4.2. Outsourcing
4.4.3 Training, Awareness and Competence
4.4.5 Asset Management System Documentation
4.4.6 Information Management
4.4.7 Risk Management
4.4.8. Legal and Other Requirements
4.4.9. Management of Change
4.5.1 Life Cycle Activities
4.7. Management Review
4.6.1 Performance and Condition Monitoring
4.6.2 Investigation of Asset-Related Failures
4.6.3 Evaluation of Compliance
4.6.4 Audit
4.6.5.1 Corrective and Preventative Action
4.3.4 Contingency Planning
4.5.2 Tools, Facilities and Equipment
4.6.6. Records
4.6.5.2 Continual Improvement
4.4.4 Communication, Participation and Consultation
Jan 2016
Major non-conformance
Minor non-conformance
Scope for Improvement
9
What Happens Next?
• Build a plan to address the areas of minor non conformance’s and scopes for improvement
• Maintain and improve the other components of our GSE structure
• Continue to improve the culture within our organization
• Share our journey with other lines of business within PG&E
• Benchmarking with other companies for ways to improve our organization
• Share our story with other utilities and leverage our achievement in providing assurance to stakeholders
INTT
ER
NA
LLY
EX
TER
NA
LLY
10
Joining An Impressive Group