Chapter 18Software Testing Strategies
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
2/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Strategi pengujian perangkat
lunak mengintegrasikanmetode desain test caseperangkat lunak ke dalam
sederetan langkah yangdirencanakan dengan baik,dan hasilnya adalah konstruksi
perangkat lunak yang berhasil
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
3/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Verifikasi dan Validasi
Pengujian PL adl satu elemen dari topik yang
lebih luas yang diacu sebagai verifikasi danvalidasi (V & V)
Verifikasi mengacu pada rangkaian aktivitas yangmemastikan PL secara tepat
mengimplementasikan fungsi tertentuValidasi mengacu pada serangkaian aktivitas
yang berbeda yang memastikan PL yangdibangun dapat ditelusuri ke persyaratan
pelanggan
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
4/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Verifikasi dan Validasi
Definisi V&V meliputi berbagai aktivitas jaminankualitas PL:
Kajian Teknik Format
Metode RPL
Standar dan Prosedur
Software quality assurance (SQA) dan
Software configuration management (SCM)
PengujianPengukuran
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
5/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Testing Strategy
unit test integrationtest
validationtest
systemtest
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
6/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Strategi Pengujian
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
7/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Unit Testing
moduleto be
tested
test cases
results
softwareengineer
Unit testing berkaitan dengan kode danbiasanya berorientasi pada white box
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
8/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Unit Testing (1)
interface
local data structures
boundary conditionsindependent pathserror handling paths
moduleto be
tested
test cases
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
9/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Unit Testing (2)interface : diuji untuk memastikan bahwa informasi secara
tepat mengalir masuk dan keluar dari inti
program yang diujilocal data structures : diuji untuk memastikan bahwa data
yang tersimpan secara temporal dapat menjagaintegritasnya selama semua langkah di dalam
suatu algoritma dieksekusiboundary conditions : untuk memastikan bahwa modul
beroperasi dengan tepat pada batas yang yangditentukan untuk membatasi pemrosesan
independent pathserror handling paths
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
10/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Unit Test Environment
Module
stub stub
driver
RESULTS
interface
local data structures
boundary conditions
independent pathserror handling paths
test cases
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
11/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Integration Testing Strategies
Options:
the big bang approach an incremental construction strategy
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
12/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Top Down Integration
top module is tested withstubs
stubs are replaced one ata time, "depth first"
as new modules are integrated,some subset of tests is re-run
A
B
C
D E
F G
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
13/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Bottom-Up Integration
drivers are replaced one at a
time, "depth first"
worker modules are grouped intobuilds and integrated
A
B
C
D E
F G
cluster
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
14/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Sandwich Testing
Top modules aretested with stubs
Worker modules are grouped intobuilds and integrated
A
B
C
D E
F G
cluster
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
15/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
High Order Testing
validation test
system test
alpha and beta test
other specialized testing
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
16/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Validation Test
Validasi PL dicapai melalui sederetan pengujian
black box (msl: apkh semua persyaratan fungsionadipenuhi, semua persyaratan kinerja dicapai,persyaratan lainnya: transportabilitas,kompatibilitas, pembetulan kesalahan,maintainbilitas)
Kajian konfigurasi
Pengujian alpha (dilakukan pada sisi pengembangoleh pelanggan) dan beta (dilakukan pada satu/lebpelanggan oleh pemakai akhir)
SystemTest
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
17/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
SystemTest Pengujian perbaikan : memaksa PL gagal dan
memeriksa apakah perbaikan dilakukan dengan tepa
Pengujian keamanan: membuktikan apakahmekanisme perlindungan pada sebuah sistem akanbenar-benar dapat melindungi dari case yang tidakbenar
Pengujian stress : didesain untuk melawan program
dalam keadaan abnormal (msl: kecepatan input datadapat ditambah dengan urutan besaran utkmenentukan bgm fungsi input akan merespon, testcase yang membutuhkan memori maks/sumber daya
lain dapat dieksekusi ) Pengujian kinerja : didesain untuk menguji kinerja ru
time dari PL dalam konteks sistem yang terintegrasi
D b i
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
18/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Debugging:A Diagnostic Process
Debugging terjadi akibat dari pengujian yang berhasil.
Jika test case mengungkap kesalahan, maka debugginadl proses menghasilkan penghilangan kesalahan
Debugging bukan pengujian tetapi selalu terjadi sebagBagian akibat dari pengujian
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
19/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
The Debugging Process
test cases
results
Debugging
suspectedcauses
identifiedcauses
corrections
regressiontests
new testcases
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
20/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Debugging Effort
time requiredto diagnose thesymptom anddetermine thecause
time requiredto correct the errorand conductregression tests
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
21/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Symptoms & Causes
symptomcause
symptom and cause may begeographically separated
symptom may disappear whenanother problem is fixed
cause may be due to acombination of non-errors
cause may be due to a systemor compiler error
cause may be due toassumptions that everyonebelieves
symptom may be intermittent
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
22/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Consequences of Bugs
damage
mildannoying
disturbing
serious
extremecatastrophic
infectious
Bug Type
Bug Catego r ies: function-related bugs,
system-related bugs, data bugs, coding bugs,design bugs, documentation bugs, standardsviolations, etc.
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
23/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Debugging Techniques
brute force / testing
backtracking
cause elimination
7/27/2019 Pert 12 Software Testing Strategies + Tmbhn
24/24
These courseware materials are to be used in conjunction with Software Engineering: A Practitioners Approach, 5/e and areprovided with permission by R.S. Pressman & Associates, Inc., copyright 1996, 2001
Debugging: Final Thoughts
Don't run off half-cocked, think about thesymptom you're seeing.
Use tools (e.g., dynamic debugger) to gainmore insight.
If at an impasse, get help from someone else.
Be absolutely sure to conduct regression testswhen you do "fix" the bug.
1.
2.
3.
4.