Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Embed Size (px)

Citation preview

Page 1: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER

Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER

Luis Fernandez-Hernando

STFC/ASTeC Daresbury Lab

Page 2: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

•ILC and CLIC collimation:• Wakefields test beam• Thermo-mechanical studies

•ILC positron target• Radiation/dose studies• Thermo-mechanical studies

•New Light Source beam dump

•ALICE• RF instability problem• BLM

•ITER Central Interlock System

Summary

Page 3: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

ILC and CLIC collimation designILC and CLIC collimation design

ILC 0.5 TeV – 30 kmILC 1 TeV – 50 km

CLIC 3 TeV: 48 kmCLIC 0.5 TeV: 13 km

Page 4: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

The collimator mission is to clean the beam halo from e- or e+ off orbit which could damage the equipment and mainly to stop the photons generated during the bending of the beam towards the Interaction Point. These photons, if not removed, would generate a noise background that would not allow the detectors to work properly.

The spoiler serves as protection for the main collimator body as it will disperse the beam, reducing the beam energy density by multiple Coulomb scattering, in case of a direct bunch hit avoiding severe radiation damage.

CLIC ILC

Energy 1500 GeV 250/500 GeVBunches it has to resist 312 2/1Particles per bunch 3.72E9 2E10σx in the spoiler position 796 µm 111 µmσy in the spoiler position 21.9 µm 9 µm

ILC and CLIC spoilers

Page 5: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

• Long, shallow tapers to reduce short range transverse wakes• High conductivity surface coatings• Robust material for actual beam spoiling• Long path length for errant beams striking spoilers (Large materials

(beryllium…, graphite, ...)• Consider range of constructions, study relative resiliance to damage (melting,

fracture, stress)

Starting pointStarting point

ILC and CLIC spoilers

Page 6: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

Beam Parameters at SLAC ESA and ILCParameter SLAC ESA ILC-500Repetition Rate 10 Hz 5 Hz

Energy 28.5 GeV 250 GeV

Bunch Charge 2.0 x 1010 2.0 x 1010

Bunch Length 300 m 300 m

Energy Spread 0.2% 0.1%

Bunches per train 1 (2*) 2820

Microbunch spacing - (20-400ns*) 337 ns

*possible, using undamped beam

ILC and CLIC spoilers – Wakefields test beam

Page 7: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

T480“wakefield box”

ESA beamline

ILC and CLIC spoilers – Wakefields test beam

Page 8: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

BPMBPMBPM BPM

A run with the beam going through the middle of the collimator (or without the collimator) is used as reference for the next run where the collimator will be moved vertically. This run also serves to calculate the resolution of each BPM.

BPMBPMBPM BPM

The analysis will do a linear fit to the upstream and downstream BPM data separately, per each pulse (bunch) . For this fit the data is weighted using the resolution measured for each BPM.

The slopes of each linear fit are subtracted obtaining a deflection angle. This angle is transformed into V/pC units using the charge reading and the energy of the beam.

All the reconstructed kicks are averaged per each of the different collimator positions and a cubic, or linear fit of the form:

y’ = A3·y3 + A1·y + A0 or y’ = A1·y + A0 (only to collimator positions from -0.6 mm to 0.6 mm)

is done to the result. The error in the kick reconstruction at each collimator position weights the different points for the fit.

The kick factor is defined as the linear term of the fit (A1).

ILC and CLIC spoilers – Wakefields test beam

Page 9: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

Page 10: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

0

1

2

3

4

5

6

7

8

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Collimator number

Kic

k f

acto

r [V

/pC

/mm

]

Experimental data

GdfidL 500 microns

GdfidL 1 mm

ILC and CLIC spoilers – Wakefields test beam

Page 11: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

1 ± 0.1 V/pC/mm

1 ± 0.2 V/pC/mm

1.4 ± 0.3 V/pC/mm

1.7 ± 0.1 V/pC/mm 1.9 ± 0.2 V/pC/mm

1.7 ± 0.1 V/pC/mm 2.6 ± 0.1 V/pC/mm

ILC and CLIC spoilers – Wakefields test beam

Page 12: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Flexural Section (wakefield taper) Peripheral cooling sufficient? Angle varies from 0 at max aperture opening to 90mrad ~5o (full included angle (or ±20mrad about axis)

Precision encoded actuators with bi directional repeatability to <10m (<5m possible?). Note with 10m over 300mm span, 0.03mrad angle control is possible on pitch of collimator surfaces

Vented Side Grill for Wakefield continuity and pumping

Vessel (wire seal UHV compatible)

EntranceTransition FlareFrom 20mm diameter to 30(h)x40(w)mm rectangular section.

Spoiler Block21mm width Ti

Inclined Wakefield Collimator Block Bulk Material – Be, semi-transparent to 500GeV electrons. Converging in 2 steps of opening angle 65mrad (3.7o) & 40mrad (2.3o) nearer the spoiler block (note: opening angle = ± 32.5mrad & ±20mrad about central axis respectively) then diverges at same angular rate downstream of the spoiler block

EPAC08, WEPP168

ILC and CLIC spoilers

Page 13: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Energy spoilers

Energy 1500 GeVBunches it has to resist 312Particles per bunch 3.72E9σx in the spoiler position

779.6 µm

σy in the spoiler position

21.9 µm

Material length needed to spoil beam

0.05 Xo

J.L. Fernandez-Hernando

Page 14: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Resulting stress (using FLUKA and ANSYS) right after a CLIC bunch train has hit the spoiler at 0.2 mm from its bottom (or 4.29 mm from its top). Being the normal orbit of the beam at 8 mm from the bottom of the spoiler (3.51 from the top) that represents a deviation from normal orbit of 10σx.

950MPa, and tensile, which is way above tensile strength limit.

J.L. Fernandez-Hernando

Page 15: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

The top value of stress is ~340MPa and compressive. Meaning that there will not be fracture but there will be a permanent deformation, and in this case it is a vertical deformation of 5 µm, which represents a 0.1% of the half gap. Can we live with that?

But… is a deviation of 10 sigmas even possible?

I have also calculated the stresses when the bunch train hits 0.2mm from the top instead of 4.29 mm (or 4.29 mm from the bottom instead of 0.2). Which means a deviation of “just” 4.75σx.

ILC and CLIC spoilers

Page 16: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Silicon carbide (SiC) foam

Material Radiation length Xo [cm]

Copper 1.44

Ti alloy 3.56

Beryllium 35.3

SiC (solid) 8.1

SiC (foam 8%) 337

SiC is a material with good thermomechanical properties. Used for LHC collimation phase 2, in F1 brakes, and aerospace applications.

It can be used as core material for CLIC spoilers, coated with metal (Be, Cu...)

Very long radiation length of the foam at 8% of nominal density allows for low energy deposition of the particle beam.

ILC and CLIC spoilers

J.L. Fernandez-Hernando

Page 17: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Pros and cons for using SiC foam as core material in CLIC energy spoilers covered by 0.05Xo (in the z direction) of beryllium:

Pros:

• It will not matter the depth the beam hits as it will always see 0.05Xo of beryllium (the contribution of the SiC foam can be negligible).

• Save some beryllium.

Cons:

• The junction of two different materials is a complicate thing, mechanically speaking. The different thermal properties can lead to dislocation or fracture of the junction when the bunch train hits. A single material spoiler is more “whole” in that aspect.

ILC and CLIC spoilers

J.L. Fernandez-Hernando

Page 18: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

ILC positron target studiesILC positron target studies

J.L. Fernandez-Hernando

Page 19: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Right after 8 hours irradiation (no cooling time)

Dose rate [pSv/s]

1 hour cooling time

Simulated a photon irradiation of 8 hours, bunches of 2E10 photons separated 300 ns. (6.67E16 photons/second)

This edge is due to the steel vacuum vessel the target is in

ILC positron target – Radiation and thermal effects

J.L. Fernandez-Hernando

Page 20: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

Page 21: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

J.L. Fernandez-Hernando

Page 22: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

NLS beam dumpNLS beam dump

2.25 GeV e- 2E9 e- per bunch1 MHz frequency meaning 450 kW in total

A high repetition rate coherent FEL, a new class of machine which produces fully controlled X-ray pulses.

J.L. Fernandez-Hernando

Page 23: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

14 cm

7 cm

200 cm 10 cm

Copper backstop

Graphite dump core

Radial copper shell

Water cooling

r

z

Energy density deposition given by FLUKA for a 2 mm radial beam size NLS beam into 200 cm of graphite and 10 cm of copper. Results are normalised per primary particle.

Graphite CopperDensity [g/cm3] 1.71 8.96Critical energy EC [MeV] 84.25 20.17Radiation Length X0 [cm] 25.1 1.44Molière radius RM [cm] 7 1.6Melting Temp Tmelt [C] 3800 1083Operating Temp Top [C] 500-600 <200Static stress limit [MPa] 100-250 at compression

>40 at tensionσ0.2≈150-400

(plasticity limit)Cyclic stress limit [MPa] 60 at compression

30 at tension60-100

NLS beam dump design

J.L. Fernandez-Hernando

Page 24: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Str

ess

[Pa]

Time [seconds]

Equivalent stress (σeq) in the initial sweep spot position in the graphite core and a quadratic fit done to its peaks of stress showing how the stress stabilizes after a period of ~13 seconds at a value nearing 3 MPa

Temperatures achieved in the section of the dump where the electromagnetic shower generated by the beam is at maximum intensity

NLS stress studies – Steady and transient states

Steady state calculation of the temperatures, in degrees C, achieved in the impacting surface of the 200 cm graphite/Cu beam dump using a beam sweep radius of 9 cm with 12 spots

J.L. Fernandez-Hernando

Page 25: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

NLS beam lines, experimental areas and beam dump

J.L. Fernandez-Hernando

Page 26: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

ALICEALICE

Nominal bunch charge on ALICE is 80pC.

The bunches are produced in trains lasting from ~10ns to 100ms and the train repetition frequency can vary from 1 to 20Hz.

Within the train, the bunches are separated by 12.3ns that corresponds to the laser pulse repetition frequency of 81.25MHz.

Page 27: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Booster

Compressor

IR-FEL

Photoinjector Laser

High brightness electron source

Linac

Arc

FEL

Acceleration

LINAC

Deceleration

ALICE : Design, commissioning and running ALICE – Accelerators and Lasers In Combined Experiments

350 keV8.35 MeV35 MeV

Page 28: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

EMMA – The first non scaling FFAG

A FFAG (Fixed Field Alternating Gradient) is a type of accelerator in which the magnetic field in the bending magnets is constant during acceleration. This means the particle beam will move radially outwards as its momentum increases.

A linear non-scaling FFAG is one in which a quantity known as the betatron tune is allowed to vary unchecked. In a conventional synchrotron such a variation would result in loss of the beam. However, in EMMA the beam will cross these resonances so rapidly that their effect should not be seen.

EMMA (Electron Machine for Many Applications) accelerates electrons from 10 to 20 MeV.

J.L. Fernandez-Hernando

Page 29: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

ALICE commissioning and Beam Loss Monitoring system

My tasks:

Characterise the BLM system. Design and carry out experiments. Analyse the signal of the ionisation chambers and of the BPMs to extract a charge measurement that can be correlated with the monitor readings.

Investigate the possible sources of RF phase instability.

Operate the machine both for experiments I am responsible and other experiments related to ALICE.

0

100

200

300

400

500

600

0 50 100 150 200 250 300 350

BC1 crest

LC

1 cr

est

BC1crest v LC1 crest THz

BC1 crest v LC1 crest FEL

BC1 crest v LC1 crest EMMA

BC1 crest v LC1 crest Unknown

Page 30: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

0

100

200

300

400

500

600

0 50 100 150 200 250 300 350

BC1 crest

LC

1 cr

est

BC1crest v LC1 crest THz

BC1 crest v LC1 crest FEL

BC1 crest v LC1 crest EMMA

BC1 crest v LC1 crest Unknown

My tasks:

Characterise the BLM system. Design and carry out experiments. Analyse the signal of the ionisation chambers and of the BPMs to extract a charge measurement that can be correlated with the monitor readings.

Investigate the possible sources of RF phase instability.

Operate the machine both for experiments I am responsible and other experiments related to ALICE.

ALICE commissioning and Beam Loss Monitoring system

Page 31: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

ALICE commissioning and Beam Loss Monitoring system

My tasks:

Characterise the BLM system. Design and carry out experiments. Analyse the signal of the ionisation chambers and of the BPMs to extract a charge measurement that can be correlated with the monitor readings.

Investigate the possible sources of RF phase instability.

Operate the machine both for experiments I am responsible and other experiments related to ALICE.

Page 32: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Example of the signals on a BLM sensor for different dipole currents. The base plateau moves away from zero and needs to be subtracted from the top signal plateau in order to get the real reading value.

To test and characterise the BLM sensors in ALICE a test was done using BLM4 (in ST1), BLM5 (in ARC1) and BLM6 in ST2). Varying the currents on DIP-03 of ST1 and DIP-01, DIP-02 and DIP-03 of ARC1.

The beam loss induced radiation is detected by a series of long ionization chambers (LIC) distributed around the machine. These chambers consist of an air-filled coaxial cable (Andrew HJ4-50, 50 Ω) with a 1 kV potential to attract the ionised gas particles forming a current flow. This current, although very small, can be measured to give an indication of beam loss.

Page 33: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Linearity check on the BLM response

Several measurements were taken for BLM4 whilst maintaining the current setting for ST1 DIP-03 at 20 A. The train length was then incremented from 1 µs to 10 µs to vary the charge the BLM sensor would see.

Example of a test on the ARC-01 BLM sensor. Analysis of the signal for different DIP-01 currents

When we vary the current in DIP-01 we have a high increase of signal which decreases as we move away from nominal. This is due to the beam hitting less beam pipe and less accelerator components such as quadrupoles, sextupoles, screen vacuum vessels, etc. In the lower end of dipole current settings we start to see an increment of BLM signal, which is probably due to backscattering off the lead shielding surrounding the external face of this bending section.

J.L. Fernandez-Hernando

Page 34: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

ITER Central Interlock SystemITER Central Interlock System

J.L. Fernandez-Hernando

Page 35: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

Follow up and manage ITER contracts with different companies and institutes (CERN, Create, Procon) for the creation of a Central Interlock System and Quench Loop prototypes. Design, prepare and carry out tests of the different prototype systems. Investigate the functions to be implemented into the Interlock system to ensure machine safety.

PISPBS-11/41

Simplified Plant Simulator

CIS

PISPBS-34

PISPBS-31

PBS-34 PBS-31

PBS-26

Digital signal

Analog signalICS

prototype

PISPBS-26

PBS-11PBS-41

Redundant PLC system s are used for the Central Interlock System (CIS) and the Plant Interlock System (PIS)

For the prototype two Plant Interlock Systems will be used (Vacuum and Cryo) . Each of them communicates with a single CIS.

ITER Central Interlock System – Machine protection

J.L. Fernandez-Hernando

Page 36: Personal summary of work carried out at Daresbury Laboratory: ILC/CLIC, NLS, ALICE and ITER Luis Fernandez-Hernando STFC/ASTeC Daresbury Lab

ET200M

SM 331

8AI

2xSM

321 32D

I

Quench Detection System Fast Discharge Unit 1 Fast Discharge Unit 9 Power Converter

QL-TF1QL-TF2QL-TF3

Switch closed:No quench

Switch open:Quench detected

Switch closed:Operation ok

Switch open:Spurious opening

Switch closed:Operation ok

Switch open:Spurious opening

Switch closed:Operation ok

Switch open:Discharge request

3TK-2841 S-RELAY

TTT

PROFIBUS DP

CPU414-2DP CPU414-2DP

PROFIBUS DP network for redundant link (via CP-343-5 module

one at each CPU)

IM 153-

2 3xSM

322 16D

O

relay

ITER – Quench Loop prototypeThe Quench Loop main target is to protect the ITER superconducting (sc) magnet system composed of a total number of 48 magnets: 18 Toroidal Field magnets, 6 Poloidal Field magnets, 6 Central Solenoid magnets and 18 Correction Coil magnets.

In order to assure magnet protection throughout the different operational phases, several actors are required: the quench detection system which mission consists of detecting any imminent quench in one of the sc coils, the fast discharge units (FDUs) to extract the energy stored in the magnets, power converters that feed the magnets with current, and finally the central interlock system for magnet protection based on PLC (Programmable Logic Controller) technology.

The quench detectors, the FDUs and power converters can open the Quench Loop if they detect a fault or see the status of the Quench Loop and act accordingly.