Page 1: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

David PenneySr. Principal Engineer, Reliability Services

Performance Indicatorsand

Texas RE 2018 Assessment of Reliability Performance

ROS May 2, 2019

Page 2: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

2

Objectives

Review Performance Indicators

Outline Observations

• North American Electric Reliability Corporation (NERC) State of Reliability report

Overview Activities and Emerging Issues

Data Sources

• Transmission Availability Data Systems (TADS)• Generation Availability Data Systems (GADS)• Misoperation Information Data Analysis System (MIDAS)• Electric Reliability Council of Texas (ERCOT) PI System• ERCOT Market Information System (MIS) historical data

ROS May 2, 2019

Page 3: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

3

Focus Areas

Resource Adequacy and Performance

System Resilience

Changing Resource Mix

Human Performance

Bulk Power System Planning

Loss of Situational Awareness

Protection and Control Systems

Physical and Cyber Security

ROS May 2, 2019

Page 4: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

4

NERC’s Inherent Risk Mapping 2018-19

ROS May 2, 2019

Page 5: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

5

Key Performance Trends for 2014 through 2018

ROS May 2, 2019

Key Performance Indicator Negative Trend * Stable Trend * Positive Trend *

Resource Adequacy

Planning reserve marginNatural gascurtailments

Sufficient operating reserves maintained during summer and winter peaks

Transmission Performance

Outage rates per circuit & per 100 miles0 IROL exceedances

Resource Performance

Inverter generation low voltage ride-through

EFOR ratesNo Balancing Contingency event failures

Primary frequency response

System Inertia

Negative inertia trend during minimum load hours Stable trend during other hours

Misoperation RateIncreased rate in 2018 5-year overall stable trend

Human PerformanceStable trend in generation HP errors

Improving trend in transmission and misoperation HP errors

Situational Awareness7 Loss of EMS events in 2018 State Estimator convergence rate

Page 6: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

6

Resource Adequacy

ROS May 2, 2019

Average recovery time from generation lossevents was 6.2 minutes in 2018 versus 5.4minutes for calendar year 2017. The averageevent recovery time is showing a long-termgradual increase since 2012, but is still wellwithin NERC requirements.

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

2012 2013 2014 2015 2016 2017 2018

Event Recovery Time (Minutes) - Reportable Balancing Contingency Events

0

200

400

600

800

1000

1200

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

NERC Primary Frequency Response Per BAL-003 (MW per 0.1 Hz)

Primary frequency response metrics continue to be maintained at high levels.

Page 7: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

7

Resource Adequacy

ROS May 2, 2019

• The impact of a generator loss is becoming more predictable based on system conditions.

• The relationships between inertia, rate-of-change of frequency, and the MW loss during frequency events are well understood.

R² = 0.6706

0.300

0.350

0.400

0.450

0.500

0.550

0.600

0.650

0.700

0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00%

TI UFLS Margin vs. MW Loss % of RLPCUFLS Margin

MW Loss as a Percentage of RLPCR² = 0.7172

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

0.000 0.001 0.002 0.003 0.004 0.005 0.006 0.007

TI RoCoF (3 sec) vs. MW Loss (MW) divided by Inertia (MW-sec)

MW Loss/Inertia

RoCoF (3 sec)

Page 8: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

8

Resource Adequacy

ROS May 2, 2019

0%

5%

10%

15%

20%

25%

30%

Total Coal, Lignite,Fluidized Bed

GG - Gas Nuclear Gas Turbine/JetEngine (Simple

Cycle Operation)

Combined CycleBlock

CC GT units CC steam units

2014 2015 2016 2017 2018MW Weighted EFOR Fossil Performance Metrics

In 2018, 2,026 immediate forced outage events, totaling 120,037 hours, were reported in GADS.

The majority of the immediate forced outage events were due to boiler control or other control system issues, blade path temperature spreads, fuel piping, human error, and vibration issues.

2018 Fossil Unit Forced Outages

Major System

Number of Forced Outage Events

Total Duration (hours)

Total Capacity

(MW)

Median Duration per Event (hours)

Median Capacity per Event (MW)

Average Duration per Event (hours)

Average Capacity per Event (MW)

Boiler System 199 9,941.8 72,873.2 8.8 300.0 49.9 366.2Balance of Plant 399 12,481.1 84,564.3 4.9 170.0 31.3 211.9Steam Turbine/Generator 1,091 35,929.3 178,597.3 3.6 157.5 32.9 163.7Heat Recovery Steam Generator 92 5,647.6 18,962.9 21.8 185.0 61.4 206.1Pollution Control Equipment 31 938.0 4,431.0 5.3 57.0 30.3 142.9External 114 54,371.7 18,432.9 15.3 102.7 476.9 161.7Regulatory, Safety, Environmental 14 182.8 1,471.6 13.9 85.0 13.1 105.1Personnel/Procedure Errors 78 376.6 19,627.7 2.3 182.0 4.8 251.6Other 8 168.0 247.0 1.8 46.8 21.0 30.9

Page 9: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

9

Resource Adequacy

ROS May 2, 2019

0%

2%

4%

6%

8%

10%

12%

14%

All Summer Winter Shoulder

Wind GenerationResource Equiv Forced Outage Rate Resource Equiv Scheduled Outage Rate

Wind Capacity Factor, Jun-Aug 2018, HE1500-1900

• 2018 was the first full year of mandatory reporting for wind generators > 200 MW in WindGADS

• In 2018, 81 ERCOT wind facilities submitted a total of 795 unit-months of data

• WindGADS provides similar metrics to GADS (EFOR, EAF, NCF, etc.)

• In 2019, mandatory reporting begins for wind units > 100 MW

Page 10: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

10

Resource Adequacy

ROS May 2, 2019

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

Winter Spring Summer Fall

Sum of Unavailable MW due to Gas Curtailments

2012 2013 2014 2015 2016 2017 2018

• Significant increase in the unavailable generation capacity due to natural gas fuel curtailments in 2018.

• Most curtailments occurred in January 2018 during two extreme cold events that month.

Page 11: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

11

System Resilience

ROS May 2, 2019

12

21

18

2

5

3 3

56

43

7

109

5

7

2

14

109

4

8 8

5

9

2

4

8

14

65

4

0

5

10

15

20

25

30

0

5

10

15

20

25

30

20111stQtr

20112ndQtr

20113rdQtr

20114thQtr

20121stQtr

20122ndQtr

20123rdQtr

20124thQtr

20131stQtr

20132ndQtr

20133rdQtr

20134thQtr

20141stQtr

20142ndQtr

20143rdQtr

20144thQtr

20151stQtr

20152ndQtr

20153rdQtr

20154thQtr

20161stQtr

20162ndQtr

20163rdQtr

20164thQtr

20171stQtr

20172ndQtr

20173rdQtr

20174thQtr

20181stQtr

20182ndQtr

20183rdQtr

20184thQtr

EventsTotal Events Cat 4 & 5 Cat 3 Cat 2 Cat 1 Cat 0 Generator Trips >450MW

• There were no Category 2 or higher events in 2018.• During one system event, the voltage collapsed in a local area following a transmission line

fault, resulting in the loss of fourteen 138 kV and 69 kV lines and 140 MW of load.

Page 12: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

12

System Resilience

ROS May 2, 2019

0

0.5

1

1.5

2

2.5

3

3.5

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

ERCOT 345kV Outages / circuit ERCOT 345kV Outages/100 mi-yearERCOT 138kV Sustained Outages / circuit ERCOT 138kV Sustained Outages/100 mi-year

• 345kV and 138kV transmission outage rates remained stable.

Page 13: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

13

System Resilience

ROS May 2, 2019

345 kV circuits111 sustained outages3,447 outage hours

345 kV transformers28 sustained outages19,172 outage hours

138 kV circuits429 sustained outages7,514 outage hours

For 345 kV transmission circuits, failed transmission circuit equipment accounted for 8% of cause and 76% of duration.

For 138 kV transmission circuits, failed substation and transmission circuit equipment accounted for 33% of cause and 85% of duration.

14%

14%

0%5%

5%

4%

22%

7%

8%

2%

5%

14%

2018 345 kV Sustained Outage CauseWeather, ExcludingLightningLightning

Environmental

Contamination

Foreign Interference

Fire

Failed AC SubstationEquipmentFailed Protection SystemEquipmentFailed AC CircuitEquipmentPower System Condition

Human Error

Unknown

3% 0…0% 1%1%

2%5%

3%

76%

2%1%

1% 4%

2018 345 kV Sustained Outage DurationWeather, ExcludingLightningLightning

Environmental

Contamination

Foreign Interference

Fire

Failed AC SubstationEquipmentFailed ProtectionSystem EquipmentFailed AC CircuitEquipmentPower SystemConditionHuman Error

Unknown

Other

4%2%

0%0% 1%

0%

0%

60%

0%

2%

24%

1% 2%1%

1%1%

2018 138 kV Sustained Outage DurationWeather, ExcludingLightningLightning

Environmental

Contamination

Foreign Interference

Vandalism, Terrorism, orMalicious ActsFire

Failed AC SubstationEquipmentFailed AC/DC TerminalEquipmentFailed Protection SystemEquipmentFailed AC CircuitEquipmentVegetation

18%

19%

0%

1%5%

0%1%

18%

0%

3%

15%

1%2%

4%

9%3%

2018 138 kV Sustained Outage Cause Weather, ExcludingLightningLightning

Environmental

Contamination

Foreign Interference

Vandalism, Terrorism, orMalicious ActsFire

Failed AC SubstationEquipmentFailed AC/DC TerminalEquipmentFailed Protection SystemEquipmentFailed AC CircuitEquipmentVegetation

Page 14: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

14

Changing Resource Mix

ROS May 2, 2019

0%

10%

20%

30%

40%

50%

60%

Jan

-08

Apr

-08

Jul-

08

Oct

-08

Jan

-09

Apr

-09

Jul-

09

Oct

-09

Jan

-10

Apr

-10

Jul-

10

Oct

-10

Jan

-11

Apr

-11

Jul-

11

Oct

-11

Jan

-12

Apr

-12

Jul-

12

Oct

-12

Jan

-13

Apr

-13

Jul-

13

Oct

-13

Jan

-14

Apr

-14

Jul-

14

Oct

-14

Jan

-15

Apr

-15

Jul-

15

Oct

-15

Jan

-16

Apr

-16

Jul-

16

Oct

-16

Jan

-17

Apr

-17

Jul-

17

Oct

-17

Jan

-18

Apr

-18

Jul-

18

Oct

-18

Fuel Type as % of Total Energy

Gas Coal Nuclear Renewable12 per. Mov. Avg. (Gas) 12 per. Mov. Avg. (Coal) 12 per. Mov. Avg. (Nuclear) 12 per. Mov. Avg. (Renewable)

• The portion of total energy supplied by natural gas increased in 2018, up from 38% in 2017 to 44% in 2018 due to retirement of multiple coal units.

• Coal’s portion of total energy decreased from 32% in 2017 to 25% in 2018.

Page 15: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

15

Changing Resource Mix

ROS May 2, 2019

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75

MW of ERCOT Units Reporting GADS by Age

Coal/Lignite Nuclear Gas Waste Heat Other

• There is an age bubble around 35–39 years which is driven by coal and some gas units.• Another age bubble around occurs at 12–17 years comprised almost exclusively of

combined cycle units.

Page 16: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

16

Changing Resource Mix

ROS May 2, 2019

Year Minimum Inertia (GW-s) Load (MW) Net Load (MW) IRR %2015 130.3 27,798 20,569 26.1%2016 138.4 26,839 14,797 44.9%2017 130.0 28,443 13,178 53.7%2018 128.8 28,412 13,452 52.7%

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

450,000

0% 10% 20% 30% 40% 50% 60%

IRR % vs Inertia (MW-sec)

Page 17: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

17

Changing Resource Mix

ROS May 2, 2019

120,000

130,000

140,000

150,000

160,000

170,000

180,000

0 50 100 150 200 250 300 350 400 450 500

Inertia Duration Curve

2015 2016 2017 2018

Iner

tia(M

W-s

ec)

Number of Hours

• Average inertia increased across most operating hours in 2018, but decreased during minimum net load conditions.

Page 18: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

18

Human Error Performance

ROS May 2, 2019

Operator error58%

Maintenance personnel error

19%

Contractor error12%

Operating procedure error

5%

Maintenance procdure error

5%

Contractor procedure error

1%

Generator Human Error - by Cause

• 138 kV circuit outage rates caused by human error are showing an improving trend. Generator outage rates caused by human error remain stable.

• Since 2014, there have been 498 generator immediate forced outages caused by human error.

0.00%

1.00%

2.00%

3.00%

4.00%

5.00%

AC Circuit300-399 kV

AC Circuit100-199 kV

Transformer300-399 kV

GeneratorForced Outages

ProtectionSystem

Misoperations

Outages Rates Initiated by Human Error

2015 2016 2017 2018

Page 19: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

19

Human Error Performance

ROS May 2, 2019

• Cause coding for system events continues to yield outstanding data.

• 47% of root cause and contributing causes for system events are related to potential human performance issues.

0

5

10

15

20

25

30

35

40

45

50Event Analysis Cause Codes

Page 20: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

20

Bulk Power System Planning

ROS May 2, 2019

50,000

55,000

60,000

65,000

70,000

75,000

80,000

250,000

275,000

300,000

325,000

350,000

375,000

400,000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Annual Energy Peak DemandGWH

• Load zones with the largest percentage energy increases are the West load zone followed by the North load zone.

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

LZ_AEN LZ_CPS LZ_HOUSTON LZ_LCRA LZ_NORTH LZ_RAYBN LZ_SOUTH LZ_WEST

2011 2012 2013 2014 2015 2016 2017 2018Total Energy by Load Zone (GWH)

• Total annual energy usage was 376.8 GWH, an increase of 5.4% over 2017.

Page 21: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

21

Bulk Power System Planning

ROS May 2, 2019

0%

2%

4%

6%

8%

10%

12%

14%

2019 2020 2021 2022 2023

Summer Reserve Margin EstimatesERCOT December 2018 CDR NERC December 2018 LTRA

• Reference planning reserve margin is 13.75%, based on a 1 event in 10 year loss of load probability.

Page 22: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

22

Loss of Situational Awareness

ROS May 2, 2019

0

1

2

3

4

5

6

7

8

2013 2014 2015 2016 2017 2018

Loss of EMS and SCADA Events Reported by YearCategory 1 events include:• Loss of operator ability to

remotely monitor, control BES elements,

• Loss of communications from SCADA Remote Terminal Units (RTU),

• Unavailability of Inter-Control Center Communications Protocol (ICCP) links,

• Loss of the ability to remotely monitor and control generating units via Automatic Generation Control (AGC), and

• Unacceptable State Estimator or Contingency Analysis solutions for more than 30 minutes.

EMS/SCADA events are a focus point at NERC and federal levels.

Page 23: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

23

Loss of Situational Awareness

ROS May 2, 2019

80000

84000

88000

92000

96000

100000

104000

108000

112000

116000

120000

90.00%

91.00%

92.00%

93.00%

94.00%

95.00%

96.00%

97.00%

98.00%

99.00%

100.00%

Apr-1

2Ju

l-12

Oct

-12

Jan-

13Ap

r-13

Jul-1

3O

ct-1

3Ja

n-14

Apr-1

4Ju

l-14

Oct

-14

Jan-

15Ap

r-15

Jul-1

5O

ct-1

5Ja

n-16

Apr-1

6Ju

l-16

Oct

-16

Jan-

17Ap

r-17

Jul-1

7O

ct-1

7Ja

n-18

Apr-1

8Ju

l-18

Oct

-18

% System Availability Total Telemetry Points

• ERCOT telemetry performance criteria states that 92% of all telemetry provided to ERCOT must achieve a quarterly availability of 80%. For 2018, the average number of telemetry points failing this metric was approximately 4,011 each month, or 3.8% of the total system telemetry points.

Page 24: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

24

Protection and Control System Performance

ROS May 2, 2019

0.0%

2.0%

4.0%

6.0%

8.0%

10.0%

12.0%

14.0%

2011Q1

2011Q2

2011Q3

2011Q4

2012Q1

2012Q2

2012Q3

2012Q4

2013Q1

2013Q2

2013Q3

2013Q4

2014Q1

2014Q2

2014Q3

2014Q4

2015Q1

2015Q2

2015Q3

2015Q4

2016Q1

2016Q2

2016Q3

2016Q4

2017Q1

2017Q2

2017Q3

2017Q4

2018Q1

2018Q2

2018Q3

2018Q4

Overall 345kV 138kV 4 per. Mov. Avg. (Overall)% Misoperation Rate

Page 25: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

25

Protection and Control System Performance

ROS May 2, 2019

0

10

20

30

40

50

60

702011 2012 2013 2014 2015 2016 2017 2018

Page 26: Performance Indicators and Texas RE 2018 Assessment of Reliability Performance · 2019-07-18 · Texas RE 2018 Assessment of Reliability Performance. ROS May 2, 2019. 2. ... Misoperation

26

Questions?

ROS May 2, 2019