33
Profesores: ING Gustavo Castillo ING Francisco Rivas Lara ING José Omar Sánchez MÉTODOS DE ESTUDIOS DIRECCIONALES

Perforacion Direccional Calculos Leo

Embed Size (px)

DESCRIPTION

PERFORACÓN

Citation preview

Page 1: Perforacion Direccional Calculos Leo

Profesores:

ING Gustavo Castillo

ING Francisco Rivas Lara

ING José Omar Sánchez

MÉTODOS DE ESTUDIOS DIRECCIONALES

Page 2: Perforacion Direccional Calculos Leo

2

I, A, DMD

Page 3: Perforacion Direccional Calculos Leo

3

Example - Wellbore Survey Calculations

The table below gives data from a directional survey.

Survey Point Measured Depth Inclination Azimuthalong the wellbore Angle Angle

ft I, deg A, deg

A 3,000 0 20B 3,200 6 6C 3,600 14 20D 4,000 24 80

Based on known coordinates for point C we’ll calculate the coordinates of point D using the above information.

Page 4: Perforacion Direccional Calculos Leo

4

Example - Wellbore Survey Calculations

Point C has coordinates:

x = 1,000 (ft) positive towards the east

y = 1,000 (ft) positive towards the north

z = 3,500 (ft) TVD, positive downwards

Dz

E (x)

N (y)C

DDz

N

D

C

Dy

Dx

Page 5: Perforacion Direccional Calculos Leo

5

Example - Wellbore Survey Calculations

I. Calculate the x, y, and z coordinates

of points D using:

(i) The Average Angle method

(ii) The Balanced Tangential method

(iii) The Minimum Curvature method

(iv) The Radius of Curvature method

(v) The Tangential method

Page 6: Perforacion Direccional Calculos Leo

6

The Average Angle Method

Find the coordinates of point D using

the Average Angle Method

At point C, x = 1,000 ft

y = 1,000 ft

z = 3,500 ft

80 A 24I

20 A 14I

DD

CC

ft 400MD D, to C from depth Measured D

Page 7: Perforacion Direccional Calculos Leo

7

The Average Angle Method

80 A 24I

20 A 14I

ft 400MD D, to C from depth Measured

DD

CC

D

Dz

E (x)

N (y)

C

D

Dz

N

D

C

Dy

Dx

Page 8: Perforacion Direccional Calculos Leo

8

The Average Angle Method

Page 9: Perforacion Direccional Calculos Leo

9

The Average Angle Method

This method utilizes the average

of I1 and I2 as an inclination, the

average of A1 and A2 as a

direction, and assumes the entire

survey interval (DMD) to be

tangent to the average angle.

From: API Bulletin D20. Dec. 31, 1985

2

III 21AVG

AVGAVG AsinIsinMDEast DD

AVGIcosMDVert DD

2

AAA 21

AVG

AVGAVG AcosIsinMDNorth DD

Page 10: Perforacion Direccional Calculos Leo

10

192

2414

2

III DCAVG

The Average Angle Method

502

8020

2

AAA DC

AVG

AVEAVG AsinIsinMDEast DD

50sinsin19400x D

ft76.99x D

Page 11: Perforacion Direccional Calculos Leo

11

The Average Angle Method

AVGIcos400Vert D

cos19400z D

AVGAVG AcosIsinMDNorth DD

ft 71.83y D

50cossin19400y D

ft21.378z D

Page 12: Perforacion Direccional Calculos Leo

12

The Average Angle Method

At Point D,

x = 1,000 + 99.76 = 1,099.76 ft

y = 1,000 + 83.71 = 1,083.71 ft

z = 3,500 + 378.21 = 3,878.21 ft

Page 13: Perforacion Direccional Calculos Leo

13

The Balanced Tangential Method

This method treats half the measured distance

(DMD/2) as being tangent to I1 and A1 and the

remainder of the measured distance (DMD/2) as

being tangent to I2 and A2.

From: API Bulletin D20. Dec. 31, 1985

2211 AsinIsinAsinIsin2

MDEast

DD

2211 AcosIsinAcosIsin2

MDNorth

DD

12 IcosIcos2

MDVert

DD

Page 14: Perforacion Direccional Calculos Leo

14

The Balanced Tangential Method

DDCC AsinIsinAsinIsin2

MDEast

DD

oooo 80sin24sin20sin14sin2

400

ft66.96x D

Page 15: Perforacion Direccional Calculos Leo

15

The Balanced Tangential Method

DDCC AcosIsinAcosIsin2

MDNorth

DD

oooo 80cos24sin20cos14sin2

400

ft59.59y D

Page 16: Perforacion Direccional Calculos Leo

16

The Balanced Tangential Method

CD IcosIcos2

MDVert

DD

oo 14cos24cos2

400

ft77.376z D

Page 17: Perforacion Direccional Calculos Leo

17

The Balanced Tangential Method

At Point D,

x = 1,000 + 96.66 = 1,096.66 ft

y = 1,000 + 59.59 = 1,059.59 ft

z = 3,500 + 376.77 = 3,876.77 ft

Page 18: Perforacion Direccional Calculos Leo

18

Minimum Curvature Method

b

Page 19: Perforacion Direccional Calculos Leo

19

Minimum Curvature Method

This method smooths the two straight-line segments

of the Balanced Tangential Method using the Ratio

Factor RF.

(DL= b and must be in radians)2tan

2RF

b

b

RFAcosIsinAcosIsin2

MDNorth 2211

DD

RFAsinIsinAsinIsin2

MDEast 2211

DD

RFIcosIcos2

MDVert 21

DD

Page 20: Perforacion Direccional Calculos Leo

20

Minimum Curvature Method

)AAcos(1IsinIsinIIcoscos CDDCCD b

)2080cos(124sin14sin1424cos o00ooo

cos b = 0.9356

b = 20.67o

= 0.3608 radians

The Dogleg Angle, b, is given by:

Page 21: Perforacion Direccional Calculos Leo

21

Minimum Curvature Method

The Ratio Factor,

2tan

2RF

b

b

2

67.20tan

3608.0

2RF

o

0110.1RF

Page 22: Perforacion Direccional Calculos Leo

22

Minimum Curvature Method

RFAsinIsinAsinIsin2

MDEast DDCC

DD

0110.180sin24sin20sin14sin2

400 oooo

ft72.97x D

ft72.97011.1*66.96

Page 23: Perforacion Direccional Calculos Leo

23

Minimum Curvature Method

RFAcosIsinAcosIsin2

MDNorth DDCC

DD

ft25.60y D

ft25.60011.1*59.59

0110.180cos24sin20cos14sin2

400 oooo

Page 24: Perforacion Direccional Calculos Leo

24

Minimum Curvature Method

RFIcosIcos2

MDVert CD

DD

0110.114cos24cos2

400 oo

ft91.380z D

ft91.3800110.1*77.376

Page 25: Perforacion Direccional Calculos Leo

25

Minimum Curvature Method

At Point D,

x = 1,000 + 97.72 = 1,097.72 ft

y = 1,000 + 60.25 = 1,060.25 ft

z = 3,500 + 380.91 = 3,880.91 ft

Page 26: Perforacion Direccional Calculos Leo

26

The Radius of Curvature Method

2

CDCD

DCDC 180

AAII

AcosAcosIcosIcosMDEast

DD

2oooo 180

20801424

80cos20cos24cos14cos400

ft 14.59 x D

Page 27: Perforacion Direccional Calculos Leo

27

The Radius of Curvature Method

2

CDCD

CDDC 180

)AA()II(

)AsinA(sin)IcosI(cosMDNorth

DD

2180

)2080)(1424(

)20sin80)(sin24cos400(cos14

ft 79.83 y D

Page 28: Perforacion Direccional Calculos Leo

28

The Radius of Curvature Method

DD

180

II

)IsinI(sinMDVert

CD

CD

ft 73.773 z D

180

1424

)14sin24(sin400 oo

Page 29: Perforacion Direccional Calculos Leo

29

The Radius of Curvature Method

At Point D,

x = 1,000 + 95.14 = 1,095.14 ft

y = 1,000 + 79.83 = 1,079.83 ft

z = 3,500 + 377.73 = 3,877.73 ft

Page 30: Perforacion Direccional Calculos Leo

30

The Tangential Method

ft 400MD D, to C from depth Measured D

80 A 24I

20 A 14I

DD

CC

80sinsin24400

DD AsinIsinMDEast DD

ft 22.160x D

Page 31: Perforacion Direccional Calculos Leo

31

The Tangential Method

DIcosMDVert DD24cos400

ft 42.365z D

DD AcosIsinMDNorth DD

ft 25.28y D

oo 80cos24sin400

Page 32: Perforacion Direccional Calculos Leo

32

The Tangential Method

ft 3,865.42365.423,500z

ft 1,028.2528.251,000 y

ft 1,160.22160.221,000x

D,Point At

Page 33: Perforacion Direccional Calculos Leo

33

Summary of Results (to the nearest ft)

x y z

Average Angle 1,100 1,084 3,878

Balanced Tangential 1,097 1,060 3,877

Minimum Curvature 1,098 1,060 3,881

Radius of Curvature 1,095 1,080 3,878

Tangential Method 1,160 1,028 3,865