SAWGRASS EXPRESSWAY (SR 869) WIDENING FROM SOUTH OF US 441 (SR 7) TO POWERLINE ROAD (SR 845) MILEPOST 18.0-22.0 FINANCIAL PROJECT ID NUMBER: 437153-1-22-01 SAWGRASS EXPRESSWAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PD&E Study PHASE TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & Engineering PHASE 3 Right of Way Acquisition PHASE 4 PHASE Maintenance 6 Construction PHASE 5 PD&E STUDY PROCESS PHASE 2 PD&E Study PHASE 2 Environmental Data Collection Traffic Forecasts Alternatives Development and Analysis PD&E Ends Kick-off Meeting Broward County MPO Municipalities Public Hearing Approvals Final Report Roadway Interchanges Coordination Meetings Recommended Alternative Alternatives Public Workshop No-Build Alternative Build Alternatives No-Build Alternative Build Alternatives Environmental Analysis Alternatives Refinement Start Date: Spring 2016 Completion Date: Spring 2018 Engineering Data Collection Stakeholders Outreach Public Kick-off Meeting Fort Lauderdale Marriott Coral Springs Hotel 11775 Heron Bay Boulevard Coral Springs, Florida 33076 Tuesday, November 15, 2016 5:30 PM - 7:30 PM

PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right

SAWGRASS EXPRESSWAY (SR 869) WIDENINGFROM SOUTH OF US 441 (SR 7) TO POWERLINE ROAD (SR 845)

MILEPOST 18.0-22.0 FINANCIAL PROJECT ID NUMBER: 437153-1-22-01

SAWGRASS EXPRESSWAYPROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

PHA

SE Planning

PD&E StudyPHA

SE

TRANSPORTATION DEVELOPMENT PROCESS

12

Final Design &EngineeringPH

ASE 3

Right of WayAcquisitionPH

ASE 4

PHA

SE Maintenance6

Construction

PHA

SE 5

PD&E STUDY PROCESS

PHASE 2

PD&E StudyPHA

SE 2

EnvironmentalData Collection Traffic Forecasts

Alternatives Developmentand Analysis

PD&E Ends

Kick-off Meeting

Broward County MPO Municipalities

Public Hearing

Approvals

Final Report

Roadway Interchanges

CoordinationMeetings

Recommended Alternative

Alternatives Public Workshop

No-Build AlternativeBuild Alternatives

No-Build AlternativeBuild Alternatives

EnvironmentalAnalysis

Alternatives Refinement

Start Date:Spring 2016

Completion Date:Spring 2018

EngineeringData Collection

StakeholdersOutreach

Public Kick-off MeetingFort Lauderdale Marriott Coral Springs Hotel

11775 Heron Bay Boulevard Coral Springs, Florida 33076

Tuesday, November 15, 20165:30 PM - 7:30 PM

Page 2: PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right

SAWGRASS EXPRESSWAY (SR 869) WIDENINGFROM SOUTH OF US 441 (SR 7) TO POWERLINE ROAD (SR 845)

MILEPOST 18.0-22.0 FINANCIAL PROJECT ID NUMBER: 437153-1-22-01

SAWGRASS EXPRESSWAYPROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Public Kick-off MeetingFort Lauderdale Marriott Coral Springs Hotel

11775 Heron Bay Boulevard Coral Springs, Florida 33076

Tuesday, November 15, 20165:30 PM - 7:30 PM

PROJECT STUDY AREA

Florida Department of Transportation

Regency Lakes Blvd

Interchange/Intersection LOS E & LOS FLEGEND

Project Limits

Parkland

Coral Springs

Coconut Creek

Deerfield Beach

UnincorporatedBroward County

Study AreaN

PROJECT LIMIT

PROJECT LIMIT

PROJECT LIMIT

PROJECT LIMIT

Johnson Road

Lyon

s Ro

ad

Wiles Road

Wiles Road

Pow

erlin

e Ro

ad

SW 10th Street

Hillsboro Boulevard

Page 3: PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right

SAWGRASS EXPRESSWAY (SR 869) WIDENINGFROM SOUTH OF US 441 (SR 7) TO POWERLINE ROAD (SR 845)

MILEPOST 18.0-22.0 FINANCIAL PROJECT ID NUMBER: 437153-1-22-01

SAWGRASS EXPRESSWAYPROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Public Kick-off MeetingFort Lauderdale Marriott Coral Springs Hotel

11775 Heron Bay Boulevard Coral Springs, Florida 33076

Tuesday, November 15, 20165:30 PM - 7:30 PM

Additional lanes are needed by the year 2020

PURPOSE - To add capacity to meet future transportation demand (Year 2040), improve travel time reliability and to provide long-term mobility options. The project includes operational, capacity and safety enhancements at the US 441 (SR 7), Lyons Road and Florida’s Turnpike (SR 91) interchanges and Powerline Road intersection.

NEEDS OF THE PROJECT

38-63% increase in traffic from year 2014 to 2040

• South of US 441: 1 new lane by 2020. • US 441 to Lyons Road: 1 new lane by 2020 and 2 new lanes

by 2039. • Lyons Road to Florida’s Turnpike: 2 new lanes by 2020 and

3 lanes by 2035. • Florida’s Turnpike to Powerline Road: 1 new lane by 2023. • Interchange Improvements.

Corridor Traffic Demand• South of US 441: 38% Increase• East of Florida’s Turnpike: 63% Increase

Speeds drop to 20-50 MPH

Corridor Capacity Needs

Travel Time Reliability• Speeds drop to 20-50 MPH

during peak periods.

MPH

Increase in population will result in increased traffic

Population Growth• Broward County population will increase by 12% between 2010 and 2040.• Population of surrounding cities will grow between 11% and 21%.

Long-Term Mobility• Residents and workers in the area will face

severe congestion affecting their economic viability and quality of life.

• Congestion will lead to increase in accidents.

2010 2040

Emergency Evacuation• This corridor is critical during

emergency evacuation periods.

System Linkage• This project provides continuous

express lanes along the Sawgrass Expressway and connects with the future Florida’s Turnpike express lanes.

Severecongestion affects economyof the cities

Transit Operations• Existing congestion impacts

transit operations• Express Lanes provide

opportunities for transit expansions

Part of emergencyevacuation

route

Impacting transit

operations

Safety• Congestion will lead to

increase in accidents.

Missing link for continuous express lanes service

Collisions due to tight

spacing and constant

stop-and-

go

Page 4: PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right

SAWGRASS EXPRESSWAY (SR 869) WIDENINGFROM SOUTH OF US 441 (SR 7) TO POWERLINE ROAD (SR 845)

MILEPOST 18.0-22.0 FINANCIAL PROJECT ID NUMBER: 437153-1-22-01

SAWGRASS EXPRESSWAYPROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Public Kick-off MeetingFort Lauderdale Marriott Coral Springs Hotel

11775 Heron Bay Boulevard Coral Springs, Florida 33076

Tuesday, November 15, 20165:30 PM - 7:30 PM

NO-BUILD ALTERNATIVE CONDITIONS

LEVEL OF SERVICE (LOS) DEFINITIONSFree-flow traffic with individual users virtually unaffected by the presence of others in the traffic stream.

Stable traffic flow with a high degree of freedom to select speed and operating conditions but with some influence from other users.

LOS A

LOS B

LOS C

LOS D

LOS E

LOS F

Restricted flow that remains stable but with significant interactions with others in the traffic stream. The general level of comfort and convenience declines noticeably at this level.

High-density flow in which speed and freedom to maneuver are severely restricted and comfort and convenience have declined even though flow remains stable.

Unstable flow at or near capacity levels with poor levels of comfort and convenience.

Forced traffic flow in which the amount of traffic approaching a point exceeds the amount that can be served. LOS F is characterized by stop-and-go waves, poor travel times, low comfort and convenience, and increased accident exposure.

Florida Department of Transportation

Interchange/Intersection LOS E & LOS FLEGEND

Project Limits

Ramp2014 LOS E2020 LOS F

Mainline Weave2014 LOS F

Intersection2014 LOS F

Intersection2014 LOS E

Intersection2014 LOS E2030 LOS F

Ramp2030 LOS F

Ramp2020 LOS F

CD System2030 LOS F

CD System2030 LOS F

Mainline2030 LOS F

Mainline Weave2030 LOS E

Intersection2030 LOS E2040 LOS F

Intersection2014 LOS E2030 LOS F

Intersection2030 LOS E2040 LOS F

Intersection2040 LOS E

Intersection2020 LOS E2030 LOS F Intersection

2040 LOS F

Mainline2020 LOS E2030 LOS F

Mainline2020 LOS E2030 LOS F

N

LEGENDProject Limits

2014-2040% Increasein Traffic

38%

Johnson Road

Hillsboro Boulevard

Lyon

s Ro

ad

Wiles Road

Wiles Road

Pow

erlin

e Ro

ad

SW 10th Street

38%42%

63%

72%

63%

Page 5: PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right
Page 6: PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right
Page 7: PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right

SAWGRASS EXPRESSWAY (SR 869) WIDENINGFROM SOUTH OF US 441 (SR 7) TO POWERLINE ROAD (SR 845)

MILEPOST 18.0-22.0 FINANCIAL PROJECT ID NUMBER: 437153-1-22-01

SAWGRASS EXPRESSWAYPROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Public Kick-off MeetingFort Lauderdale Marriott Coral Springs Hotel

11775 Heron Bay Boulevard Coral Springs, Florida 33076

Tuesday, November 15, 20165:30 PM - 7:30 PM

MIAMI-DADE

BROWARD

PALM BEACH

41

27

95

195

595

75

75

826997

1

710

98

Indiantown Rd.

80441

441

Boynton Beach Blvd.

Griffin Rd.

Atlantic Blvd.

95

SawgrassExpressway

S.R. 821 (HEFT)

Don ShulaExpressway

DolphinExpressway

GratignyParkway

SOUTH FLORIDA EXPRESS LANES

September 6, 20160 5 10 15 202.5

Miles

FDOT In Operation

FDOT Construction

County BoundarySecondary RoadPrimary RoadInterstateOther Toll RoadTurnpike FacilityFTE Planning

FDOT Planning

FTE PD&E Study

FDOT PD&E Study

FTE ConstructionFDOT Design

FTE Design

LEGEND

FDOT EXPRESS LANES

FTE EXPRESS LANES

SOUTH FLORIDA EXPRESS LANES

Project Study Area

Page 8: PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right

SAWGRASS EXPRESSWAY (SR 869) WIDENINGFROM SOUTH OF US 441 (SR 7) TO POWERLINE ROAD (SR 845)

MILEPOST 18.0-22.0 FINANCIAL PROJECT ID NUMBER: 437153-1-22-01

SAWGRASS EXPRESSWAYPROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Public Kick-off MeetingFort Lauderdale Marriott Coral Springs Hotel

11775 Heron Bay Boulevard Coral Springs, Florida 33076

Tuesday, November 15, 20165:30 PM - 7:30 PM

PD&E STUDY MILESTONE SCHEDULE

PROJECT MILESTONES2016 2017 2018

JanFebMar

AprMayJun

JulAugSep

OctNovDec

JanFebMar

AprMayJun

JulAugSep

OctNovDec

JanFebMar

AprMayJun

Begin StudyData CollectionPublic Kick-off MeetingEngineering and Environmental AnalysesAlternatives Public Information MeetingDraft DocumentationPublic HearingFinal DocumentationStudy CompletedPublic Involvement

Schedule Subject to Change

TONIGHT’S MEETING

Page 9: PD&E STUDY PROCESS · PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY PHASE Planning PHASE PD&E Study TRANSPORTATION DEVELOPMENT PROCESS 1 2 Final Design & PHASE 3 Engineering Right

SAWGRASS EXPRESSWAY (SR 869) WIDENINGFROM SOUTH OF US 441 (SR 7) TO POWERLINE ROAD (SR 845)

MILEPOST 18.0-22.0 FINANCIAL PROJECT ID NUMBER: 437153-1-22-01

SAWGRASS EXPRESSWAYPROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

Public Kick-off MeetingFort Lauderdale Marriott Coral Springs Hotel

11775 Heron Bay Boulevard Coral Springs, Florida 33076

Tuesday, November 15, 20165:30 PM - 7:30 PM

COORDINATION WITH ADJACENT PROJECTSPD&E STUDIES

DESIGN PROJECTS1. Sawgrass Expressway Design Project - FTE Project/FPID# 437155-1• Add express lanes and interchange improvements between south of Sunrise

Boulevard and north of Atlantic Boulevard2. Sawgrass Expressway Design Project - FTE Project/FPID# 435461-1• Add express lanes and interchange improvements between north of

Atlantic Boulevard and south of US 4413. Florida’s Turnpike Design Project - FTE Project/FPID# 406150-1• Add express lanes and interchange improvements between Atlantic

Boulevard and Wiles Road4. Florida’s Turnpike Design Project - FTE Project/FPID# 415927-1 and 418214-1• Add express lanes and interchange improvements between Hillsboro

Boulevard and Glades Road

BROWARD COUNTY

PALM BEACH COUNTY

POMPANO BEACH

Sample Road

MARGATE

TAMARACCommercial Boulevard

Atlantic Boulevard

Sunrise Boulevard

Univ

ersit

y D

rive

Univ

ersit

y D

rive

Oakland Park Boulevard

Glades Road

Palmetto Park Road

Hillsboro Boulevard

SW 10th Street

Wiles Road

Pow

erlin

e Ro

ad

Lyon

s Roa

d

Cor

al R

idge

Driv

e

1. Sawgrass Expressway PD&E Study - FTE Study/FPID# 435763-1• Add express lanes and interchange improvements between south of Sunrise

Boulevard and south of US 4412. Sawgrass Expressway PD&E Study - FTE Study/FPID# 437153-1• Add express lanes and interchange improvements between south of US 441

and Powerline Road3. SW 10th Street PD&E Study - FDOT Study/FPID# 439891-1 • Widening and intersection improvements between Powerline Road and I-95• A Broward County Consensus Building was completed in 2016 by the MPO

with 18 recommendations to move forward to the PD&E Study4. I-95/SW 10th Street Interchange PD&E Study - FDOT Study/FPID# 436964-1• Interchange improvements