PC-based systems
... the safe decision. 2 (mm 9910)ELOPII-E 1999.PPT
Continuity in the work process...
• ELOP II-NT effectively connects the
individual work stages of engineering
process up to the operation of the
PES according to IEC 61131-3
• Continuity in the work process
by tools which match each other for
more efficiency
Double work processes resulting from a
lack of interfaces between project stages is
an unnecessary waste of time and money
PC-based systems
... the safe decision. 3 (mm 9910)ELOPII-E 1999.PPT
• The entire range of functions necessary for
planning, designing the logic and off-line testing
is provided
• The ELOP II-NT Engineering Package fulfils all
the requirements placed on hardware-neutral
engineering and the programming of the HIMA
PES
• The Operation Package integrates all functions
following safe operation and smooth
maintenance of the HIMA PES
...and full range of function.
PC-based systems
... the safe decision. 4 (mm 9910)ELOPII-E 1999.PPT
• The Professional Package comprises both the
Engineering and Operation Package
• Engineering Package helps to devise target system
neutral function plans according to IEC 61131-3
and configuration of the HIMA PES
• The Operation Package allows safe operation and
smooth maintenance of the HIMA PES
• The Lite Package is made for the A-Series
programable micro controlers and H11(up to 64
process variables)
...for more efficiency.
PC-based systems
... the safe decision. 5 (mm 9910)ELOPII-E 1999.PPT
Engineering• The logic entry is performed by simply Drag & Drop of the
desired functions• Off-Line Simulation for controlling the logic
without a connected PES• Auto-rooting of connection lines• Languages: FBD, SFC• Import- / export function for variables (CSV)• Up to 256 characters for tagnames
(KKS possible)• User access levels• Document management direct in ELOP II-NT
...by open systems.
PC-based systems
... the safe decision. 6 (mm 9910)ELOPII-E 1999.PPT
Operation• Continuity of non-related work processes by complementation
of hardware-neutral function plans withHIMA-specific configurations for HIMAPES H41q/ H51q, A1, H11
• Download and monitoring function for the PES• Online test capability• Addressing for serial communication• Revision management• Reload function (on-line modifications)• Diagnostic function for PES
...by tools which match each other.
PC-based systems
... the safe decision. 7 (mm 9910)ELOPII-E 1999.PPT
Minimum Recommended
Processor Pentium Pentium II
133 MHz 400 MHz
RAM 64 MB 128 MB
Graphics 2 MB 8 MB
XGA XGA
Operating system
Windows NT Ò Workstation
(latest service pack
recommended)
Hardware requirements
PC-based systems
... the safe decision. 8 (mm 9910)ELOPII-E 1999.PPT
Work shell
Context Menuto addelements
ProjectStructure
Editing windowHere will be displayed thefunction plan of a function,function block or program afteropening
PC-based systems
... the safe decision. 9 (mm 9910)ELOPII-E 1999.PPT
Project structure
Project Name
User Library Configuration
Resource
IEC 61131-3Library
HIMA StandardBlocks
PC-based systems
... the safe decision. 10 (mm 9910)ELOPII-E 1999.PPT
Inserting of new structure elements
NewConfiguration
New Library
Context Menueof the projectfor insertingnew elements
PC-based systems
... the safe decision. 11 (mm 9910)ELOPII-E 1999.PPT
Project structure
Function F6217
Specific userfunctionblocks
IEC 61131-3functions
Specific HIMAfunctionblocks
IEC 61131-3functionsblocks
Open block
PC-based systems
... the safe decision. 12 (mm 9910)ELOPII-E 1999.PPT
Adding new POUs
New POUs
New Library
Context Menuof the Libraryfor addingelements
PC-based systems
... the safe decision. 13 (mm 9910)ELOPII-E 1999.PPT
Editing Functions, Function Blocks and Programs
List ofvariables
FBD-Editor
FBD View
Page View
Drag & Drop
Double clickto open FBDEditor
PC-based systems
... the safe decision. 14 (mm 9910)ELOPII-E 1999.PPT
Sequential Function Chart
List ofvariables
FBD-Editor
FBD View
SFC
PC-based systems
... the safe decision. 15 (mm 9910)ELOPII-E 1999.PPT
Context Menuof theConfigurationfor addingelements
NewResource
Resource
PC-based systems
... the safe decision. 16 (mm 9910)ELOPII-E 1999.PPT
Resource type
Context Menuof theresource forhardwareassignmentand insertingthe programinstanceAdd the program
instance
Assignment of the ressource
PC-based systems
... the safe decision. 17 (mm 9910)ELOPII-E 1999.PPT
Context menue of the ressource
Context menueof resourceafterressource-assignmentandinstanziation ofthe program
Startcodegenerator
Control Panelfor loadingPES
On-Line-Test
Edit cabinetlayout
PC-based systems
... the safe decision. 18 (mm 9910)ELOPII-E 1999.PPT
Cabinet Layout
Drag & Drop
Cabinet
IO-Rack
CPU Rack
List ofmodules
PC-based systems
... the safe decision. 19 (mm 9910)ELOPII-E 1999.PPT
Control Panel
Control Panel
Online TestView
Online TestField
PC-based systems
... the safe decision. 20 (mm 9910)ELOPII-E 1999.PPT
Communication
• Communication modules F 8625 and F 8626
can be added to the cabinet layout for all
H51q PES
• No additionial configuration required
• Communication to upper automation level by
simple Drag & Drop
F8625 Ethernet plus TCP/IP
F8626 Profibus-DPSlave
PC-based systems
... the safe decision. 21 (mm 9910)ELOPII-E 1999.PPT
Integrated Safety
Safe code generation for new project
• two times compilation with standard C-compiler in separate
tasks
• Target Code comparison
Safe data transfer into target system
C-Code comparison of old and changed project
• Safe detection of changed logic, variables and
constants in program per POU(Program Organisation Unit)
PC-based systems
... the safe decision. 22 (mm 9910)ELOPII-E 1999.PPT
• No need for an additional complete
function-test for systems of the
H51q/H41q family required
• Only changes have to be approved
...for more efficiency.
User specification
documents
C-CodeC-Code(old)
C-Codecomparator
changes
Target code
Input dataBackup data
Target codeComparatorPES
H41q/H51q
GNU C-Compiler
Target code
PC-based systems
... the safe decision. 23 (mm 9910)ELOPII-E 1999.PPT
Import / Export function
Fast and easy im-/export including communication-settings via:
• BUSCOM with addresses (OPC, Profibus-DP ,MODBUS)
• HIPRO-S and HIPRO-N
• Event settings with referring protocol text
• Import via ODBC from e.g. Excel, Access, DBase
PC-based systems
... the safe decision. 24 (mm 9910)ELOPII-E 1999.PPT
HIMA HIMA communication
Safe communication between existing HIMA PES H41/H51, A1
programmed with ELOP (V5.0-5) and H41q/H51q programmed
with ELOP II-NT (V7.0-7) via HIPRO-S protocol certified up to
AK6/SIL3
• Master has to be assigned to the ELOP II-NT PES
• No mix between PES master programmed with
ELOP and ELOP II-NT on the same bus
PC-based systems
... the safe decision. 25 (mm 9910)ELOPII-E 1999.PPT
• Minimize/Restore structure window by apush-button for a better sized workingarea
• Error-State-Report in Project-Management• Insert page instead of shifting logic• Overall views for connectors and constants• Cross-reference list
High comfort
Error-State-Viewer Minimize/Restorestructure window