2
Pavement Preservation: Integrating Pavement Management to Selecting Pavements for Preventive Maintenance Training Agenda October 4, 2017 Oklahoma DOT, 2609 Hwy 77 W, Perry, OK Topic Duration (minutes) Start End 1 Welcome and Introductions 15 8:30 am 8:45 am 2 Evaluating the Impact of Pavement Preservation on Pavement Management System 30 8:45 am 9:15 am 3 Introduction to Pavement Preventive Maintenance Concepts 30 9:15 am 9:45 am Break 15 9:45 am 10:00 am 4 Influence of Pavement Condition on Project Selection 30 10:00 am 10:30 am 5 Workshop 1: Evaluating Pavements for Pavement Maintenance 30 10:30 am 11:00 am 6 Preventive Maintenance Treatments 30 11:00 am 11:30 am Lunch 60 11:30 am 12:30 pm 7 Pavement and Treatment Feasibility 45 12:30 pm 1:15 pm 8 Workshop 2: Identifying Feasible Treatments and Strategies 30 1:15 pm 1:45 pm Break 15 1:45 pm 2:00 pm 9 The Selection Process 45 2:00 pm 2:45 pm 10 Workshop 3: Determining the Most Appropriate Strategy 30 2:45 pm 3:15 pm 11 Summary and Review 30 3:15 pm 3:45 pm Course Overview: This training is designed to provide participants with an introduction to pavement preservation so that they can better use it to familiarize themselves with general information on concepts and techniques. Target Audience: This training is ideal for roadway construction and maintenance teams, specifically the highway workers and inspectors involved in the placement of pavement preservation treatments. Design engineers will also benefit from the associated training. Learning Outcomes: Upon completion of this training, participants will be able to: Identify the components and value of a Pavement Preservation program;

Pavement Preservation: Integrating Pavement Management to Selecting Pavements … Perr… ·  · 2017-09-19Pavement Preservation: Integrating Pavement Management to Selecting Pavements

Embed Size (px)

Citation preview

Pavement Preservation: Integrating Pavement Management to Selecting Pavements for Preventive Maintenance

Training Agenda October 4, 2017 Oklahoma DOT, 2609 Hwy 77 W, Perry, OK

Topic Duration(minutes)

Start End

1 WelcomeandIntroductions 15 8:30am 8:45am2 EvaluatingtheImpactofPavementPreservationonPavement

ManagementSystem30 8:45am 9:15am

3 IntroductiontoPavementPreventiveMaintenanceConcepts 30 9:15am 9:45am Break 15 9:45am 10:00am4 InfluenceofPavementConditiononProjectSelection 30 10:00am 10:30am5 Workshop1:EvaluatingPavementsforPavementMaintenance 30 10:30am 11:00am6 PreventiveMaintenanceTreatments 30 11:00am 11:30am Lunch 60 11:30am 12:30pm7 PavementandTreatmentFeasibility 45 12:30pm 1:15pm8 Workshop2:IdentifyingFeasibleTreatmentsandStrategies 30 1:15pm 1:45pm Break 15 1:45pm 2:00pm9 TheSelectionProcess 45 2:00pm 2:45pm10 Workshop3:DeterminingtheMostAppropriateStrategy 30 2:45pm 3:15pm11 SummaryandReview 30 3:15pm 3:45pm

CourseOverview:Thistrainingisdesignedtoprovideparticipantswithanintroductiontopavementpreservationsothattheycanbetteruseittofamiliarizethemselveswithgeneralinformationonconceptsandtechniques.TargetAudience:Thistrainingisidealforroadwayconstructionandmaintenanceteams,specificallythehighwayworkersandinspectorsinvolvedintheplacementofpavementpreservationtreatments.Designengineerswillalsobenefitfromtheassociatedtraining.

LearningOutcomes:Uponcompletionofthistraining,participantswillbeableto:• IdentifythecomponentsandvalueofaPavementPreservationprogram;

• Identifythepavementconditionsandotherattributesthatsuggestwhetherpavementpreservationisappropriate;

• Identifyvariouspavementpreservationstrategies,techniques,andmaterials;• Statetheperformancecharacteristicsofvariouspavementpreservationstrategies,techniques,and

materials;and• Selecttheappropriatestrategy(ies),technique(s),andmaterialtoextendtheservicelifeandretard

thedevelopmentofpavementdistress.