    PalaboraSouth Africa

    PROFIBUS-PAApplication Palabora Mining

  • 7/28/2019 Palabora PA Reference

    2/10

    PROFIBUS-PAApplication

    Palabora Mining

    THE DECISION TO GO UNDERGROUND

    When open pit copper minig commenced at

    Palabora in 1966, the mine was planned to

    operate for 20 years only.

    However, increases in the production rate and

    the resulting economies of scale led to the cut-

    off grade being decreased. This in turn allowed

    a total of five extensions of the mine life. Open

    pit operations are now sheduled to the end of

    the year 2002

    Studies show that the orebody continues below the bottom of the final open pit shell and is open at

    depth. Over one kilometre of this orebody is calssified as proven reserves and studies to assess the

    economic feasability of extracting the ore have been underway since as early as 1979. After over a

    decade of investigation by a team of international specialists renowned for their expertise in this

    field, the following conclusion was reached: An underground mine, utilising block caving toextract 30 000 tons of ore per day, provided an economically viable way to obtain maximum

    utilisation of exsisting ore deposits.This will extend the life of Palabora Mining Company by at

    least another 20 years.

  • 7/28/2019 Palabora PA Reference

    3/10

    PROFIBUS-PAApplication

    Palabora Underground Mining Project

  • 7/28/2019 Palabora PA Reference

    4/10

    PROFIBUS-PAApplication

    Palabora Underground Mining Project

    Auxiliaries: 1st Phase Refrigeration Plant

  • 7/28/2019 Palabora PA Reference

    5/10

    PROFIBUS-PA

    Auxiliaries:

    1st Phase

    Refrigeration Plant

    Application

    Palabora Underground Mining Project

    The Palabora surface refrigeration system comprisesof a precooling tower system cooling 210 l/s of

    make up water which is supplied to three mechanicalrefrigeration plans of 18 MW refrigeration capacity.

    The refrigeration is utilised to cool 516 m/s of ambientair to 14,6 C, and to supply 60 l/s 24 hour average 1C

    water to the mine for service water use.

  • 7/28/2019 Palabora PA Reference

    6/10

    PROFIBUS-PA

    1st Phase:

    Refrigeration Plant

    and Conveyor Belts

    Application

    Palabora Underground Mining Project

    Siemens

    ET 200

    Remote I/O

    DanfossAC Motor

    Speed

    Controller

    ASI

    Switches

    DP/ASI-Link

    Visualisation

    WinCC

    Control

    SIMATIC S7

    Siemens

    Control System

    PCS 7

    fibre optical Industrial Ethernet

    PROFIBUS-DP Fibre Optical

    Samson

    Control

    Valve Cerabar S

    Mycom L

    Promag 3 3

    Deltabar

    3 Ammonia Refrigerators

    TMD 834

    Deltapilot S

    ConveyorBelts

    Segmentcoupler Brkert

    Solenoid

    Valves

    PROFIBUS-PA

    IEC 1158-2

    Engineering

    COMMUWIN II

  • 7/28/2019 Palabora PA Reference

    7/10

    PROFIBUS-PA

    Endress+Hauser Transmitters

    Application

    Palabora Underground Mining Project

    Level

    18x Deltapilot S8x Prosonic

    Pressure

    13x Cerabar S28x Deltabar S

    Temperature

    61x TMD 834

    Flow

    17x Promag 33

    3x Promass 63Analysis

    2x Mycom L

  • 7/28/2019 Palabora PA Reference

    8/10

    PROFIBUS-PAApplication

    Palabora Underground Mining Project

    Proximity Switches

    Other instruments

    Control Valves

    Solenoid Valves

    Pressure Switches

    Flow Switches

    Level Switches

    Position Switches

    Flow control with Samson Control Valvesand E+H Coriolis Massflowmeter Promass 63

  • 7/28/2019 Palabora PA Reference

    9/10

    PROFIBUS-PA

    Distributed Control

    Application

    Palabora Underground Mining Project

  • 7/28/2019 Palabora PA Reference

    10/10

    PROFIBUS-PA

    Johan Venter, Project Manager and responable for the whole electronicalinstallations (including Measurement and Control):

    "The whole project will be finalized in 2002. Then the mine life is expectedfor another 20 years until 2023. it is obvious that we have to rely on todays

    latest technology to have a modern plant also in 2023. On the other handthe technology must be proven and reliable. PROFIBUS, established since1990, meets perfectly all these requirements. So that all our instruments inthe field will be able to 'talk to us' via PROFIBUS."

    Application

    Palabora Underground Mining Project

    Why Palabora chosePROFIBUS:

    Tremendous cost savingson installation

    Online accesss to the wholeinstallation (inc. Sensors and

    Actuators) from control room

    Drastically reduced documen-tation and planning efforts