13

PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle
Page 2: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle
Page 3: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle

Optional Construction-No dampers.

-For spiral pipe (shoe tap).

-Aluminum construction.

-1 12" Insulation Stand-offmounting bracket.

-Locking Quadrant handle.

-Option 1/2" Round Saft &Bronze Bushing

Standard Construction -24 ga. galvanized steel

construction.

-1" flange for securing

to duct.

-Gasket around flange.

-Sealed corner pieces.

-22 ga. "Stamped" blade.

-3/8" Square shaft

-Siliconized rubber bushing. 0% air

leakage at +40" w.g. PROJECT NAME:

W/O #:

TAG #:

CONTRACTOR:

SUBMITTED BY:

PAGE:AIR-RITE MFG. RESERVES THE RIGHT TO CHANGE

SPECIFICATIONS WITHOUT NOTICE.

Union "Blue Label" Made.

SUBMITTAL/FABRICATION DETAIL:

MODEL: ST-1HD HD HIGH EFFICIENCY SIDE TAKE-OFF

ST-1HD

6"

7"

8"

9"

10"

12"

14"

16"

18"

20"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

6.00"

7.00"

8.00"

9.00"

9.00"

10.50"

12.00"

10 1/2"

14.00"

18.00"

20.00"

14.00"

14.00"

18.00"

20.00"

22.00"

13.00"

15.00"

24.00"

24.00"

26.00"

1

2

3

4

5

6

1

4

5

6

23

A B C D

A

D

B

C

SizeCount

7

7

Page 4: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle

Optional Construction-No dampers.

-For spiral pipe (shoe tap).

-Aluminum construction.

-1 12" Insulation Stand-offmounting bracket.

-Locking Quadrant handle.

Standard Construction -24 ga. galvanized steel

construction.

-1" flange for securing

to duct.

-Gasket around flange.

-Sealed corner pieces.

-22 ga. "Stamped" blade.

-3/8" Square shaft

-High Pressure Low Leakage Silicone

rubber bushing PROJECT NAME:

W/O #:

TAG #:

CONTRACTOR:

SUBMITTED BY:

PAGE:AIR-RITE MFG. RESERVES THE RIGHT TO CHANGE

SPECIFICATIONS WITHOUT NOTICE.

Union "Blue Label" Made.

SUBMITTAL/FABRICATION DETAIL:MODEL: ST-1HDB HD HIGH EFFICIENCY SIDE TAKE-OFF

ST-1HDB

6"

7"

8"

9"

10"

12"

14"

16"

18"

20"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

10 1/2"

6.00"

7.00"

8.00"

9.00"

10.00"

12.00"

14.00"

10 1/2"

16.00"

18.00"

20.00"

12.00"

14.00"

16.00"

18.00"

22.00"

13.00"

15.00"

24.00"

22.00"

24.00"

1

2

3

4

5

6

1

4

5

6

23

A B C D

A

D

B

C

SizeCount

7

7

* Dimension C is Equal To

Dimension A

Page 5: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle

AIR-RITE MFG. RESERVES THE RIGHT TO CHANGESPECIFICATIONS WITHOUT NOTICE.

SIDE TAKE-OFF PRICINGHIGH EFFICIENCY TAKE-OFF

MODEL: ST-1, ST-1HD,ST-1HDB

6"Ø

8"Ø

10"Ø

35

105

40

51

64

80

90

126

67

72

78

84

90

108

12"Ø

14"Ø16"Ø

18"Ø20"Ø 220

6"Ø H.D.

8"Ø H.D.

10"Ø H.D.

12"Ø H.D.

14"Ø H.D.16"Ø H.D.

18"Ø H.D.20"Ø H.D. 150

ST-1HDB ADD 5%

LOCKING QUADRANT HANDLE ADD: $10.00

1 12" STAND-OFF ADD: $10.001/2" Rod & Bronze Bushing ADD 25%

Page 6: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle
Page 7: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle
Page 8: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle
Page 9: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle
Page 10: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle

Optional Construction -No dampers.

-Air scoop.

-Dove tail style.

Standard Construction -SMACNA approved gauges

on body.

-16 ga. blade.

-Continuous 38" square drive shaft. -16 ga. blade straps and hardware.

-Heavy duty nylon bushings.

-1 12" stand-off w/locking quadrant handle.

PROJECT NAME:

W/O #:

TAG #:

CONTRACTOR:

SUBMITTED BY:

PAGE:AIR-RITE MFG. RESERVES THE RIGHT TO CHANGESPECIFICATIONS WITHOUT NOTICE.

SUBMITTAL/FABRICATION DETAIL:MODEL: ST-3HDS HEAVY DUTY BELL MOUNTH SPIN-IN

Union "Blue Label" Made.

SPIN EDGE

6"

BLADE GAUGE

DIA. GAUGE

4 THRU 14

15 THRU 26

27 THRU 36

26

24

22

ST-3HDS

Count Size

1 12" STAND-OFFWITH QUAD. HANDLE

Page 11: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle
Page 12: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle
Page 13: PAGE · 2018. 7. 2. · Optional Construction-No dampers.-For spiral pipe (shoe tap).-Aluminum construction.-1 1 2" Insulation Stand-off mounting bracket.-Locking Quadrant handle