· n v e. n s' i fl e. fl Triconex Project: Purchase Order No.: Project Sales Order: '" PG&E PROCESS PROTECTION SYSTEM REPLACEMENT 3500897372 993754 PACIFIC GAS & ELECTRIC COMPANY NUCLEAR SAFETY-RELATED PROCESS PROTECTION SYSTEM REPLACEMENT DIABLO CANYON POWER PLANT PROTECTION SET III HARDWARE VALIDATION TEST REPORT Document No. 993754-13-854-0 Revision 0 September 12,2014 Author: Reviewers: A roval: Kevin Vu

PACIFIC GAS ELECTRIC COMPANY · 2016-03-09 · 6.0TEST RESULTS 6.1 TEST DOCUMENT EXECUTED . The table below provides a list of the test sections executed as defined in the Hardware

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PACIFIC GAS ELECTRIC COMPANY · 2016-03-09 · 6.0TEST RESULTS 6.1 TEST DOCUMENT EXECUTED . The table below provides a list of the test sections executed as defined in the Hardware

· n v e. n s · .~ s ' i fl v· e . fl S · .~ s·

Triconex Project: Purchase Order No.:

Project Sales Order:

'"

PG&E PROCESS PROTECTION SYSTEM REPLACEMENT 3500897372 993754

PACIFIC GAS & ELECTRIC COMPANY

NUCLEAR SAFETY-RELATED PROCESS PROTECTION SYSTEM

REPLACEMENT DIABLO CANYON POWER PLANT

PROTECTION SET III

HARDWARE VALIDATION TEST REPORT

Document No. 993754-13-854-0

Revision 0

September 12,2014

Author: Reviewers:

A roval: Kevin Vu

Gary.McDonald
NP Suffix
Gary.McDonald
Cover Page - Non-P copy of Redacted doc
Page 2: PACIFIC GAS ELECTRIC COMPANY · 2016-03-09 · 6.0TEST RESULTS 6.1 TEST DOCUMENT EXECUTED . The table below provides a list of the test sections executed as defined in the Hardware

Document: 993754-13-854-0 Title: Protection Set III Hardware Validation Test Report Revision: 0 Page: 2 of 8 Date: 09/12/2014

Document Change History

Revision Date Change Author 0 09/12/14 Initial issue S. Phan

Page 3: PACIFIC GAS ELECTRIC COMPANY · 2016-03-09 · 6.0TEST RESULTS 6.1 TEST DOCUMENT EXECUTED . The table below provides a list of the test sections executed as defined in the Hardware

Document: 993754-13-854-0 Title: Protection Set III Hardware Validation Test Report Revision: 0 Page: 3 of 8 Date: 09/12/2014

TABLE OF CONTENTS

1.0 PURPOSE ..................................................................................................... 4

2.0 TEST OBJECTIVE ..................................................................................... 4

3.0 DESCRIPTION OF THE TEST SYSTEM ............................................... 4

4.0 TEST SET-UP AND INSTRUMENTATION ........................................... 4

4.1 TEST SET-UP .............................................................................................................. 4

4.2 MONITORING INSTRUMENTATION AND INPUT SIMULATORS..................... 4

5.0 TEST PROCEDURE ................................................................................... 5

6.0 TEST RESULTS .......................................................................................... 5

6.1 TEST DOCUMENT EXECUTED ............................................................................... 5 6.2 ANOMALIES ............................................................................................................... 6 6.3 INTERIM CHANGES .................................................................................................. 7 6.4 TEST RESULTS SUMMARY ..................................................................................... 7

7.0 CONCLUSIONS .......................................................................................... 7

8.0 REFERENCES............................................................................................. 8

8.1 INVENSYS DOCUMENTS ........................................................................................... 8

9.0 ATTACHMENTS ........................................................................................ 8

9.1 ATTACHMENTS ........................................................................................................... 8

Page 4: PACIFIC GAS ELECTRIC COMPANY · 2016-03-09 · 6.0TEST RESULTS 6.1 TEST DOCUMENT EXECUTED . The table below provides a list of the test sections executed as defined in the Hardware

Document: 993754-13-854-0 Title: Protection Set III Hardware Validation Test Report Revision: 0 Page: 4 of 8 Date: 09/12/2014

1.0 PURPOSE

The objectives of this Hardware Validation Test (HVT) Report are: 1. To list all executed test documents related to the HVT of the safety-related V10

Tricon System Protection Set III 2. To provide a summary of the HVT test results 3. To document any test failures identify from the HVT procedure document 4. To document the review and approval of the HVT

2.0 TEST OBJECTIVE The objectives of the Hardware Validation Test [Ref. 8.1.3] are:

1. To confirm that the system hardware configuration is consistent with the issued

design documents and is in proper working order 2. To confirm that the test configuration is correct (the required test equipment is

properly calibrated and ready to support acceptance testing)

3.0 DESCRIPTION OF THE TEST SYSTEM The HVT testing was conducted in a controlled environment at the Invensys Facility in Lake Forest, CA. The test system used in system and HVT testing was as follows:

1. V10 Tricon System Protection Set III with HARDWARE_PROTECTION_SET_III, PT2 file.

2. TriStation Laptop with Windows 7™ , TriStation v 4.9.0

More information on the test system used is provided in the Validation Test Plan [Ref. 8.1.1].

4.0 TEST SET-UP AND INSTRUMENTATION

Gary.McDonald
P box
Page 5: PACIFIC GAS ELECTRIC COMPANY · 2016-03-09 · 6.0TEST RESULTS 6.1 TEST DOCUMENT EXECUTED . The table below provides a list of the test sections executed as defined in the Hardware

Document: 993754-13-854-0 Title: Protection Set III Hardware Validation Test Report Revision: 0 Page: 5 of 8 Date: 09/12/2014

used including serial numbers and calibration dates, refer to the executed HVT test document.

Additional information on the test set-up and instrumentation is provided in the Validation Test Plan.

5.0 TEST PROCEDURE The HVT procedures demonstrate the compliance of the integrated V10 Tricon System Protection Set III with the functional requirements as described in Section 2.0 Test Objective. The executed versions of the test are listed in Section 6.4 Test Results Summary.

6.0 TEST RESULTS 6.1 TEST DOCUMENT EXECUTED

The table below provides a list of the test sections executed as defined in the Hardware Validation Test Procedure. The information in the table is organized by Document Number, Revision, and Section, referred to hereafter as Test Document Section. The Interim Change Notice (ICN) column lists the ICN(s) that apply to the Test Document Section. The Completion column lists the sign off date for the Test Document step or section. The Anomaly Report column lists the System Integration Deficiency Report(s) (SIDR) written against the Test Document Section. For test details, refer to the HVT procedure in the executed test binders. Note: One SIDR may have resulted in any number of ICNs. One ICN may have been initiated by any number of SIDRs. SIDRs are listed only against the Test Document Section(s) that they were written against (i.e. where the anomaly occurred). ICNs are listed only against the Test Document Section(s) to which they were written and apply.

For details and traceability between SIDRs and ICNs, refer to Sections 6.2 Anomalies and 6.3 Interim Changes. Not all SIDRs initiated during HVT can be directly attributed to test procedure execution. (Refer to Section 6.2 Anomalies, for a complete list of SIDRs)

Gary.McDonald
P box
Page 6: PACIFIC GAS ELECTRIC COMPANY · 2016-03-09 · 6.0TEST RESULTS 6.1 TEST DOCUMENT EXECUTED . The table below provides a list of the test sections executed as defined in the Hardware

Document: 993754-13-854-0 Title: Protection Set III Hardware Validation Test Report Revision: 0 Page: 6 of 8 Date: 09/12/2014

Test Document ICN Completion Anomaly

Report Document Number / Section Title Rev Section 993754-13-902-0 (HVT Procedure Protection Set III) 0

Prerequisites 8.0 N/A N/A N/A Prerequisites Requirements 8.1 None 09/10/14 None Procedure 9.0 N/A N/A N/A Protection Set III Hardware Power-Up / Checkout Test 9.1 N/A N/A N/A

Tricon Test Cabinet Protection Set III 9.1.1 None 09/10/14 None Tricon Chassis Power Supply 9.1.2 None 09/10/14 None Communication Module(s) 9.1.3 None 09/10/14 None Field I/O Calibration Check – Protection Set III 9.2 N/A N/A N/A

Analog Input Module 3703EN 9.2.1 None 09/12/14 SIDR 1149

Analog Input Module 3721N 9.2.2 None 09/10/14 None Analog Output Module 3805E 9.2.3 None 09/10/14 None Digital Input Module 3503EN2, 3501TN2 and 3501E 9.2.4 None 09/10/14 None

Digital Output Module 3601TN 9.2.5 None 09/10/14 None Relay Output Module 3636T 9.2.6 None 09/10/14 None

6.2 ANOMALIES The table below provides a listing of the deficiencies identified and documented on System Integration Deficiency Reports (SIDR) during the HVT testing. See SIDR binder for complete detailed description and/or attachments.

Gary.McDonald
P box
Page 7: PACIFIC GAS ELECTRIC COMPANY · 2016-03-09 · 6.0TEST RESULTS 6.1 TEST DOCUMENT EXECUTED . The table below provides a list of the test sections executed as defined in the Hardware

Document: 993754-13-854-0 Title: Protection Set III Hardware Validation Test Report Revision: 0 Page: 7 of 8 Date: 09/12/2014

6.3 INTERIM CHANGES

The table below provides a listing of the Interim Change Notices (ICN) applied to the HVT procedure.

ICN Number

Description Approval Date

1 ICN None N/A

6.4 TEST RESULTS SUMMARY The testing implemented all the requirements for the Hardware Validation Test as described in the Validation Test Specification [Ref. 8.1.2] The HVT procedure and Appendix listed below was executed successfully and met the acceptance criteria as defined in the Validation Test Specification.

Test Procedure Document Number Revision

Hardware Validation Test Protection Set III 993754-13-902-0 0

Appendix Document Number Revision Appendix 2 - I/O Verification Checklist – Protection Set III

993754-13-902-0 0

7.0 CONCLUSIONS

After the execution of the HVT testing for the V10 Tricon System Protection Set II, the test results were independently reviewed by the Project Review Committee in accordance with PPM 6.0. This review ensured that the actual results met the acceptance criteria per the Validation Test Specification.

An anomaly report, (i.e. SIDR), was completed for any deficiencies found during testing. The completed anomaly reports are in the SIDR binder. There were a total of 1 SIDR generated during test execution.

The validation test results were reviewed. This review ensured that all necessary test documents were executed successfully, and complete.

Page 8: PACIFIC GAS ELECTRIC COMPANY · 2016-03-09 · 6.0TEST RESULTS 6.1 TEST DOCUMENT EXECUTED . The table below provides a list of the test sections executed as defined in the Hardware

Document: 993754-13-854-0 Title: Protection Set III Hardware Validation Test Report Revision: 0 Page: 8 of 8 Date: 09/12/2014

8.0 REFERENCES 8.1 INVENSYS DOCUMENTS 8.1.1 Validation Test Plan (VTP), 993754-1-813 Rev 3 8.1.2 Validation Test Specification (VTS), 993754-1-812 Rev 3 8.1.3 Protection Set III Hardware Validation Test (HVT) Procedure, 993754-13-902-0 Rev 0

9.0 ATTACHMENTS 9.1 ATTACHMENTS 9.1.1 Executed Protection Set III Hardware Validation Test Procedure, 993754-13-902-0