SYSTEM OVERVIEW The schematic and system overview drawings are
available here (pdf) and here (orcad)here
Slide 7
MAIN ENCLOSURE
Slide 8
E-STOP ENCLOSURE
Slide 9
POWER SUPPLY ENCLOSURE
Slide 10
POWER CONSUMPTION
Slide 11
PLC PROGRAM FLOWCHART
Slide 12
PLC MEMORY LAYOUT Ladder logic requires address referencing The
memory layout will show the allocation for all addresses
(variables) used in the PLC program Full details here (pdf) and
here (Excel)here
Slide 13
PLC GUI Used for initial setup and for starting sampling All
screens available here (pdf) and here (Cscape project)here Sample
user input screenPost-setup screen
Slide 14
FAULT CODES The means of communicating failure events to the
analysis program o Examples: Out-of-bounds measurements Loss of
communications User-initiated stops The full list is available here
(pdf)here Number of Values from VFD: 5 VFD Delay (ms): 8 Safety
Factor (ms): 2 Minimum Time per Sample (sec): 0.042 Maximum Sample
Rate (Hz): 23.8 Timing Calculations
Slide 15
ANALYSIS SOFTWARE (EXCEL) Load.csv filesCalculate needed values
Hydrodynamic Power Efficiency Slip Generate graphs Pump Degradation
Flow Curve All measured values over time
Slide 16
TEST PLAN Adjusted to better follow the MSD format Available
here (pdf)here
Slide 17
BUDGETING ANALYSIS Budget Analysis can be found here.
(pdf)here
Slide 18
BILL OF MATERIALS Bill of materials can be found here.
(pdf)here
Slide 19
MSD II SCHEDULING Jan. 13, 2014: World ends. Jan. 14, 2014: ???
May 23, 2014: Profit.
Slide 20
FINAL QUESTIONS? Questions? Comments? Thoughts of great
concern?