MGM BLOCK A TOWER OVERVIEW 

Presented by: Kim Lin September 26, 2007

Page 2: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

MGM BLOCK A TOWER 

§  BACKGROUND §  DESIGN & CHALLENGES §  CONSTRUCTION §  ADDITIONAL SEMINARS WILL COVER TECHNICAL DETAILS.

Page 3: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 4: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

` `

Page 5: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 6: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 7: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 8: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

SPECIAL THANKS TO THE TEAM §  DENNIS POON (Managing Principal) §  UDOM HUNGSPRUKE §  LEN JOSEPH §  MIKE DELASHMIT (Const. Manager) §  ANGELA HERNANDEZ (Construction) §  DALLAS DESIGN TEAM: 

KIM LIN, GREG BIEBERLY COREY GUO JONATHAN NEUBAUER TODD ZIMMERMAN, HEIN NGUYEN

Page 9: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

•DESIGN CONCEPT §  STRUCTURAL SYSTEM: §  CONCRETE SHEAR WALLS. §  CONCRETE COLUMNS §  POST­TENSIONED FLAT PLATE AT TYPICAL FLOORS. §  SLAB AND BEAMS AT CASINO, MECHANICAL FLOORS AND TOWER TOP WITH WINDOW WASHING CRANES §  HYBRID SYSTEM AT ELITE FLOORS. §  CONCRETE TRANSFER GIRDERS. §  HANGING COLUMNS BY USING DYWIDAG BARS. 

§  FOUNDATION SYSTEM: §  MAT OR PIER CAP ON DRILLED PIERS.

Page 10: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

§  DESIGN TOOLS: § LATERAL SYSTEM (INCLUDING CONCRETE WALL AND LINK BEAM DESIGN): ETABS. § POST­TENSIONED FLOORS: ADAPT 3D MODELER & DECON § SLAB AND BEAM FLOORS: SAFE & PCABEAM § COLUMNS : EXCEL SP READ SHEETS WITH PCACOL SOFTWARE § SHRINKAGE & CREEP: CHICAGO’S SPREADSHEET W/DALLAS UPDATES § FOUNDATION MAT: SAFE

Page 11: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• FOUNDATION SYSTEM §  CENTER, NORTH AND SOUTH CORES: 11 TO 13’­6” THICK MAT ON DRILLED PIERS 

§  COLUMNS PIER CAPS ON PIERS 

§  SUBGRADE CONDITION: UPPER 75 FEET: MODERATE TO STRONGLY CEMENTED CLAYEY GRAVEL WITH CLICHÉ. UNDERCONSOLIDATED, SATURATED, AND VERY SOFT SOIL DOWN TO 140 FEET. 

§  USED 48” DIAMETER DRILLED PIER TO 120 FEET. §  PIER FOUNDATION SETTLEMENT = 4­5 inches for Tower, 3­4” for Podium. 

§  IF USE MAT ALONE, SETTLEMENT=12 ­18 inches DUE TO THE LARGE FOOTPRINT, LOADS WILL BE TRANSFERRED TO DEEPER, SOFTER MATERIAL.

Page 12: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• FOUNDATION SYSTEM (cont.) §  TOP OF MAT @ 2111’, BOTTOM OF MAT @ 2099’, WATER TABLE @ 2088’. §  PIER AND MAT DESIGN CHALLENGES: ETABS MODEL, USING CQC METHOD, THE SRSS PROCESS YIELDED DIRECTIONLESS OUTPUT FOR FOUNDATION SYSTEM DESIGN. COMPARED THREE METHODS: 1. STATIC EQUIVALENT METHOD 

(ORIGINAL) 2. READING WALL FORCES & ASSIGNING DIRECTIONS (SAIFUL) 

3. SECTION­CUT.

Page 13: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• • FOUNDATION SYSTEM (cont.) 

§  EQX (Center Core): STATIC ­  Mx = 795,133 k’, My=1,312,333 k’ SAIFUL ­  Mx = 148,455 k’, My=2,803,508 k’ SECT CUT ­  Mx = 689,285 k’, My=   605,529 k’ §  EQY (Center Core): STATIC ­  Mx=2,531,667 k’, My= 377,142 k’ SAIFUL ­  Mx=1,109,605 k’, My= 602,733 k’ SECT CUT ­  Mx=1,043,068 k’, My= 558,122 k’

Page 14: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• LATERAL SYSTEM 

SOUTH CORE 

CENTER CORE 

NORTH CORE

Page 15: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

ETABS MODEL

Page 16: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

•LATERAL SYSTEM: 

§  SEISMIC DESIGN §  NY PRESENTED BASICS OF SEISMIC DESIGN PARAMETERS USED IN THEIR SD DESIGN IN PREVIOUS SEMINAR. 

§  FOUR WINGS AND CENTER CORE AREA, SD STAGE CHALLENGE WAS TO TUNE ALL CORES AND PLACE SHEAR WALLS WHERE REQUIRED TO REDUCE DIFFERENCES IN LATERAL BEHAVIOR. 

§  CD STAGE: –  ADDED PODIUM STRUCTURE. 

•  W/O PODIUM – MASS (WEIGHT) = 1.2 MILLION KIPS. •  W/ PODIUM – MASS (WEIGHT) = 1.36 MILLION KIPS (14 %) 

–  USED SEMI­RIGID DIAPHRAGM SYSTEM IN LIEU OF RIGID DIAPHRAGM SYSTEM.

Page 17: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• LATERAL SYSTEM (Cont.) 

§  WALL DESIGN AND DIAPHRAGM SHEAR TRANSFER: SHEAR WALLS DROP OFF AT DIFFERENT LEVELS, CONVENTIONAL RIGID DIAPHRAGM WILL CAUSE STRESS SPIKES AT WHERE WALLS DROP OFF. THIS IS SIMILAR TO USING SPRING OR PINNED BASE TO SIMULATE MAT/PILE FOUNDATION.

Page 18: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

•LATERAL SYSTEM (Cont.) §  SEMI­RIGID SYSTEM WAS ADAPTED. SHELL ELEMENTS WERE USED TO MODEL FLOOR SLABS. –  DISTRIBUTE HORIZONTAL FORCES BASED ON WALL STIFFNESS. 

–  DISTRIBUTE GRAVITY LOADS. –  BOTH SLABS AND COLUMNS NEED TO BE CHECKED FOR COMBINATION WITH SEISMIC INDUCED FLEXTUAL AND SHEAR FORCES. THE RESULTS SHOWED THE COMBINATIONS WITH SEISMIC FORCES DID NOT GOVERN THE SLABS AND GRAVITY COLUMN DESIGN.

Page 19: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• LATERAL SYSTEM (Cont.) 

§  WIND DESIGN: RWDI WIND FORCE RECOMMENDATION: §  DUE TO THE COMPLEXITY OF THE BUILDING, WIND LOADS WERE APPLIED AT C. G. OF EACH WING AT EACH FLOOR, PENDING FLOOR GEOMETRY. RWDI PROVIDED A TABLE OF 120 LOAD COMBINATIONS WITH DIFFERENT FACTORS, DIFFERENT DIRECTIONAL SIGNS TO THE NUMERIOUS LOADS. §  THIS MADE RUNNING ETABS VERY TIME CONSUMMING WHEN COMBINE WIND LOADS WITH GRAVITY AND SEISMIC LOADS.

Page 20: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

ETABS MODEL 

LEVEL 01

Page 21: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

ETABS MODEL 

LEVEL 02

Page 22: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

ETABS MODEL 

LEVEL 03

Page 23: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

FLOOR SYSTEM 

POUR STRIP #1 

POUR STRIP #2 

POUR STRIP #3 

POUR STRIP #4 

POUR STRIP #5 

POUR STRIP #6 

POUR STRIP #7

Page 24: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

ADAPT 3D MODELER

Page 25: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• SLAB DESIGN: §  ONE OF THE PRIMARY DIFFERENCE FROM SD TO CD WAS 

THAT ALL INTERIOR COLUMNS LOCATED ADJACENT TO SHEAR WALLS WERE TAKEN OUT: §  ELIMINATED 2 STORY HIGH STEEL TRANSFER GIRDERS AT HARMON LOBBY. 

§  THE DIFFERENTIAL SHORTENING BETWEEN COLUMNS AND SHEAR WALLS WILL BE HARDER TO CONTROL FOR HIGH RISE BUILDINGS. 

§  SLAB THICKNESS (8” VS. 9 ½”..USE L/44 TO L/45 AS A START) §  OTHER COORDINATION ITEMS FOR SLAB DESIGN: §  FLOOR OPENINGS (MECHANICAL SHAFTS, FCU’S, ROOF DRAINS, STAIR PRESSURIZATION SHAFTS, ETC.) 

§  ADA SHOWER RECESSES. §  CURTAIN WALL ANCHOR SIZES & LOCATIONS.

Page 26: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• SLAB DESIGN (Cont.) 

§  NO ELECTRIC CONDUITS INSIDE PT SLAB. §  REBAR OPTIMATIZATION: § FAST TRACK? § SIMPLICITY? § OPTIMATIZE WITH VARIOUS LENGTH OF BARS ACROSS THE WIDTH OF A CURVED BUILDING WITH SPAN CHANGES FROM 29 FEET TO 33 FEET.

Page 27: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• SLAB DESIGN (Cont.) 

§  SLAB DEFLECTIONS: §  TYPICAL PT BALANCES 75% OF SLAB SELF WEIGHT. §  DL DEFLECTION §  PT DEFLECTION §  DL+PT DEFLECTION §  LL DEFLECTION §  LONG TERM DEFLECTION §  CRITICAL FOR HOTEL WITH GLASS CURTAIN WALLS.

Page 28: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

SLAB DEFLECTION DUE TO DEAD WEIGHT

Page 29: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

SLAB DEFLECTION DUE TO POST­TENSIONING

Page 30: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

SLAB DEFLECTION DUE TO DEAD LOAD AND POST­TENSIONING

Page 31: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

SLAB DEFLECTION DUE TO LIVE LOAD

Page 32: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

• DESIGN STATISTICS §  BUILDING HEIGHT = 600 FEET MAXIMUM (FAA LIMIT IN LAS VEGAS) 

§  BASE FOOTPRINT = 112,000 S.F. §  TOTAL SQUARE FOOTAGE ~ 4.5 MIILLION §  USABLE FLOOR AREA ~ 3.9 MILLION S.F. §  TOTAL CONCRETE VOLUME ~ 250,000 C.Y. §  TOTAL POST­TENSIONING CABLES ~ 1,100 MILES (5.8 MILLION FEET LONG – 1,600 TONS) 

§  TOTAL REBAR QUANTITIES ~ 8,000 TONS

Page 33: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

•CONSTRUCTION §  FOUNDATION CONSTRUCTION: §  PIER DRILLING STARTED FROM JANUARY 2006.

Page 34: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 35: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

§ MAT CONSTRUCTION: § First Mat Poured – Center Core Mat 238 ft Long x 60 ft Max. Wide x 11 ft Deep § Thermalcouples Installed at 6 locations – Three Each Location. § Poured on the 24 th of June, 2006 from 1 AM to 8 AM. § Las Vegas Blvd. was closed to allow for 550 cement trucks to deliver 5,520 cubic yard of concrete.

Page 36: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 37: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 38: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 39: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 40: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 41: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 42: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 43: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 44: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 45: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

§  Concrete Pour for the first mat was completed at 8:30 AM §  Ambient Temperature during the Pour was 92 degrees. §  6 Hours after the Pour ­ 

90 @ BOTTOM, 90 @ MIDDLE, 75 @ TOP §  42 Hours after the Pour­ 

145 @ BOTTOM, 175 @ MIDDLE, 160 @ TOP §  48 Hours after the Pour – 

145 @ BOTTOM, 160 @ MIDDLE, 155 @ TOP §  DRAWING SPECIFIED THE MAXIMUM GRADIENT BETWEEN ANY TWO POINTS SHALL NOT EXCEED 77 DEGREES.

Page 46: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

UPPER FLOOR CONSTRUCTION

Page 47: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 48: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 49: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 50: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 51: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 52: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 53: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 54: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 55: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 56: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 57: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 58: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 59: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 60: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very
Page 61: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

MORE STATISTICS §  @ Level 17, Total Concrete Poured = 130,000 cubic yard, which is half of projected total concrete quantity. 

§  @ Level 19, the maximum foundation settlement was measured at 7/8”. @ Level 22, the maximum foundation settlement was measured at 9/16” (….!). The settlement for podium column adjacent to the Tower was 3/8”. Geotechnical Report estimates were 5” and 2” for Tower and Podium respectively.

Page 62: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

OTHER CHALLENGES §  FAST TRACK: §  STRUCTURAL IS 6 MONTH AHEAD OF ARCHITECTURAL & MEP FROM FOUNDATION UP TO LEVEL 25. 

§  3 MONTH AHEAD FOR LEVELS ABOVE. §  COORDINATION ITEMS: §  EMBEDS – CRANES, MONORAILS, TRACKS, HANDRAILS, LIFE LINES, LIGHTENING POLES,  ETC. 

§  CONDUITS AND PIPING – PENETRATIONS AND SUPPORTS. 

§  VE PROCESS WITH PEER REVIEW. §  CURTAIN WALL INSTALLATION: §  SLAB DEFLECTIONS. §  COLUMN & WALL CREEP AND SHRINKAGE §  CONSTRUCTION TOLERANCES .

Page 63: OVERVIEWthornton.s3.amazonaws.com/content_files/134/MGM_overview.pdf · § post tensioned flat plate at typical ... § concrete transfer girders. ... § this made running etabs very

CONCLUSION •  BACKGROUND •  DESIGN & CHALLENGES •  CONSTRUCTION