Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. nsmission Reliability Research Rev

Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability

Embed Size (px)

DESCRIPTION

Timeframes January 2003 March 2003 Scope of Real Time Monitoring Tools to Address Defined May 2003 Data Requirements Identified June 2003 Data Quality Needs and Data Quality Improvement Process Incorporate in Project August 2003 Project Started July 2003 First Draft of Integrated Report Completed Final Report Completed

Citation preview

Page 1: Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability

Overview of Framework for Tools to Archive and

Analyze Real Time Grid Data

Carlos Martinez

January 27-29, 2004Washington, D.C.

Transmission Reliability Research Review

Page 2: Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability

GoalsVision/Goal: Define and report the framework and constraints to be

addressed in developing tools to archive and analyze real-time grid data. The value of such a system would be better utilization of available data to improve reliability management, market monitoring and, ultimately, improved market efficiency.

Key Issues being addressed: Real time monitoring applications data requirements will be reviewed

Framework for data and information archiving systems will be researched to lay a foundation for effective and systematic data and information management for real-time monitoring of power systems

Data quality requirements will be identified and processes to improve data quality will be identified and reported.

Page 3: Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability

Timeframes

January2003

March2003

Scope of Real Time Monitoring

Tools to Address Defined

May2003

Data Requireme

nts Identified

June2003

Data Quality Needs and

Data Quality Improvement

Process Incorporate in Project

August2003

Project Started

July2003

First Draft of Integrated

Report Completed

Final Report Completed

Page 4: Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability

Reliability and Markets Data Needs

MonitoringTools for Monitoring and

tracking actual performance in real time looking for

early warning signs

Reliability Markets

MetricsEvaluate and develop standards that can be

quantified and measured

AssessmentDetermine impacts on reliability,markets efficiency and assets

utilization

Risk Assessment Grid Reliability Market Efficiency

AnalysisConvert archived monitoring into

meaningful information

Risk Analysis Grid Data Market Data Historical Data Key Reliability

Indicators

Grid Real-Time Performance Monitoring and Prediction

Platform (Grid-3P©)

Generation/Demand (ACE-Frequency Monitoring,Suppliers Performance) Grid (VAR Management, System Dynamics Monitoring) Markets

Page 5: Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability

CERTS Real Time Grid Monitoring Tools Roadmap

RTO/ISO FUNCTIONS

REAL-TIME PERFORMANCE MANAGEMENT

TECHNOLOGIESProbabilistic

Analysis & Risk Assessment

ContingencySelection

PerformanceMetrics

Data & InformationManagement

VisualizationTechnologies

Grid-3PPlatform

MONITORING

OPERATIONS

MARKETS

SECURITY

REAL-TIME SOFTWAREANALYSIS

STATE ESTIMATOR

SCADA andADVANCE

MEASUREMENTS

GENERAT I ON & TRANSM I SS I ON

REAL-TIMELOCAL CONTROL

WIDE-AREA AUTOMATIC CONTROL

AUTOMATIC SWITCHABLE

NETWORK

A

B

C

D

Page 6: Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability

Real Time Data – Physical Design GPS

Data Warehouse

Control Area RTDB

Internet

NERCNet

Market Genscape

Intranet

Utility

Data Warehouse

Control Area RTDB

NERC Princeton

CERTS

DB

Web

RT Monitoring (e.g. ACE/AIE) Archive Maintenance DB

PMU

SCADA

PMU

WAMS

B

Substation

ICCP Node EMS

Comm

CCP

3-5 sec delay

ICCP ICCP D

A

E

F

C

Page 7: Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability

Data Quality Improvement Process

Identify and Define Intrinsic Data Characteristics

Identify and Define Applications Context Data Utilization Requirements

Market Database

SCADA/EMS Database

PI Database

NetworkDatabase

POWER SYSTEM DOMAINS

CurrentData Quality vs

New Requirmnts

Define New Data Quality Requirements

Cost Benefit Assessment and Data Quality Improvements

Use and Evaluate Data

Fix Data

Satisfactory

Not Satisfactory

IdentifyIntended and Potential Data

Users and Purposes

IdentifySources and Owners of Data and Applications

Page 8: Overview of Framework for Tools to Archive and Analyze Real Time Grid Data Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability

Data Quality Control Procedure

Initial Data Check

Advanced Data Check

Gen DB

Grid Data

Generation Data Initial Data Check

Grid Analysis (e.g. load flow study)

Security Analysis Market Analysis

Advanced Data Check

Initial Data Check

Advanced Data Check

Market Data

Performance Data

Grid DB

Market DB

Performance DB

Data flow

Quality control information

Local Generation Analysis

Local Market Analysis